PREPARING ROW
|
STA
|
168.000
|
$500.000
|
$2,897.350
|
$1,800.000
|
$150.000
|
$900.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
376.000
|
$7.500
|
$10.480
|
$5.000
|
$33.000
|
$30.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,059.700
|
$8.000
|
$8.820
|
$4.500
|
$21.000
|
$30.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,495.000
|
$25.000
|
$10.320
|
$9.000
|
$13.500
|
$30.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
351.000
|
$7.500
|
$11.360
|
$4.000
|
$9.000
|
$40.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
5,190.000
|
$5.000
|
$5.830
|
$0.500
|
$8.150
|
$8.000
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
7,887.000
|
$6.000
|
$7.730
|
$0.500
|
$10.150
|
$11.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
15,034.000
|
$12.000
|
$7.500
|
$11.000
|
$17.700
|
$10.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
37.000
|
$25.000
|
$23.240
|
$13.500
|
$28.000
|
$52.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
6,129.000
|
$15.000
|
$11.140
|
$14.000
|
$17.500
|
$10.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
131,557.000
|
$1.000
|
$1.930
|
$0.400
|
$4.200
|
$1.800
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
65,778.500
|
$0.150
|
$0.220
|
$0.150
|
$0.130
|
$0.090
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
65,778.500
|
$0.590
|
$0.220
|
$0.150
|
$0.130
|
$0.090
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
131,557.000
|
$0.590
|
$0.320
|
$0.400
|
$0.270
|
$0.300
|
|
|
FERTILIZER
|
AC
|
27.180
|
$530.000
|
$466.940
|
$420.000
|
$254.000
|
$630.000
|
|
|
VEGETATIVE WATERING
|
MG
|
3,321.510
|
$43.130
|
$22.430
|
$6.000
|
$18.500
|
$25.200
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
31,757.000
|
$5.500
|
$2.040
|
$3.750
|
$6.750
|
$3.200
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
548.000
|
$182.000
|
$204.680
|
$210.000
|
$195.000
|
$177.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TYA)(GR1-2)(8")
|
SY
|
18,017.000
|
$23.000
|
$22.360
|
$32.000
|
$26.000
|
$33.000
|
|
|
CEM TRT(PLNT MX) (CLN)(TYA)(GR1-2)(10")
|
SY
|
17,408.000
|
$25.000
|
$17.930
|
$37.000
|
$32.500
|
$40.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
19,481.000
|
$4.000
|
$4.630
|
$3.250
|
$5.000
|
$5.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
1,766.000
|
$3.600
|
$3.960
|
$3.700
|
$6.250
|
$5.000
|
|
|
AGGR (TY-PD GR-4 OR TY-PL GR-4)(SAC-B)
|
CY
|
38.000
|
$155.000
|
$120.800
|
$315.000
|
$760.000
|
$200.000
|
|
|
D-GR HMA TY-C PG70-22
|
TON
|
1,988.000
|
$80.000
|
$111.710
|
$92.000
|
$92.000
|
$95.000
|
|
|
SUPERPAVE MIXTURES SP-D PG70-22
|
TON
|
6,403.000
|
$97.000
|
$115.350
|
$106.000
|
$90.000
|
$140.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
750.000
|
$50.000
|
$70.990
|
$81.000
|
$96.000
|
$31.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
45,768.000
|
$4.000
|
$1.810
|
$1.000
|
$1.900
|
$4.000
|
|
|
CEM STABIL BKFL
|
CY
|
166.000
|
$70.000
|
$97.020
|
$53.000
|
$126.000
|
$170.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
260.000
|
$95.000
|
$103.100
|
$38.000
|
$152.000
|
$50.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
388.000
|
$10.000
|
$5.430
|
$1.000
|
$12.500
|
$1.330
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
620.000
|
$125.000
|
$159.620
|
$700.000
|
$430.000
|
$500.000
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
8.400
|
$1,300.000
|
$1,074.740
|
$3,500.000
|
$3,050.000
|
$4,200.000
|
|
|
CL C CONC (CAP)(EXTEND)
|
CY
|
15.000
|
$3,000.000
|
$1,961.880
|
$3,500.000
|
$4,500.000
|
$3,700.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
20.400
|
$850.000
|
$996.380
|
$5,000.000
|
$1,412.000
|
$3,400.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
22.000
|
$1,400.000
|
$723.660
|
$1,350.000
|
$960.000
|
$1,400.000
|
|
|
