Show Job Controls
Bid Cobra

CHAMBERS FM 562 (1022-01-034)

Items: 73

County: CHAMBERS
Length: N/A
Highway: FM 562
District: BEAUMONT
Control Number: 1022-01-034
DBE Goal: N/A
Project: BR 2021(469)
Guaranty: N/A
Time: 153 WORKING DAYS
Engineer's Estimate: $1,582,874.15
Date: 10/07/2021 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$1,582,874.15
$1,598,096.25
Over/Under Est: 0.96% $15,222.10
Over/Under Est: 48.22% $763,279.80
Amt Left: 46.81% $748,057.70
$2,641,170.60
Over/Under Est: 66.86% $1,058,296.45
Amt Left: 65.27% $1,043,074.35
Delta: -12.57% -$295,016.65
Subcontractor Percentage Amount
TOM-MAC, INC. 4.24% $198,264.78
GMJ PAVING CO. 3.77% $176,287.31
AREA WIDE PROTECTIVE, INC. 1.59% $74,349.29
INTERSTATE BARRICADES & MARKINGS, INC. 0.61% $28,523.94
URETEK USA, INC. 0.38% $17,769.01
HOUSTON SAWING & DRILLING 0.13% $6,078.87
WEST TEXAS RUMBLE STRIP LLC 0.09% $4,208.45
Total: 10.81% $505,481.65

