PREPARING ROW
|
STA
|
3.000
|
$5,000.000
|
$14,000.000
|
$12,500.000
|
$4,000.000
|
$2,000.000
|
$7,044.740
|
$1,000.000
|
|
|
PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
5.000
|
$1,000.000
|
$1,500.000
|
$1,200.000
|
$1,200.000
|
$1,600.000
|
$1,482.650
|
$3,500.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
1,487.000
|
$8.000
|
$7.250
|
$15.000
|
$15.000
|
$15.000
|
$17.240
|
$77.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
3,333.500
|
$8.000
|
$13.700
|
$15.000
|
$17.000
|
$22.500
|
$18.390
|
$43.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
2,806.000
|
$10.000
|
$6.800
|
$3.000
|
$3.000
|
$8.150
|
$9.200
|
$39.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
64.000
|
$50.000
|
$69.000
|
$35.000
|
$17.000
|
$45.500
|
$145.970
|
$148.000
|
|
|
REMOVE CONC (GUTTER)
|
LF
|
4,178.500
|
$10.000
|
$7.000
|
$3.000
|
$2.000
|
$13.500
|
$8.310
|
$36.000
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
477.500
|
$25.000
|
$11.000
|
$15.000
|
$32.000
|
$22.500
|
$26.440
|
$72.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
746.600
|
$20.000
|
$17.350
|
$15.000
|
$24.000
|
$22.500
|
$35.150
|
$50.000
|
|
|
BACKFILL (TY B)
|
STA
|
30.000
|
$1,000.000
|
$235.000
|
$415.000
|
$770.000
|
$330.000
|
$306.520
|
$300.000
|
|
|
BLOCK SODDING
|
SY
|
145.000
|
$2.000
|
$8.450
|
$15.000
|
$25.000
|
$15.500
|
$15.770
|
$30.000
|
|
|
DRILL SEEDING (PERM) (URBAN) (SANDY)
|
SY
|
5,717.000
|
$0.200
|
$0.200
|
$1.000
|
$0.600
|
$5.150
|
$0.610
|
$0.450
|
|
|
VEGETATIVE WATERING
|
MG
|
200.000
|
$15.000
|
$38.000
|
$30.000
|
$75.000
|
$29.500
|
$110.890
|
$65.000
|
|
|
SPRINKLING (HOT PAVMT)
|
MG
|
1,000.000
|
$10.000
|
$22.000
|
$20.000
|
$75.000
|
$29.500
|
$44.350
|
$5.000
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$200.000
|
$170.000
|
$55.000
|
$225.000
|
$170.000
|
$151.170
|
$350.000
|
|
|
CEMENT
|
TON
|
977.000
|
$150.000
|
$129.000
|
$151.000
|
$145.000
|
$175.000
|
$154.760
|
$130.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
115,530.000
|
$3.000
|
$2.450
|
$3.000
|
$7.000
|
$3.050
|
$2.650
|
$5.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
23,107.000
|
$4.000
|
$3.600
|
$5.000
|
$3.740
|
$4.150
|
$4.660
|
$3.570
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
600.000
|
$3.000
|
$5.000
|
$6.000
|
$4.800
|
$4.850
|
$18.010
|
$7.880
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
61,842.000
|
$3.500
|
$4.000
|
$5.000
|
$3.500
|
$3.950
|
$4.100
|
$3.700
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
1,251.000
|
$150.000
|
$130.000
|
$130.000
|
$165.000
|
$170.000
|
$320.720
|
$220.000
|
|
|
D-GR HMA TY-B PG70-28
|
TON
|
42,024.000
|
$90.000
|
$94.950
|
$105.000
|
$95.000
|
$97.000
|
$128.160
|
$105.120
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
|
TON
|
13,632.000
|
$115.000
|
$119.200
|
$115.000
|
$130.000
|
$135.000
|
$158.620
|
$112.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
11,000.000
|
$30.000
|
$25.000
|
$43.000
|
$75.000
|
$55.000
|
$43.690
|
$69.000
|
|
|
PLANE ASPH CONC PAV (8")
|
SY
|
115,530.000
|
$6.000
|
$5.000
|
$4.000
|
$5.000
|
$5.000
|
$2.460
|
$4.550
|
|
|
PLANE ASPH CONC PAV (14")
|
SY
|
6,656.000
|
$15.000
|
$7.800
|
$6.000
|
$10.000
|
$9.500
|
$15.010
|
$16.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
9,403.000
|
$80.000
|
$97.000
|
$90.000
|
$100.000
|
$135.000
|
$145.930
|
$150.000
|
|
|