REINF CONC SLAB (SLAB BEAM)(EXT SLAB)
|
SF
|
1,788.000
|
$30.000
|
$19.190
|
$135.000
|
$78.000
|
$55.000
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
424.670
|
$145.000
|
$190.760
|
$250.000
|
$200.000
|
$320.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
1,211.000
|
$10.000
|
$14.920
|
$6.000
|
$26.000
|
$27.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
10.000
|
$120.000
|
$290.220
|
$216.000
|
$199.000
|
$250.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
69.000
|
$375.000
|
$322.760
|
$720.000
|
$1,055.000
|
$600.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
556.000
|
$115.000
|
$119.940
|
$225.000
|
$112.000
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
21.000
|
$460.000
|
$383.520
|
$650.000
|
$1,100.000
|
$736.810
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
318.000
|
$13.000
|
$104.480
|
$21.000
|
$19.500
|
$160.000
|
|
|
RAIL (TY T223)
|
LF
|
449.000
|
$100.000
|
$134.860
|
$210.000
|
$135.000
|
$140.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
84.000
|
$190.000
|
$461.160
|
$225.000
|
$490.000
|
$600.020
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
41.000
|
$230.000
|
$558.980
|
$690.000
|
$550.000
|
$700.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
45.000
|
$250.000
|
$702.790
|
$750.000
|
$685.000
|
$800.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
13.500
|
$350.000
|
$1,146.800
|
$810.000
|
$825.000
|
$900.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
16.000
|
$400.000
|
$1,181.030
|
$800.000
|
$860.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
11.500
|
$55.000
|
$71.050
|
$65.000
|
$61.000
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,403.000
|
$65.000
|
$256.460
|
$77.000
|
$88.000
|
$130.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
252.000
|
$75.000
|
$105.640
|
$88.500
|
$107.000
|
$155.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 4)
|
LF
|
736.000
|
$180.000
|
$106.750
|
$168.000
|
$235.000
|
$420.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 5)
|
LF
|
151.000
|
$239.000
|
$212.380
|
$240.000
|
$325.000
|
$480.000
|
|
|
INLET (COMPL)(PSL)(RH)(4FTX4FT)
|
EA
|
3.000
|
$4,500.000
|
$4,550.630
|
$3,200.000
|
$3,525.000
|
$7,200.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)
|
EA
|
2.000
|
$5,000.000
|
$10,912.230
|
$3,100.000
|
$3,850.000
|
$15,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
4.000
|
$55.000
|
$8,184.170
|
$4,275.000
|
$5,100.000
|
$15,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
4.000
|
$5,600.000
|
$9,664.290
|
$6,000.000
|
$6,600.000
|
$15,200.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$5,800.000
|
$10,099.620
|
$6,800.000
|
$7,600.000
|
$17,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
1.000
|
$6,000.000
|
$10,099.620
|
$9,000.000
|
$9,100.000
|
$25,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$6,200.000
|
$13,466.160
|
$8,800.000
|
$8,600.000
|
$20,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$800.000
|
$1,302.500
|
$560.000
|
$710.000
|
$1,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$1,400.000
|
$1,302.500
|
$1,050.000
|
$760.000
|
$2,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
118.000
|
$1,200.000
|
$1,593.300
|
$1,275.000
|
$810.000
|
$3,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$2,000.000
|
$2,716.450
|
$2,550.000
|
$2,525.000
|
$4,000.000
|
|
|
SET (TY II) (DES 4) (RCP) (6: 1) (P)
|
EA
|
34.000
|
$2,200.000
|
$4,534.670
|
$2,600.000
|
$3,525.000
|
$5,000.000
|
|
|
SET (TY II) (DES 5) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$43,000.000
|
$7,052.320
|
$4,300.000
|
$4,525.000
|
$5,100.000
|
|
|
REMOV & RE - LAY PIPE (18 IN)
|
LF
|
16.000
|
$65.000
|
$37.170
|
$26.500
|
$36.000
|
$61.000
|
|
|
REMOV & RE - LAY PIPE (24 IN)
|
LF
|
134.000
|
$80.000
|
$49.820
|
$38.000
|
$46.000