Bid Items & Bid Tabulations

73 Total 0 of 73
CHAMBERS  |  FM 562  |  BEAUMONT  |  1022-01-034  |  10/07/2021  |  $1,582,874.15  |  BR 2021(469)  |  BRIDGE REPL  |  153 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
RAGLE CONSTRUCTION, INC.
EARTH BUILDERS, L.P.
PREPARING ROW
STA 2.000 $5,000.000 $2,500.000 $75,000.000 $30,000.000
EXCAVATION (ROADWAY)
CY 481.000 $19.600 $7.000 $70.000 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 634.000 $16.000 $35.000 $30.000 $55.000
BROADCAST SEED (TEMP) (WARM)
SY 819.000 $0.200 $1.300 $1.250 $2.500
BROADCAST SEED (TEMP) (COOL)
SY 819.000 $0.200 $1.300 $1.250 $2.500
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 1,637.000 $3.000 $1.700 $1.550 $3.000
VEGETATIVE WATERING
MG 33.000 $20.000 $13.500 $74.420 $250.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 328.000 $3.000 $6.500 $5.750 $10.000
PROOF ROLLING
HR 40.000 $100.000 $84.000 $60.000 $125.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 51.000 $180.000 $190.000 $180.000 $300.000
LIME TRT (SUBGRADE)(6")
SY 3,112.000 $1.800 $5.500 $8.000 $22.000
D-GR HMA(SQ) TY-B PG64-22
TON 1,370.000 $105.000 $100.000 $100.000 $200.000
D-GR HMA(SQ) TY-D SAC-A PG70-22
TON 257.000 $107.000 $150.000 $150.000 $250.000
TACK COAT
GAL 374.000 $8.000 $2.600 $2.500 $15.000
CEM STABIL BKFL
CY 92.000 $90.000 $35.000 $110.000 $250.000
TEMPORARY SPL SHORING
SF 687.000 $28.000 $8.000 $30.000 $45.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 2,245.000 $20.000 $2.000 $60.000 $75.000
PRESTR CONC PIL (18 IN SQ)
LF 1,873.000 $145.000 $115.000 $147.000 $150.000
CL B CONC (FLUME)
CY 2.200 $500.000 $1,200.000 $1,000.000 $1,600.000
CL C CONC (ABUT)
CY 45.500 $1,300.000 $700.000 $1,400.000 $2,600.000
REINF CONC SLAB (BOX BEAM)
SF 2,569.000 $12.000 $11.000 $30.000 $35.000
APPROACH SLAB
CY 51.600 $350.000 $730.000 $650.000 $900.000
SHEAR KEY
CY 13.300 $250.000 $590.000 $250.000 $650.000
RETAINING WALL (SPREAD FOOTING)
SF 1,260.000 $77.000 $88.000 $110.000 $190.000
PRESTR CONC BOX BEAM (4B20)
LF 447.000 $200.000 $165.000 $210.000 $330.000
PRESTR CONC BOX BEAM (5B20)
LF 149.000 $210.000 $165.000 $250.000 $330.000
RIPRAP (CONC)(4 IN)
CY 1.000 $600.000 $5,000.000 $1,500.000 $800.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 227.000 $170.000 $195.000 $180.000 $150.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 190.000 $140.000 $405.000 $180.000 $150.000
RIPRAP (MOW STRIP)(4 IN)
CY 38.000 $520.000 $842.000 $500.000 $650.000
RAIL (TY T223)
LF 182.000 $150.000 $190.000 $150.000 $180.000
ARMOR JOINT (SEALED)
LF 61.000 $120.000 $170.000 $130.000 $150.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $36,000.000 $30,000.000 $198,000.000 $65,000.000
MOBILIZATION
LS 1.000 $148,000.000 $159,000.000 $230,000.000 $275,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $5,000.000 $8,250.000 $19,000.000 $2,000.000
CONSTRUCTION PERIMETER FENCE
LF 993.000 $5.000 $1.000 $5.000 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,480.000 $3.000 $3.000 $2.750 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,480.000 $1.000 $0.850 $0.750 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 11.000 $3,000.000 $1,850.000 $4,000.000 $5,500.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 600.000 $10.500 $150.000 $30.000 $90.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 600.000 $4.500 $5.000 $5.000 $20.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 600.000 $5.400 $16.000 $15.000 $25.000
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 815.000 $0.200 $3.100 $1.000 $10.000
MTL W-BEAM GD FEN (TIM POST)
LF 525.000 $23.000 $33.000 $30.000 $32.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,050.000 $1,825.000 $1,950.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $4.000 $6.000 $1.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,700.000 $2,750.000 $3,500.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $350.000 $305.000 $225.000 $350.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,950.000 $674.000 $1,000.000 $3,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $900.000 $674.000 $600.000 $3,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,000.000 $20,000.000 $9,150.000 $14,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $500.000 $360.000 $550.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $790.000 $360.000 $650.000 $900.000
REMOVE SM RD SN SUP&AM
EA 4.000 $110.000 $310.000 $65.000 $150.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $17.000 $16.500 $25.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 14.000 $29.000 $16.500 $45.000 $35.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 994.000 $0.350 $0.550 $0.500 $3.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,829.000 $1.050 $1.550 $1.500 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $8.050 $10.500 $10.000 $25.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 9,600.000 $1.000 $1.550 $1.500 $1.300
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 78.000 $1.400 $8.500 $1.000 $4.000
PAVEMENT SEALER 4"
LF 260.000 $0.300 $0.250 $0.200 $1.300
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 2,380.000 $0.350 $0.550 $0.500 $1.300
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 1,240.000 $0.350 $0.550 $0.500 $1.400
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 5,754.000 $0.300 $0.550 $0.500 $1.300
REFL PAV MRKR TY II-A-A
EA 138.000 $3.500 $5.150 $5.000 $10.000
ELIM EXT PAV MRK & MRKS (4")
LF 6,958.000 $0.500 $0.550 $0.500 $0.700
PAV SURF PREP FOR MRK (4")
LF 9,374.000 $0.100 $0.050 $0.010 $0.700
FLOATING TURBIDITY BARRIER(FUR & INST)
LF 2,017.000 $49.000 $3.400 $20.000 $10.000
FLOATING TURBIDITY BARRIER (REMOVE)
LF 2,017.000 $14.000 $0.300 $10.000 $1.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $6,000.000 $3,000.000 $21,000.000
TMA (STATIONARY)
DAY 32.000 $1,000.000 $1,500.000 $500.000 $350.000
TMA (MOBILE OPERATION)
DAY 2.000 $400.000 $4,000.000 $1,000.000 $450.000
Totals: $1,582,874.150 $1,598,096.250 $2,346,153.950 $2,641,170.600