CONC PVMT (CRCP)(JCT TERMINAL)(8")
|
SY
|
596.000
|
$100.000
|
$94.400
|
$85.000
|
$125.000
|
$255.000
|
$253.120
|
$175.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,179.000
|
$150.000
|
$105.400
|
$185.000
|
$150.000
|
$175.000
|
$143.680
|
$350.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
255.000
|
$5.000
|
$6.350
|
$20.000
|
$20.000
|
$17.500
|
$114.940
|
$200.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
30.000
|
$400.000
|
$790.000
|
$325.000
|
$325.000
|
$380.000
|
$172.410
|
$1,000.000
|
|
|
CL C CONC (MISC)
|
CY
|
118.000
|
$400.000
|
$895.000
|
$875.000
|
$1,000.000
|
$815.000
|
$928.050
|
$1,400.000
|
|
|
RETAINING WALL (BRICK VENEER)
|
SF
|
764.000
|
$70.000
|
$88.000
|
$72.000
|
$180.000
|
$140.000
|
$177.450
|
$250.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
6.000
|
$500.000
|
$896.000
|
$1,135.000
|
$2,000.000
|
$525.000
|
$957.220
|
$1,400.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
162.000
|
$70.000
|
$107.000
|
$65.000
|
$150.000
|
$140.000
|
$84.930
|
$300.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
1,075.000
|
$250.000
|
$226.500
|
$150.000
|
$256.240
|
$245.000
|
$234.420
|
$400.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
1,181.000
|
$250.000
|
$253.000
|
$167.000
|
$306.610
|
$265.000
|
$252.730
|
$450.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
665.000
|
$250.000
|
$337.200
|
$215.000
|
$405.170
|
$370.000
|
$305.760
|
$500.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
305.000
|
$80.000
|
$205.500
|
$122.000
|
$129.210
|
$87.000
|
$139.740
|
$200.000
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
12.000
|
$5,000.000
|
$5,500.000
|
$5,250.000
|
$7,289.690
|
$6,400.000
|
$9,022.880
|
$15,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX5FT)
|
EA
|
2.000
|
$5,000.000
|
$5,585.000
|
$4,915.000
|
$6,978.700
|
$5,800.000
|
$8,536.680
|
$18,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(8FTX8FT)
|
EA
|
1.000
|
$8,000.000
|
$10,100.000
|
$7,700.000
|
$11,431.130
|
$12,000.000
|
$11,742.380
|
$20,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
2.000
|
$6,000.000
|
$5,270.000
|
$10,500.000
|
$3,832.650
|
$5,700.000
|
$7,126.350
|
$10,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
1.000
|
$6,000.000
|
$15,810.000
|
$17,000.000
|
$6,022.730
|
$17,500.000
|
$8,045.880
|
$21,000.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
6.000
|
$1,000.000
|
$1,350.000
|
$4,794.000
|
$711.780
|
$2,300.000
|
$2,446.060
|
$1,040.770
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
8.000
|
$700.000
|
$530.000
|
$4,370.000
|
$350.000
|
$870.000
|
$1,242.490
|
$975.690
|
|
|
ADJUSTING MANHOLES (WATER METER)
|
EA
|
8.000
|
$300.000
|
$530.000
|
$7,821.000
|
$350.000
|
$870.000
|
$1,036.180
|
$975.690
|
|
|
REMOV STR (RAILROAD CROSSING)
|
EA
|
1.000
|
$20,500.000
|
$9,300.000
|
$18,160.000
|
$10,000.000
|
$11,500.000
|
$18,390.580
|
$120,883.350
|
|
|
REMOV STR (PIPE)
|
EA
|
1.000
|
$2,000.000
|
$750.000
|
$10,000.000
|
$850.000
|
$290.000
|
$1,397.720
|
$10,567.030
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$988,000.000
|
$1,560,000.000
|
$1,600,000.000
|
$1,674,344.000
|
$1,907,022.900
|
$1,961,000.000
|
$2,377,619.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
38.000
|
$8,000.000
|
$14,500.000
|
$15,700.000
|
$9,000.000
|
$23,500.000
|
$7,502.870
|
$60,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
444.000