|
$61.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
12.000
|
$1,100.000
|
$1,633.030
|
$39.000
|
$2,510.000
|
$2,000.000
|
|
|
REMOV STR (SET)
|
EA
|
76.000
|
$200.000
|
$498.060
|
$59.000
|
$455.000
|
$3,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$1,900.000
|
$1,115.070
|
$1,800.000
|
$855.000
|
$4,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
2,853.000
|
$18.000
|
$19.110
|
$4.000
|
$26.000
|
$35.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
190.000
|
$48.000
|
$35.440
|
$35.000
|
$128.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$259,322.050
|
$300,000.000
|
$395,000.000
|
$419,756.000
|
$881,699.640
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$2,500.000
|
$9,365.100
|
$2,500.000
|
$935.000
|
$7,750.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
531.000
|
$30.000
|
$31.990
|
$32.000
|
$32.000
|
$60.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
531.000
|
$9.000
|
$9.410
|
$11.000
|
$10.250
|
$24.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$20.000
|
$24.060
|
$25.000
|
$36.600
|
$44.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$10.000
|
$9.140
|
$5.000
|
$9.350
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,874.000
|
$5.500
|
$5.580
|
$6.000
|
$5.650
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,874.000
|
$1.400
|
$1.560
|
$4.000
|
$1.050
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
182.000
|
$56.000
|
$110.810
|
$65.000
|
$240.000
|
$140.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
510.000
|
$46.000
|
$28.400
|
$20.000
|
$76.000
|
$85.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
510.000
|
$25.000
|
$7.600
|
$5.000
|
$11.250
|
$15.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
510.000
|
$25.000
|
$10.120
|
$20.000
|
$18.500
|
$6.000
|
|
|
INTERSECTIONS (CONC)
|
SY
|
280.000
|
$135.000
|
$78.440
|
$181.000
|
$93.600
|
$130.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,295.000
|
$45.000
|
$31.520
|
$85.000
|
$90.500
|
$70.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,215.000
|
$75.000
|
$55.740
|
$82.000
|
$93.600
|
$96.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,580.000
|
$37.000
|
$25.030
|
$48.000
|
$70.000
|
$62.000
|
|
|
TURNOUTS (ACP)
|
SY
|
616.000
|
$50.000
|
$40.100
|
$71.000
|
$91.000
|
$70.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,760.000
|
$33.000
|
$49.110
|
$18.000
|
$10.500
|
$25.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
225.000
|
$20.000
|
$30.180
|
$33.000
|
$25.000
|
$40.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$1,750.000
|
$1,944.470
|
$2,150.000
|
$1,465.000
|
$2,300.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$950.000
|
$1,596.200
|
$1,525.000
|
$860.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
787.000
|
$4.500
|
$4.640
|
$6.000
|
$2.600
|
$10.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$300.000
|
$290.220
|
$500.000
|
$260.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$21,000.000
|
$9,081.990
|
$11,375.000
|
$9,152.000
|
$20,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$3,000.000
|
$1,741.310
|
$4,100.000
|
$1,456.000
|
$7,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$1,000.000
|
$1,160.880
|
$1,660.000
|
$936.000
|
$1,800.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
2.000
|
$15,000.000
|
$9,484.930
|
$24,000.000
|
$14,664.000
|
$20,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
39.000
|
$270.000
|
$290.220
|
$440.000
|
$218.400
|
$400.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
3.000
|
$360.000
|
$406.310
|
$680.000
|
$400.400
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
20.000
|
$420.000
|
$464.350
|
$515.000
|
$450.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
13.000
|
$600.000
|
$696.530
|
$600.000
|
$548.080
