CHAMBERS FM 565 (1024-01-076)

Items: 50

County: CHAMBERS
Length: N/A
Highway: FM 565
District: BEAUMONT
Control Number: 1024-01-076
DBE Goal: N/A
Project: STP 2019(761)HES
Guaranty: N/A
Time: 77 WORKING DAYS
Engineer's Estimate: $951,302.44
Date: 04/03/2019 (7 years ago)
Contract Number: N/A
Type: GR, BS, ACP, RUMBLE STRIPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$951,302.44
$1,057,947.00
Over/Under Est: 11.21% $106,644.56
Over/Under Est: 16.48% $156,736.21
Amt Left: 4.73% $50,091.65
$1,452,423.40
Over/Under Est: 52.68% $501,120.96
Amt Left: 37.29% $394,476.40
Delta: -31.08% -$344,384.75

Bid Items & Bid Tabulations

50 Total 0 of 50
CHAMBERS  |  FM 565  |  BEAUMONT  |  1024-01-076  |  04/03/2019  |  $951,302.44  |  STP 2019(761)HES  |  GR, BS, ACP, RUMBLE STRIPS  |  77 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
TEXAS MATERIALS GROUP, INC.
COPASA INC
SUBGRADE WIDENING (ORD COMP)
STA 80.140 $366.410 $850.000 $590.000 $517.750
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 18.000 $15.880 $25.000 $210.000 $14.980
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 13,417.000 $0.260 $0.400 $0.250 $0.640
VEGETATIVE WATERING
MG 0.120 $20.080 $15.000 $4,000.000 $30.930
FL BS (RDWY DEL) (TY D GR 1-2)
TON 54.000 $40.000 $80.000 $130.000 $46.190
ASPHALT STAB BASE (GR 4)(PG 64)
TON 3,085.000 $70.000 $90.000 $81.000 $121.290
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 218.000 $160.670 $275.000 $270.000 $430.470
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 10,184.000 $2.860 $3.500 $4.000 $6.280
D-GR HMA(SQ) TY-D PG76-22
TON 3,126.000 $100.770 $96.000 $100.000 $134.840
PLANE ASPH CONC PAV(1" TO 2")
SY 489.000 $1.940 $7.000 $20.000 $26.580
RIPRAP (MOW STRIP)(4 IN)
CY 32.000 $445.110 $850.000 $650.000 $350.960
MOBILIZATION
LS 1.000 $70,000.000 $30,000.000 $85,030.000 $131,531.190
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,600.000 $1,000.000 $1,000.000 $6,536.710
TEMP SEDMT CONT FENCE (INSTALL)
LF 660.000 $2.370 $3.250 $3.000 $4.790
TEMP SEDMT CONT FENCE (REMOVE)
LF 660.000 $0.490 $2.000 $1.030 $1.140
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 540.000 $5.460 $12.000 $5.600 $6.400
BIODEG EROSN CONT LOGS (REMOVE)
LF 540.000 $1.000 $3.000 $1.020 $2.680
DRIVEWAYS (CONC)
SY 606.000 $47.540 $91.000 $80.000 $53.500
DRIVEWAYS (ACP)
SY 569.000 $33.870 $54.000 $107.000 $29.140
TURNOUTS (SURF TREAT)
SY 52.000 $2.370 $94.000 $57.000 $99.820
RUMBLE STRIPS (SHOULDER)
LF 9,098.000 $0.190 $0.450 $0.260 $0.640
RUMBLE STRIPS (CENTERLINE)
LF 4,516.000 $0.190 $0.450 $0.280 $1.330
MTL W-BEAM GD FEN (TIM POST)
LF 487.500 $20.930 $29.000 $20.600 $34.550
REMOVE METAL BEAM GUARD FENCE
LF 553.000 $2.830 $6.000 $4.050 $6.650
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $429.930 $550.000 $252.000 $664.300
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,445.710 $3,100.000 $2,410.000 $4,558.760
CRASH CUSH ATTEN (INSTL)
EA 2.000 $21,952.000 $30,000.000 $22,100.000 $28,498.430
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 4.000 $236.370 $250.000 $230.000 $386.960
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 18.000 $387.980 $480.000 $400.000 $564.660
REMOVE SM RD SN SUP&AM
EA 1.000 $75.000 $115.000 $200.000 $132.860
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 35,258.000 $0.300 $0.250 $0.260 $0.280
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,870.000 $1.830 $0.550 $1.250 $1.150
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 297.000 $0.670 $1.000 $1.040 $1.680
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 107.000 $2.000 $10.000 $10.100 $4.730
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 39.000 $4.980 $20.000 $20.100 $12.680
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 6.000 $76.190 $100.000 $102.000 $257.700
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 2.000 $101.350 $100.000 $102.000 $361.170
PAVEMENT SEALER 4"
LF 3,619.000 $0.040 $0.100 $0.110 $0.190
PAVEMENT SEALER 8"
LF 297.000 $0.100 $0.200 $0.210 $0.750
PAVEMENT SEALER 12"
LF 107.000 $0.200 $0.500 $0.510 $2.210
PAVEMENT SEALER 24"
LF 39.000 $0.500 $1.000 $1.040 $4.440
PAVEMENT SEALER (ARROW)
EA 6.000 $8.000 $25.000 $25.500 $74.030
PAVEMENT SEALER (WORD)
EA 2.000 $12.000 $25.000 $25.500 $104.110
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 17,629.000 $0.310 $0.400 $0.420 $0.360
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 1,480.000 $0.290 $0.400 $0.420 $0.670
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 9,803.000 $0.320 $0.400 $0.420 $0.360
REFL PAV MRKR TY I-C
EA 16.000 $3.500 $6.000 $6.100 $8.030
REFL PAV MRKR TY II-A-A
EA 268.000 $4.240 $5.000 $5.100 $5.290
TMA (STATIONARY)
EA 1.000 $1,500.000 $3,000.000 $23,500.000 $21,044.440
TMA (MOBILE OPERATION)
HR 616.000 $98.000 $10.000 $28.000 $38.820
Totals: $951,302.442 $1,057,947.000 $1,108,038.650 $1,452,423.412