|
$20.000
|
$35.450
|
$12.000
|
$70.000
|
$35.000
|
$37.030
|
$8.740
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$10.000
|
$4.000
|
$5.000
|
$15.000
|
$14.500
|
$9.920
|
$4.370
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
1,480.000
|
$5.000
|
$11.300
|
$3.000
|
$15.000
|
$11.500
|
$5.750
|
$3.280
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,000.000
|
$3.000
|
$5.000
|
$4.000
|
$10.000
|
$3.500
|
$6.730
|
$3.280
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,000.000
|
$1.000
|
$1.100
|
$2.000
|
$2.000
|
$1.150
|
$1.150
|
$1.090
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,500.000
|
$1.000
|
$6.000
|
$4.000
|
$10.000
|
$6.950
|
$4.830
|
$5.460
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,500.000
|
$1.000
|
$1.000
|
$2.000
|
$1.000
|
$2.300
|
$0.520
|
$1.090
|
|
|
CONSTRUCTING DETOURS (TY 1)
|
SY
|
5,554.000
|
$40.000
|
$42.550
|
$57.000
|
$52.000
|
$44.500
|
$41.830
|
$42.140
|
|
|
CONSTRUCTING DETOURS (TY 2)
|
SY
|
2,285.000
|
$60.000
|
$65.000
|
$210.000
|
$90.000
|
$100.000
|
$76.590
|
$82.910
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
540.000
|
$40.000
|
$100.400
|
$150.000
|
$90.000
|
$125.000
|
$102.630
|
$200.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$40.000
|
$135.000
|
$400.000
|
$90.000
|
$150.000
|
$131.140
|
$200.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,620.000
|
$4.000
|
$14.250
|
$10.000
|
$40.000
|
$26.500
|
$3.880
|
$100.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
180.000
|
$4.000
|
$12.900
|
$20.000
|
$75.000
|
$26.500
|
$8.770
|
$100.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
540.000
|
$10.000
|
$14.700
|
$5.000
|
$75.000
|
$26.500
|
$10.430
|
$50.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$10.000
|
$31.400
|
$5.000
|
$60.000
|
$26.500
|
$11.170
|
$50.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,164.500
|
$20.000
|
$33.850
|
$33.000
|
$60.000
|
$33.500
|
$39.750
|
$46.000
|
|
|
CONC CURB & GUTTER (VALLEY GUTTER)
|
LF
|
2,751.500
|
$30.000
|
$31.600
|
$30.000
|
$60.000
|
$43.000
|
$57.340
|
$43.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
23,090.000
|
$25.000
|
$21.000
|
$37.000
|
$40.000
|
$37.000
|
$29.980
|
$63.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
5,993.000
|
$60.000
|
$61.850
|
$80.000
|
$90.000
|
$85.500
|
$114.660
|
$88.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
6,725.000
|
$50.000
|
$49.300
|
$47.000
|
$75.000
|
$88.500
|
$75.700
|
$83.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
28.000
|
$60.000
|
$153.000
|
$145.000
|
$85.000
|
$73.500
|
$175.450
|
$199.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
220.000
|
$200.000
|
$116.000
|
$110.000
|
$150.000
|
$150.000
|
$271.750
|
$154.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
46.000
|
$200.000
|
$142.250
|
$135.000
|
$150.000
|
$150.000
|
$187.570
|
$186.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
501.000
|
$200.000
|
$110.650
|
$105.000
|
$150.000
|
$150.000
|
$422.210
|
$147.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
101.000
|
$200.000
|
$112.750
|
$107.000
|
$150.000
|
$150.000
|
$363.410
|
$150.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
23.000
|
$300.000
|
$337.000
|
$210.000
|
$250.000
|
$175.000
|
$436.780
|
$237.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
137.000
|
$500.000
|
$450.000
|
$245.000
|
$475.000
|
$550.000
|