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$890.000
|
$754.570
|
$950.000
|
$813.280
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
59.000
|
$105.000
|
$87.070
|
$111.000
|
$76.000
|
$200.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
23.000
|
$80.000
|
$110.280
|
$53.000
|
$55.000
|
$60.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
6.000
|
$18.000
|
$11.610
|
$42.000
|
$10.200
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
25.000
|
$30.000
|
$11.610
|
$42.000
|
$27.750
|
$50.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
848.000
|
$0.600
|
$0.990
|
$0.950
|
$0.860
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
848.000
|
$0.700
|
$0.990
|
$0.950
|
$0.860
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
69,150.000
|
$0.600
|
$0.990
|
$0.850
|
$0.760
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
68,898.000
|
$0.600
|
$0.990
|
$0.850
|
$0.760
|
$0.550
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,631.000
|
$0.820
|
$1.160
|
$1.300
|
$1.220
|
$1.900
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
198.000
|
$6.000
|
$9.290
|
$6.600
|
$6.100
|
$10.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
47.000
|
$100.000
|
$139.310
|
$170.000
|
$152.000
|
$100.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
9.000
|
$120.000
|
$174.130
|
$220.000
|
$205.000
|
$250.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
|
LF
|
233.000
|
$5.600
|
$9.290
|
$6.600
|
$6.100
|
$8.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(090MIL)
|
EA
|
5.000
|
$285.000
|
$116.090
|
$275.000
|
$255.000
|
$165.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
33,345.000
|
$0.150
|
$0.230
|
$0.300
|
$0.260
|
$0.200
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
1,631.000
|
$0.500
|
$0.460
|
$0.750
|
$0.660
|
$0.210
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
198.000
|
$2.800
|
$2.320
|
$4.450
|
$4.100
|
$2.250
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
51.000
|
$65.000
|
$40.630
|
$110.000
|
$102.000
|
$65.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
9.000
|
$65.000
|
$46.440
|
$165.000
|
$152.000
|
$70.000
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
7,252.000
|
$0.350
|
$0.170
|
$0.400
|
$0.360
|
$0.200
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
34,260.000
|
$0.150
|
$0.170
|
$0.300
|
$0.260
|
$0.200
|
|
REFL PAV MRK TY II (Y) 24" (SLD)
|
LF
|
233.000
|
$3.400
|
$1.160
|
$6.600
|
$6.100
|
$2.250
|
|
REFL PAV MRK TY II (Y) (MED NOSE)
|
EA
|
3.000
|
$132.000
|
$58.040
|
$165.000
|
$152.000
|
$27.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
33,345.000
|
$0.200
|
$0.410
|
$0.450
|
$0.420
|
$0.320
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
7,252.000
|
$0.400
|
$0.410
|
$0.520
|
$0.460
|
$0.320
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
34,260.000
|
$0.200
|
$0.410
|
$0.450
|
$0.420
|
$0.320
|
|
REFL PAV MRKR TY I-C
|
EA
|
84.000
|
$5.000
|
$5.800
|
$9.000
|
$8.100
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
996.000
|
$0.350
|
$4.640
|
$4.500
|
$4.050
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
57,564.230
|
$0.400
|
$0.410
|
$0.300
|
$0.660
|
$0.350
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
1.000
|
$72.000
|
$40.630
|
$140.000
|
$126.000
|
$55.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
1.000
|
$74.000
|
$46.440
|
$166.000
|
$152.000
|
$110.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
30.000
|
$65.000
|
$116.640
|
$99.000
|
$90.000
|
$800.000
|
|
|
CNC CRACK REPAIR (FLOOD)(GRAVITY)
|
SF
|
8,491.000
|
$10.000
|
$8.710
|
$6.380
|
$5.650
|
$15.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
|
LF
|
6.000
|
$100.000
|
$174.970
|
$166.000
|
$152.000
|
$500.000
|
|
Totals: |
$5,929,869.408
|
$6,778,425.949
|
$6,863,431.149
|
$7,170,938.757
|
$9,417,862.132
|