Show Job Controls
Bid Cobra

CHAMBERS SH 146 (0389-02-048)

Items: 26

County: CHAMBERS
Length: N/A
Highway: SH 146
District: BEAUMONT
Control Number: 0389-02-048
DBE Goal: N/A
Project: BR 2021(529)
Guaranty: N/A
Time: 75 WORKING DAYS
Engineer's Estimate: $255,813.00
Date: 05/06/2021 (5 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$255,813.00
$230,324.00
Over/Under Est: -9.96% -$25,489.00
Over/Under Est: 13.09% $33,483.00
Amt Left: 25.6% $58,972.00
Over/Under Est: 15.08% $38,583.00
Amt Left: 27.82% $64,072.00
Delta: -1.76% -$5,100.00

Bid Items & Bid Tabulations

26 Total 0 of 26
CHAMBERS  |  SH 146  |  BEAUMONT  |  0389-02-048  |  05/06/2021  |  $255,813.00  |  BR 2021(529)  |  BRIDGE MAINT  |  75 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TALBRAN ENTERPRISES LLC
SJ&J CONSTRUCTION, LLC
ISI CONTRACTING, INC.
REMOVING CONCRETE(MOW STRIP)
LF 740.000 $8.000 $17.000 $5.000 $10.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 240.000 $1.000 $1.000 $2.000 $4.200
VEGETATIVE WATERING
MG 3.000 $15.000 $1.000 $20.000 $50.000
CL C CONC (RAC-R)
CY 10.000 $2,000.000 $3,300.000 $3,000.000 $1,200.000
RIPRAP (MOW STRIP)(4 IN)
CY 80.000 $550.000 $575.000 $700.000 $740.000
RAIL (TY T223)
LF 114.000 $180.000 $282.000 $210.000 $225.000
MOBILIZATION
LS 1.000 $25,000.000 $4,000.000 $30,000.000 $29,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $4,000.000 $1.000 $5,000.000 $8,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 500.000 $30.000 $1.000 $24.000 $25.000
ROCK FILTER DAMS (REMOVE)
LF 500.000 $9.500 $1.000 $12.000 $9.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 500.000 $6.000 $1.000 $4.500 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000 $2.000 $1.000 $2.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 800.000 $22.000 $34.000 $31.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,800.000 $3,650.000 $1,750.000 $2,300.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,100.000 $2,900.000 $1,100.000 $1,400.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $24.000 $50.000 $50.000 $28.000
REMOVE METAL BEAM GUARD FENCE
LF 600.000 $3.500 $3.000 $3.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $225.000 $460.000 $175.000 $150.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $200.000 $460.000 $250.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,700.000 $4,600.000 $2,800.000 $3,400.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 8.000 $56.000 $60.000 $90.000 $20.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 4.000 $60.000 $60.000 $40.000 $52.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 8.000 $50.000 $60.000 $150.000 $65.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 150.000 $50.000 $1.000 $100.000 $130.000
TMA (STATIONARY)
DAY 150.000 $200.000 $1.000 $100.000 $50.000
TMA (MOBILE OPERATION)
DAY 8.000 $200.000 $1.000 $67.000 $50.000
Totals: $255,813.000 $230,324.000 $289,296.000 $294,396.000