$545.970
|
$844.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$525.000
|
$485.000
|
$350.000
|
$600.000
|
$695.000
|
$689.650
|
$949.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,000.000
|
$540.000
|
$510.000
|
$685.000
|
$795.000
|
$787.350
|
$1,087.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
9.000
|
$500.000
|
$500.000
|
$340.000
|
$425.000
|
$495.000
|
$488.500
|
$882.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
|
EA
|
1.000
|
$1,000.000
|
$585.000
|
$450.000
|
$550.000
|
$640.000
|
$632.180
|
$1,087.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
190.000
|
$80.000
|
$140.000
|
$40.000
|
$95.580
|
$175.000
|
$172.410
|
$110.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
5.000
|
$80.000
|
$126.000
|
$80.000
|
$75.000
|
$140.000
|
$103.450
|
$149.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
111,228.000
|
$0.300
|
$0.280
|
$0.270
|
$0.250
|
$0.310
|
$0.310
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
232,716.000
|
$0.300
|
$0.280
|
$0.270
|
$0.250
|
$0.310
|
$0.310
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,000.000
|
$0.500
|
$0.390
|
$0.370
|
$1.000
|
$0.430
|
$0.430
|
$0.410
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
438.000
|
$3.000
|
$9.130
|
$9.000
|
$7.000
|
$10.000
|
$9.950
|
$9.550
|
|
|
WK ZN PAV MRK REMOV (W)(RR XING)
|
EA
|
18.000
|
$400.000
|
$845.000
|
$800.000
|
$575.000
|
$930.000
|
$919.530
|
$882.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
12,000.000
|
$0.500
|
$0.400
|
$0.380
|
$1.000
|
$0.440
|
$0.440
|
$0.420
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
15,324.000
|
$2.000
|
$1.050
|
$1.000
|
$6.000
|
$1.150
|
$1.710
|
$0.460
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
13,236.000
|
$2.000
|
$1.100
|
$1.000
|
$6.000
|
$1.150
|
$1.710
|
$0.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,735.000
|
$1.000
|
$0.950
|
$1.000
|
$1.200
|
$1.050
|
$1.030
|
$0.990
|
|
|
PAVEMENT SEALER 4"
|
LF
|
2,815.000
|
$0.200
|
$0.120
|
$0.110
|
$0.250
|
$0.130
|
$0.130
|
$0.120
|
|
|
PAVEMENT SEALER 6"
|
LF
|
520.000
|
$0.400
|
$0.180
|
$1.000
|
$0.250
|
$0.200
|
$0.200
|
$0.190
|
|
|
PAVEMENT SEALER 8"
|
LF
|
75.000
|
$0.800
|
$0.230
|
$1.000
|
$0.500
|
$0.260
|
$0.250
|
$0.240
|
|
|
PAVEMENT SEALER 12"
|
LF
|
560.000
|
$1.000
|
$0.360
|
$1.000
|
$0.650
|
$0.400
|
$0.390
|
$0.380
|
|
|
PAVEMENT SEALER 24"
|
LF
|
170.000
|
$2.000
|
$0.720
|
$1.000
|
$2.000
|
$0.790
|
$0.920
|
$0.750
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
12,070.000
|
$0.400
|
$0.470
|
$0.450
|
$0.450
|
$0.520
|
$0.520
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
7,540.000
|
$0.400
|
$0.680
|
$0.650
|
$0.700
|
$0.760
|
$0.750
|
$0.720
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,210.000
|
$0.400
|
$0.470
|
$1.500
|
$0.550
|
$0.520
|
$0.520
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
42,457.000
|
$0.400
|
$0.470
|
$0.450
|
$0.450
|
$0.520
|
$0.520
|
$0.500
|
|
PREFAB PAV MRK TY B (W)(4")(SLD)
|
LF
|
150.000
|
$1.000
|
$7.900
|
$8.000
|
$6.000
|
$8.700
|
$8.620
|
$8.270
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)
|
LF
|
520.000
|
$1.500
|
$13.340
|
$13.000
|
$7.500
|
$14.500
|
$14.550
|
$14.000
|
|
PREFAB PAV MRK TY B (W)(8")(SLD)
|
LF
|
75.000
|
$2.000
|
$13.340
|
$13.000
|
$7.850
|
$14.500
|
$14.550
|
$14.000
|
|
PREFAB PAV MRK TY B (W)(12")(SLD)
|
LF
|
560.000
|
$5.000
|
$23.180
|
$22.000
|
