CHAMBERS FM 565 (1024-01-074)

Items: 65

County: CHAMBERS
Length: N/A
Highway: FM 565
District: BEAUMONT
Control Number: 1024-01-074
DBE Goal: N/A
Project: STP 2018(757)HES
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $1,914,138.85
Date: 05/01/2018 (8 years ago)
Contract Number: N/A
Type: WIDEN PAVED SURFACE WIDTH, INSTALL CONTINUOUS TURN
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,914,138.85
$1,709,304.36
Over/Under Est: -10.7% -$204,834.49
Over/Under Est: 0.75% $14,379.28
Amt Left: 12.82% $219,213.77

Bid Items & Bid Tabulations

65 Total 0 of 65
CHAMBERS  |  FM 565  |  BEAUMONT  |  1024-01-074  |  05/01/2018  |  $1,914,138.85  |  STP 2018(757)HES  |  WIDEN PAVED SURF WIDTH, INSTL CONTIN...  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
OLDCASTLE MATERIALS TEXAS, INC.
ANGEL BROTHERS HOLDINGS CORP.
EXCAVATION (ROADWAY)
CY 5,363.000 $15.000 $14.250 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 1,612.000 $26.000 $8.400 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,780.000 $23.000 $10.750 $16.000
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 35,876.000 $0.300 $0.290 $0.340
CELL FBR MLCH SEED(TEMP)(WARM)
SY 17,938.000 $0.330 $0.270 $0.450
CELL FBR MLCH SEED(TEMP)(COOL)
SY 17,938.000 $0.330 $0.270 $0.450
VEGETATIVE WATERING
MG 304.000 $26.000 $9.400 $15.000
FL BS(RDWY DEL)(TY D GR 1-2)(FNAL POS)
CY 3,816.000 $74.000 $74.000 $95.000
CEMENT
TON 605.000 $200.000 $195.000 $220.000
CEMENT TRT (MX EXST MTL & NW BS)(10")
SY 30,186.000 $3.000 $1.900 $3.800
PRIME COAT (AE-P)
GAL 6,041.000 $3.370 $3.100 $3.250
ASPH (AC-20-5TR)
GAL 10,871.000 $3.500 $2.600 $3.250
AGGR(TY-PD GR-4 OR TY-PL GR-4)
CY 235.000 $200.000 $190.000 $185.000
SUPERPAVE MIXTURES SP-C PG64-22
TON 3,324.000 $90.000 $76.000 $94.000
CEM STABIL BKFL
CY 11.000 $125.000 $90.000 $58.000
CUT AND RESTORE PAV (FLEX BASE)
SY 204.000 $40.000 $38.000 $11.000
RIPRAP (CONC)(4 IN)
CY 65.000 $300.000 $460.000 $625.000
CONC BOX CULV (4 FT X 2 FT)
LF 885.000 $180.000 $205.000 $195.000
CONC BOX CULV (4 FT X 3 FT)
LF 242.000 $180.000 $230.000 $235.000
RC PIPE (CL III)(18 IN)
LF 637.000 $50.000 $54.000 $63.000
RC PIPE (CL III)(24 IN)
LF 413.000 $65.000 $63.000 $72.000
RC PIPE (CL III)(30 IN)
LF 43.000 $116.000 $112.000 $86.000
RC PIPE (CL III)(48 IN)
LF 24.000 $300.000 $255.000 $156.000
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
EA 8.000 $5,000.000 $2,950.000 $2,500.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $12,000.000 $10,200.000 $20,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
EA 1.000 $7,500.000 $6,400.000 $3,950.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (P)
EA 1.000 $8,000.000 $7,800.000 $2,600.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 40.000 $800.000 $760.000 $660.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 46.000 $1,000.000 $1,040.000 $1,025.000
SET (TY II) (48 IN) (RCP) (3: 1) (C)
EA 2.000 $3,000.000 $4,020.000 $3,000.000
REMOV STR (PIPE)
LF 1,298.000 $20.000 $12.300 $10.000
MOBILIZATION
LS 1.000 $100,000.000 $71,000.000 $45,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $1,500.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 211.000 $27.000 $30.000 $29.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 20.000 $60.000 $49.000 $55.000
ROCK FILTER DAMS (REMOVE)
LF 231.000 $9.600 $8.200 $8.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 200.000 $5.000 $5.100 $19.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $1.300 $1.000 $5.000
DRIVEWAYS (CONC)
SY 126.000 $110.000 $170.000 $136.000
DRIVEWAYS (ACP)
SY 444.000 $45.000 $63.000 $39.000
DRIVEWAYS (BASE)
SY 682.000 $30.000 $18.000 $23.000
MTL W-BEAM GD FEN (TIM POST)
LF 850.000 $20.000 $19.250 $20.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,665.000 $1,750.000 $2,110.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $30.000 $100.000 $1,110.000
REMOVE METAL BEAM GUARD FENCE
LF 389.000 $3.600 $2.500 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,150.000 $2,100.000 $2,560.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $350.000 $280.000 $335.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 19.000 $240.000 $415.000 $170.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 5.000 $220.000 $300.000 $235.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $485.000 $540.000 $190.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 13.000 $365.000 $360.000 $400.000
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 90.000 $110.000 $68.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 21.000 $15.200 $27.500 $50.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 80.000 $1.660 $1.600 $1.400
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,533.000 $1.500 $1.600 $1.400
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 800.000 $0.650 $0.700 $1.400
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 12,277.000 $0.310 $0.350 $0.470
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,920.000 $0.310 $0.350 $0.470
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 13,140.000 $0.310 $0.350 $0.470
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 82.000 $11.200 $15.400 $19.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $149.000 $205.000 $260.000
REFL PAV MRKR TY I-C
EA 40.000 $3.050 $4.100 $5.000
REFL PAV MRKR TY II-A-A
EA 77.000 $3.050 $4.100 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 728.000 $0.360 $0.650 $0.400
TMA (STATIONARY)
DAY 180.000 $180.000 $125.000 $87.000
Totals: $1,914,138.850 $1,709,304.360 $1,928,518.130