EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
50.000
|
$35.000
|
$80.000
|
$53.760
|
|
|
BACKFILL (TY B)
|
STA
|
119.000
|
$200.000
|
$300.000
|
$337.150
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
7,934.000
|
$0.520
|
$0.750
|
$2.070
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
1,984.000
|
$0.540
|
$0.750
|
$0.780
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
1,984.000
|
$0.540
|
$0.750
|
$0.780
|
|
|
VEGETATIVE WATERING
|
MG
|
192.000
|
$7.000
|
$10.000
|
$76.550
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
2,934.000
|
$25.000
|
$65.000
|
$50.000
|
|
|
PLANE ASPH CONC PAV (0" TO 5")
|
SY
|
111,728.000
|
$4.000
|
$4.250
|
$2.700
|
|
|
PLANE ASPH CONC PAV (5")
|
SY
|
113,050.000
|
$3.000
|
$5.500
|
$5.060
|
|
|
FLOWABLE BACKFILL
|
CY
|
24.000
|
$175.000
|
$400.000
|
$464.800
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
28.000
|
$525.000
|
$600.000
|
$644.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
520.000
|
$160.000
|
$250.000
|
$260.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$800,000.000
|
$1,100,000.000
|
$1,217,017.700
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$5,000.000
|
$10,000.000
|
$50,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
400.000
|
$2.750
|
$6.000
|
$4.480
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
400.000
|
$0.850
|
$1.000
|
$1.120
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
510.000
|
$28.000
|
$100.000
|
$129.920
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
510.000
|
$6.000
|
$10.000
|
$28.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
510.000
|
$6.000
|
$5.000
|
$31.360
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
23,800.000
|
$0.140
|
$0.550
|
$0.340
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$21.000
|
$30.000
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,775.000
|
$2,500.000
|
$2,128.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
750.000
|
$3.250
|
$3.000
|
$2.240
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$235.000
|
$200.000
|
$224.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,740.000
|
$3,500.000
|
$3,556.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$260.000
|
$220.000
|
$224.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,350.000
|
$2,500.000
|
$1,960.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$850.000
|
$1,000.000
|
$896.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$9,500.000
|
$13,000.000
|
$12,768.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$25.000
|
$25.000
|
$26.880
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$45.000
|
$40.000
|
$38.080
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
6,092.000
|
$0.400
|
$0.550
|
$0.560
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
52,100.000
|
$0.250
|
$0.550
|
$0.560
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
11,866.000
|
$0.250
|
$0.550
|
$0.560
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
49,980.000
|
$0.250
|
$0.550
|
$0.560
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
7,270.000
|
$0.850
|
$1.100
|
$1.120
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
19,374.000
|
$1.500
|
$1.100
|
$1.120
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
462,837.000
|
$0.750
|
$0.550
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
617,115.000
|
$0.750
|
$0.550
|
$0.500
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
16,444.000
|
$1.650
|
$1.500
|
$2.040
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
37,758.000
|
$1.750
|
$1.500
|
$2.040
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
75.000
|
$1.000
|
$2.200
|
$2.240
|
|
|
PAVEMENT SEALER 10"
|
LF
|
140.000
|
$0.600
|
$2.200
|
$2.240
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
140.000
|
$12.000
|
$22.000
|
$22.400
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
160.000
|
$12.750
|
$20.000
|
$16.800
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
16.000
|
$215.000
|
$210.000
|
$229.600
|
|
REFL PAV MRKR TY I-C
|
EA
|
305.000
|
$3.750
|
$5.000
|
$4.480
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
610.000
|
$4.000
|
$5.000
|
$4.480
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
4,780.000
|
$0.360
|
$1.100
|
$1.120
|
|
|
ELIM EXT PAV MRK & MRKS (10")
|
LF
|
140.000
|
$1.750
|
$3.300
|
$3.360
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
31,193.000
|
$125.000
|
$170.000
|
$170.650
|
|
|
TACK COAT
|
GAL
|
22,610.000
|
$3.100
|
$4.000
|
$6.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
12,218.000
|
$160.000
|
$210.000
|
$211.800
|
|
|
TACK COAT
|
GAL
|
11,106.000
|
$3.100
|
$4.000
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$40,000.000
|
$12,473.100
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
11,525.000
|
$4.000
|
$6.600
|
$6.720
|
|
|
REFL PAV MRK AWT (W) (6")(SLD)(125 MIL)
|
LF
|
24,360.000
|
$0.700
|
$0.820
|
$0.840
|
|
|
REFL PAV MRK AWT (W) (6")(BRK)(125 MIL)
|
LF
|
7,161.000
|
$0.700
|
$0.820
|
$0.840
|
|
|
REFL PAV MRK AWT (Y) (6")(SLD)(125 MIL)
|
LF
|
24,990.000
|
$0.700
|
$0.820
|
$0.840
|
|
|
REFL PAV MRK AWT (Y) (6")(BRK)(125 MIL)
|
LF
|
6,091.000
|
$0.700
|
$0.820
|
$0.840
|
|
|
TMA (STATIONARY)
|
DAY
|
130.000
|
$150.000
|
$300.000
|
$460.400
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
6.000
|
$200.000
|
$300.000
|
$104.560
|
|
Totals: |
$8,971,075.350
|
$11,842,462.040
|
$12,170,177.060
|