$11.250
|
$25.500
|
$25.290
|
$24.000
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
170.000
|
$10.000
|
$46.370
|
$44.000
|
$20.000
|
$51.000
|
$50.570
|
$49.000
|
|
PREFAB PAV MRK TY B (Y)(4")(BRK)
|
LF
|
60.000
|
$1.000
|
$7.900
|
$8.000
|
$6.000
|
$8.700
|
$8.620
|
$8.270
|
|
PREFAB PAV MRK TY B (Y)(4")(SLD)
|
LF
|
2,605.000
|
$1.000
|
$7.900
|
$8.000
|
$6.000
|
$8.700
|
$8.620
|
$8.270
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
240.000
|
$7.000
|
$8.300
|
$8.000
|
$7.800
|
$9.150
|
$9.060
|
$8.690
|
|
PREFAB PAV MRK TY C (W) (18") (SLD)
|
LF
|
120.000
|
$8.000
|
$12.500
|
$12.000
|
$11.600
|
$14.000
|
$13.630
|
$13.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
255.000
|
$12.000
|
$16.620
|
$16.000
|
$14.900
|
$18.500
|
$18.130
|
$17.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
7.000
|
$300.000
|
$790.330
|
$750.000
|
$875.000
|
$870.000
|
$862.060
|
$827.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,200.000
|
$3.000
|
$3.160
|
$3.000
|
$4.550
|
$3.500
|
$3.450
|
$3.310
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
496.000
|
$3.000
|
$3.160
|
$3.000
|
$4.550
|
$3.500
|
$3.450
|
$3.310
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
241,642.000
|
$0.600
|
$1.050
|
$0.100
|
$0.300
|
$0.810
|
$0.570
|
$0.550
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
600.000
|
$1.000
|
$2.110
|
$15.000
|
$1.000
|
$0.810
|
$4.600
|
$0.770
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
8.000
|
$200.000
|
$52.690
|
$50.000
|
$490.000
|
$2,300.000
|
$114.960
|
$165.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,815.000
|
$0.100
|
$0.610
|
$1.000
|
$0.550
|
$0.670
|
$0.670
|
$0.640
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
520.000
|
$0.200
|
$0.930
|
$1.000
|
$0.840
|
$1.000
|
$1.010
|
$0.970
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
75.000
|
$0.500
|
$1.230
|
$2.000
|
$1.000
|
$1.350
|
$1.340
|
$1.290
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
560.000
|
$1.000
|
$1.850
|
$2.000
|
$1.650
|
$2.050
|
$2.020
|
$1.940
|
|
|
PAV SURF PREP FOR MRK (18")
|
LF
|
120.000
|
$1.500
|
$2.170
|
$3.000
|
$2.300
|
$2.400
|
$2.370
|
$2.270
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
170.000
|
$2.000
|
$3.720
|
$4.000
|
$2.450
|
$4.100
|
$4.060
|
$3.700
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
7.000
|
$10.000
|
$111.650
|
$110.000
|
$170.000
|
$125.000
|
$121.780
|
$117.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')
|
EA
|
2.000
|
$10,000.000
|
$16,175.380
|
$13,000.000
|
$7,500.000
|
$11,500.000
|
$8,620.590
|
$20,241.000
|
|
|
LITTER REMOVAL
|
CYC
|
4.000
|
$2,000.000
|
$4,300.000
|
$4,100.000
|
$8,000.000
|
$9,300.000
|
$2,873.500
|
$2,758.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$21,800.000
|
$8,000.000
|
$16,000.000
|
$20,500.000
|
$20,641.130
|
$15,939.000
|
|
|
TMA (STATIONARY)
|
EA
|
4.000
|
$10,000.000
|
$36,140.000
|
$37,500.000
|
$15,000.000
|
$69,500.000
|
$68,964.680
|
$49,638.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$250.000
|
$950.000
|
$1,100.000
|
$800.000
|
$1,200.000
|
$681.470
|
$1,434.000
|
|
|
WATER LINE MAIN RELOCATION
|
LS
|
1.000
|
$1,500,000.000
|
$722,000.000
|
$815,000.000
|
$650,000.000
|
$730,000.000
|
$524,953.200
|
$1,100,000.000
|
|
Totals: |
$15,104,207.100
|
$15,741,046.835
|
$16,887,292.880
|
$18,243,078.610
|
$19,070,630.400
|
$19,758,542.465
|
$23,918,522.660
|