CHAMBERS FM 2936 (2951-01-009)

Items: 58

County: CHAMBERS
Length: N/A
Highway: FM 2936
District: BEAUMONT
Control Number: 2951-01-009
DBE Goal: 500.0%
Project: STP 2B24(281)HES
Guaranty: N/A
Time: 97 WORKING DAYS
Engineer's Estimate: $1,600,599.80
Date: 07/09/2024 (1 year ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
ROBERTO M RODRIGUEZ
NYEMB NYEMB
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,600,599.80
Over/Under Est: -2.27% -$36,285.05
Over/Under Est: 4.4% $70,439.86
Amt Left: 6.82% $106,724.91
$2,204,514.50
Over/Under Est: 37.73% $603,914.70
Amt Left: 40.93% $640,199.75
Delta: -31.92% -$533,474.84
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 16.99% $291,283.22
HIGHWAY 1 LLC 3.92% $67,206.02
CEN TEX HYDROSEED, INC. 1.91% $32,745.79
H J HENKE, LLC 0.95% $16,287.17
PROFESSIONAL TRAFFIC CONTROL LLC 0.45% $7,714.98
Total: 24.22% $415,237.18

Bid Items & Bid Tabulations

58 Total 0 of 58
CHAMBERS  |  FM 2936  |  BEAUMONT  |  2951-01-009  |  07/09/2024  |  $1,600,599.80  |  STP 2B24(281)HES  |  HAZARD ELIM & SAFETY  |  97 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
TEXAS MATERIALS GROUP, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 21.000 $1,000.000 $1,500.000 $2,500.000 $9,500.000
SUBGRADE WIDENING (ORD COMP)
STA 21.000 $380.300 $575.000 $1,400.000 $850.000
BACKFILL (TY A OR B)
STA 21.000 $250.600 $1,250.000 $600.000 $450.000
BLADING
LF 500.000 $5.200 $25.000 $7.000 $50.000
BROADCAST SEED (TEMP) (WARM)
SY 10,049.000 $0.180 $0.250 $0.160 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 10,049.000 $0.200 $0.250 $0.160 $1.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 20,098.000 $0.500 $0.540 $0.420 $1.000
VEGETATIVE WATERING
MG 81.000 $19.900 $20.000 $100.000 $50.000
ASPH (AC-20-5TR)
GAL 414.000 $5.000 $44.000 $11.000 $20.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 33.100 $180.000 $150.000 $430.000 $600.000
CEM STABIL BKFL (SPL)
CY 71.000 $156.500 $250.000 $120.000 $350.000
RC PIPE (CL III)(30 IN)
LF 4.000 $134.700 $350.000 $270.000 $300.000
RC PIPE (CL III)(48 IN)
LF 40.000 $283.200 $450.000 $625.000 $450.000
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $9,200.000 $5,500.000 $8,400.000 $12,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 14.000 $1,429.500 $1,200.000 $1,050.000 $2,200.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $2,413.600 $1,500.000 $1,300.000 $2,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 24.000 $2,645.000 $2,500.000 $1,450.000 $2,500.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 6.000 $3,520.000 $3,000.000 $2,100.000 $3,500.000
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 10.000 $8,660.900 $8,500.000 $7,600.000 $10,000.000
REMOV STR (PIPE)
LF 62.000 $66.000 $60.000 $42.000 $50.000
MOBILIZATION
LS 1.000 $145,509.070 $125,000.000 $123,500.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $7,710.000 $5,000.000 $2,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 274.000 $52.800 $45.000 $57.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 274.000 $13.200 $10.000 $15.400 $15.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 280.000 $5.300 $5.000 $7.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 280.000 $1.200 $1.500 $2.600 $9.000
DRIVEWAYS (BASE)
SY 1,212.000 $43.100 $53.500 $50.000 $55.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 17,574.000 $0.150 $0.100 $0.100 $0.500
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 9,161.000 $0.150 $0.120 $0.120 $0.500
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $239.600 $440.000 $300.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000 $619.200 $640.000 $550.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $816.500 $960.000 $1,000.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 3.000 $805.000 $730.000 $1,050.000 $1,500.000
REMOVE SM RD SN SUP&AM
EA 20.000 $82.800 $130.000 $100.000 $100.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 10.000 $26.900 $75.000 $10.500 $100.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 12.000 $85.000 $110.000 $80.000 $100.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 18,322.000 $0.450 $0.570 $0.650 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 800.000 $2.100 $1.000 $2.400 $6.000
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 17,574.000 $0.520 $0.970 $0.900 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 2,290.000 $0.610 $0.970 $1.500 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 2,677.000 $0.540 $0.970 $1.300 $1.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 41.000 $11.700 $22.100 $20.000 $20.000
REFL PAV MRKR TY II-A-A
EA 148.000 $5.300 $7.000 $7.250 $6.000
FULL - WIDTH MOWING
AC 16.000 $370.000 $200.000 $1,375.000 $3,500.000
LITTER REMOVAL
AC 16.000 $111.000 $400.000 $630.000 $1,500.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 8,771.000 $2.500 $7.750 $15.500 $10.000
D-GR HMA TY-B PG64-22
TON 1,361.000 $173.300 $150.100 $140.000 $150.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 33.000 $117.700 $663.000 $450.000 $165.000
TACK COAT
GAL 1,186.000 $6.700 $4.000 $6.250 $10.000
SP MIXES SP-C SAC-B PG76-22
TON 3,509.000 $180.000 $153.650 $165.000 $175.000
TACK COAT
GAL 3,190.000 $3.000 $4.000 $7.250 $10.000
THERMOPLASTIC PIPE (PP) (18")
LF 118.000 $80.000 $0.000 $0.000 $0.000
THERMOPLASTIC PIPE (PP) (24")
LF 96.000 $120.000 $0.000 $0.000 $0.000
TMA (STATIONARY)
DAY 97.000 $290.000 $100.000 $315.000 $250.000
TMA (MOBILE OPERATION)
DAY 30.000 $288.800 $100.000 $220.000 $550.000
SOLAR POWERED LED WARNING SIGN
EA 3.000 $500.000 $2,500.000 $2,550.000 $4,500.000
1
RC PIPE (CL III)(18 IN)(ALT)
LF 118.000 $80.000 $70.000 $130.000 $250.000
2
RC PIPE (CL III) (24 IN) (ALT)
LF 96.000 $120.000 $160.000 $150.000 $250.000
Totals: $1,621,559.800 $1,564,314.750 $1,671,039.660 $2,204,514.500