CASS US 59 (0218-03-094)

Items: 57

County: CASS
Length: N/A
Highway: US 59
District: ATLANTA
Control Number: 0218-03-094
DBE Goal: 0.0%
Project: C 218-3-94
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $9,753,014.10
Date: 01/05/2024 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$9,753,014.10
1
$9,155,619.99
Over/Under Est: -6.13% -$597,394.11
Over/Under Est: -5.44% -$530,800.25
Amt Left: 0.73% $66,593.86
Over/Under Est: 0.36% $35,256.66
Amt Left: 6.91% $632,650.77
Delta: -6.14% -$566,056.91
Subcontractor Percentage Amount
TEXOP CONSTRUCTION 6.32% $493,375.86
STRIPING TECHNOLOGY, L.P. 3.47% $270,888.33
WITHERS CONSTRUCTION, LLC 2.53% $197,506.47
O. TREVINO CONSTRUCTION, LLC 2.38% $185,796.60
SOUTHWEST ENVIRONMENT SERVICES LLC 1.30% $101,485.54
PANOLA SIGN & BARRICADE, INC. 0.38% $29,665.00
DUSTIN ALLEN, INC. 0.35% $27,323.03
BAHENA CONSTRUCTION CO.,INC. 0.29% $22,639.08
ACT SAW CUTTING & REMOVAL 0.25% $19,516.45
INDUSTRIAL FABRICS, INC. 0.21% $16,393.82
SURFACE PREPARATION TECHNOLOGIES, LLC 0.13% $10,148.55
BRENDA PRICE TRUCKING, INC. 0.04% $3,122.63
H. V. CAVER, INC. 0.04% $3,122.63
Total: 17.69% $1,380,983.99

Bid Items & Bid Tabulations

57 Total 0 of 57
CASS  |  US 59  |  ATLANTA  |  0218-03-094  |  01/05/2024  |  $9,753,014.10  |  C 218-3-94  |  REHAB EXIST ROADWAY  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
EAST TEXAS BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
PREPARING ROW
STA 222.500 $1,500.000 $1,023.500 $1,200.000 $1,500.000
REMOVING CONCRETE(MOW STRIP)
LF 475.000 $8.830 $18.710 $15.000 $30.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 14.000 $40.000 $220.800 $80.000 $100.000
BACKFILL (TY B)
STA 334.100 $265.180 $159.800 $300.000 $200.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 148,335.000 $0.750 $0.610 $0.620 $0.800
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 148,335.000 $0.170 $0.120 $0.120 $0.150
VEGETATIVE WATERING
MG 4,746.700 $10.000 $24.920 $7.000 $15.000
FLEX PAVEMENT STRUCTURE REPAIR (2"-4")
SY 2,000.000 $45.000 $44.230 $55.000 $100.000
PLANE ASPH CONC PAV (2")
SY 5,512.000 $4.750 $3.460 $5.000 $2.100
PLANE ASPH CONC PAV (3 1/2")
SY 144,531.000 $2.500 $3.800 $4.250 $3.100
ASPH BINDER(PG 64-22)
GAL 1,203.000 $6.000 $5.180 $3.000 $20.000
FABRIC
SY 5,512.000 $110.000 $3.210 $3.000 $10.000
FULL-DEPTH REPAIR CPCD (12"-14")
SY 287.000 $287.000 $698.660 $800.000 $475.000
RIPRAP (MOW STRIP)(4 IN)
CY 29.000 $600.000 $805.000 $600.000 $1,015.000
MOBILIZATION
LS 1.000 $665,499.000 $366,224.800 $800,000.000 $725,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $10,000.000 $20,838.310 $20,000.000 $10,500.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 38,279.000 $0.500 $0.170 $0.500 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 325.000 $30.000 $31.050 $36.000 $40.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $45.000 $105.800 $110.000 $122.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,155.000 $1,725.000 $1,500.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 325.000 $3.000 $5.750 $3.000 $7.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $175.000 $575.000 $200.000 $660.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,300.000 $4,312.500 $3,200.000 $5,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $275.000 $345.000 $250.000 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $785.000 $1,276.500 $1,500.000 $1,500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 6.000 $496.080 $911.950 $1,000.000 $1,050.000
REMOVE SM RD SN SUP&AM
EA 10.000 $87.300 $110.400 $150.000 $130.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $35.000 $49.390 $60.000 $60.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 34,189.000 $0.500 $0.290 $0.270 $0.350
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 36,971.000 $0.500 $0.290 $0.270 $0.350
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 418.000 $4.500 $4.600 $5.000 $5.300
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 510.000 $4.750 $4.600 $5.000 $5.300
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 510.000 $4.000 $4.600 $5.000 $5.300
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 8,355.000 $2.280 $5.800 $4.000 $2.200
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 4,234.000 $0.500 $5.800 $2.000 $2.200
PAVEMENT SEALER 10"
LF 1,338.000 $0.500 $1.150 $1.100 $1.350
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 8,375.000 $9.820 $12.650 $12.000 $14.500
PREFAB PAV MRK TY C (W) (8") (DOT)
LF 814.000 $5.310 $5.750 $5.500 $6.600
PREFAB PAV MRK TY C (W) (8") (SLD)
LF 5,715.000 $5.500 $5.750 $5.500 $6.600
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 495.000 $20.000 $16.100 $15.000 $18.500
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $316.190 $316.250 $300.000 $365.000
REFL PAV MRKR TY I-C
EA 1,122.000 $3.750 $4.600 $4.500 $5.300
REFL PAV MRKR TY II-A-A
EA 335.000 $4.500 $4.600 $4.500 $5.300
REFL PAV MRKR TY II-C-R
EA 702.000 $4.000 $4.600 $4.500 $5.300
ELIM EXT PAV MRK & MRKS (6")
LF 35,077.000 $0.750 $0.630 $0.600 $0.750
NO. OF WORKING DAYS
$/D 20,440.000 $66.000 $66.000 $51.000 $60.000
SP MIXES SP-D PG76-22
TON 17,637.740 $175.000 $162.590 $165.000 $175.850
TACK COAT
GAL 18,629.000 $6.000 $5.700 $4.000 $7.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 11,173.800 $200.000 $212.520 $200.000 $216.800
TACK COAT
GAL 10,159.000 $6.000 $6.240 $4.000 $7.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $13,031.930 $30,000.000 $24,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 5,350.000 $5.000 $5.750 $5.500 $6.600
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 35,809.000 $0.750 $0.920 $0.880 $1.100
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 35,191.000 $0.750 $0.920 $0.880 $1.100
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
LF 2,695.000 $0.630 $1.150 $1.100 $1.350
TMA (STATIONARY)
DAY 74.000 $150.000 $487.710 $300.000 $330.000
TMA (MOBILE OPERATION)
DAY 6.000 $200.000 $898.450 $300.000 $330.000
Totals: $9,753,014.098 $9,155,620.007 $9,222,213.850 $9,788,270.769