Show Job Controls
Bid Cobra

CHAMBERS SH 124 (0368-01-093)

Items: 49

County: CHAMBERS
Length: N/A
Highway: SH 124
District: BEAUMONT
Control Number: 0368-01-093
DBE Goal: 0.0%
Project: C 368-1-93
Guaranty: N/A
Time: 77 WORKING DAYS
Engineer's Estimate: $6,871,247.96
Date: 12/05/2023 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
ROBERTO M RODRIGUEZ
NYEMB NYEMB
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$6,871,247.96
$4,794,059.28
Over/Under Est: -30.23% -$2,077,188.68
Over/Under Est: -26.3% -$1,807,344.94
Amt Left: 5.63% $269,843.74
Subcontractor Percentage Amount
CPAVE, INC. 15.27% $732,052.85
WILLOW CITY SIGN & RAIL, INC. 2.20% $105,469.30
BATTERSON, LLP 1.44% $69,034.45
STRIPE LINES, INC. 0.16% $7,670.49
Total: 19.07% $914,227.09

Bid Items & Bid Tabulations

49 Total 0 of 49
CHAMBERS  |  SH 124  |  BEAUMONT  |  0368-01-093  |  12/05/2023  |  $6,871,247.96  |  C 368-1-93  |  SURF/ROADWAY RESTOR  |  77 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
BACKFILL (TY A OR B)
STA 188.100 $290.000 $342.000 $282.370
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 10,606.000 $0.410 $0.410 $0.530
CELL FBR MLCH SEED(TEMP)(WARM)
SY 10,606.000 $0.430 $0.410 $0.420
VEGETATIVE WATERING
MG 89.200 $32.500 $59.000 $462.670
ASPH (RC-250)
GAL 32,528.000 $5.600 $4.450 $5.080
AGGR(TY-L GR-5 SAC-B)
CY 695.000 $235.000 $263.000 $357.370
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 607.000 $135.000 $114.000 $189.110
PLANE ASPH CONC PAV(2" TO 4")
SY 1,375.000 $7.500 $16.650 $15.970
PLANE CONC PAV(0" TO 2")
SY 2,701.000 $10.000 $12.850 $19.050
FULL - DEPTH REPAIR CPCD (10")
SY 16.000 $500.000 $702.000 $666.150
FULL - DEPTH REPAIR CPJR (10")
SY 104.000 $505.000 $702.000 $666.190
CLEANING AND SEALING EXISTING JOINTS
LF 125,585.000 $10.000 $2.450 $2.340
MOBILIZATION
LS 1.000 $860,000.000 $230,000.000 $118,975.690
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $7,000.000 $667.000 $39,744.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 60.000 $590.000 $515.500 $489.180
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 58.000 $865.000 $643.000 $610.160
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 8.000 $1,020.000 $809.500 $767.960
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 23.000 $1,085.000 $826.000 $783.740
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,210.000 $892.500 $846.860
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,700.000 $1,247.500 $1,183.490
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 3.000 $1,500.000 $1,136.500 $1,078.300
REMOVE SM RD SN SUP&AM
EA 155.000 $150.000 $111.000 $105.200
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 4,570.000 $0.550 $0.330 $0.580
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 16,676.000 $0.500 $0.330 $0.530
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 6,120.000 $1.750 $0.670 $0.840
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 17,082.000 $0.600 $0.330 $0.530
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 633.000 $1.500 $0.830 $3.330
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 514.000 $2.400 $0.830 $3.980
REFL PAV MRK TY II (W) 8" (SLD)
LF 6,120.000 $1.200 $0.720 $1.100
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 4,570.000 $0.900 $0.670 $0.850
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 16,676.000 $0.900 $0.670 $0.840
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 17,082.000 $0.900 $0.670 $0.840
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 636.000 $20.600 $15.000 $18.940
PREFAB PAV MRK TY C (W) (ARROW)
EA 52.000 $280.000 $277.500 $263.000
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $300.000 $332.650 $341.900
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 12.000 $45.000 $55.500 $67.330
REFL PAV MRKR TY II-C-R
EA 334.000 $6.000 $6.650 $7.890
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 500.000 $275.000 $274.000 $259.840
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 500.000 $275.000 $137.500 $130.450
SPOT MOWING
AC 64.000 $150.000 $139.000 $151.850
LITTER REMOVAL
AC 64.000 $125.000 $111.000 $345.050
DOWEL BAR RETROFIT
EA 1,080.000 $120.000 $197.000 $186.940
TACK COAT
GAL 3,826.000 $8.520 $3.250 $11.040
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 7,014.000 $224.000 $179.000 $157.960
SP MIXES SP-C SAC-A PG76-22
TON 10,391.000 $170.000 $160.500 $164.050
TACK COAT
GAL 5,422.000 $4.750 $3.250 $8.830
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $14,225.000 $5,259.980
TMA (STATIONARY)
DAY 73.000 $340.000 $293.000 $934.730
TMA (MOBILE OPERATION)
DAY 4.000 $300.000 $632.000 $841.600
Totals: $6,871,247.960 $4,794,059.280 $5,063,903.031