PREPARING ROW
|
AC
|
6.000
|
$15,000.000
|
$10,400.000
|
$25,000.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
96.000
|
$15.000
|
$80.000
|
$25.000
|
|
|
REMOVE CONC (MISC)
|
EA
|
15.000
|
$1,000.000
|
$660.000
|
$500.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,505.000
|
$8.000
|
$55.250
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
39,654.000
|
$12.000
|
$25.600
|
$20.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
42,768.000
|
$0.250
|
$0.120
|
$0.250
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
42,768.000
|
$0.250
|
$0.120
|
$0.250
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
703.000
|
$2.000
|
$2.650
|
$2.000
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR4)(10")
|
SY
|
14,410.000
|
$25.000
|
$20.150
|
$20.000
|
|
|
REWORK BS MTL (TY A) (6") (DENS CONT)
|
SY
|
6,980.000
|
$5.000
|
$1.200
|
$2.500
|
|
|
PRIME COAT (AE-P)
|
GAL
|
3,630.000
|
$4.000
|
$5.100
|
$4.600
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
|
TON
|
4,309.000
|
$165.000
|
$133.000
|
$110.000
|
|
|
TACK COAT
|
GAL
|
3,401.000
|
$4.000
|
$3.500
|
$3.700
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
2,215.000
|
$10.000
|
$13.550
|
$15.000
|
|
|
CEM STABIL BKFL
|
CY
|
200.000
|
$225.000
|
$267.000
|
$250.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,600.000
|
$25.000
|
$5.800
|
$34.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
857.000
|
$200.000
|
$250.000
|
$350.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
144.000
|
$200.000
|
$316.500
|
$200.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
51.400
|
$1,500.000
|
$1,450.000
|
$2,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
23.400
|
$1,500.000
|
$1,600.000
|
$2,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
32.700
|
$1,750.000
|
$1,570.000
|
$2,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
8,280.000
|
$27.000
|
$45.000
|
$45.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
70.700
|
$1,100.000
|
$822.000
|
$2,000.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
5,466.000
|
$60.000
|
$56.950
|
$100.000
|
|
|
PRESTR CONC BOX BEAM (5XB34)
|
LF
|
1,074.000
|
$350.000
|
$371.500
|
$400.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
935.000
|
$12.000
|
$9.500
|
$8.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
236.300
|
$600.000
|
$452.500
|
$500.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
33.300
|
$750.000
|
$630.000
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
55.000
|
$450.000
|
$510.000
|
$500.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
396.000
|
$80.000
|
$89.000
|
$90.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
92.000
|
$175.000
|
$110.000
|
$75.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
75.500
|
$500.000
|
$875.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
45.500
|
$125.000
|
$306.500
|
$300.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
4.000
|
$5,500.000
|
$10,150.000
|
$5,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
2.000
|
$6,500.000
|
$12,675.000
|
$20,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$5,900.000
|
$5,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
8.000
|
$1,400.000
|
$2,400.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
10.000
|
$30.000
|
$120.000
|
$150.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$250,000.000
|
$141,000.000
|
$350,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$350,000.000
|
$570,000.000
|
$550,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$14,000.000
|
$13,000.000
|
$10,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
260.000
|
$5.000
|
$7.550
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
260.000
|
$2.000
|
$2.550
|
$5.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
20.000
|
$50.000
|
$150.000
|
$140.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (54 )
|
LF
|
100.000
|
$200.000
|
$310.000
|
$300.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
700.000
|
$26.000
|
$28.500
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$2,530.000
|
$1,650.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,325.000
|
$4.000
|
$3.700
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$350.000
|
$315.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,800.000
|
$3,165.000
|
$2,675.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$300.000
|
$315.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,700.000
|
$2,110.000
|
$1,750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
2.000
|
$20,000.000
|
$26,365.000
|
$21,625.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
401.000
|
$40.000
|
$34.400
|
$114.480
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
9.000
|
$1,100.000
|
$530.000
|
$750.000
|
|
|
IN RD IL (TY AL) 40T-8 (250W EQ) LED
|
EA
|
18.000
|
$5,000.000
|
$4,745.000
|
$3,750.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
3,445.000
|
$9.000
|
$5.300
|
$6.500
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
3,995.000
|
$3.000
|
$2.650
|
$3.000
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
7,990.000
|
$3.000
|
$3.150
|
$3.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$1,000.000
|
$1,160.000
|
$750.000
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)TP(O)
|
EA
|
1.000
|
$7,000.000
|
$6,330.000
|
$6,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
12.000
|
$1,000.000
|
$790.000
|
$475.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$1,000.000
|
$790.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
19.000
|
$1,000.000
|
$845.000
|
$460.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,050.000
|
$870.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,400.000
|
$1,080.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
5.000
|
$1,000.000
|
$1,240.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$1,600.000
|
$1,355.000
|
$2,150.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
28.000
|
$120.000
|
$105.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$25.000
|
$21.000
|
$24.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$25.000
|
$37.000
|
$29.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
75.000
|
$9.000
|
$42.000
|
$40.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
17.000
|
$30.000
|
$105.000
|
$100.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
600.000
|
$1.000
|
$3.150
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
12,839.000
|
$2.000
|
$0.790
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
660.000
|
$2.000
|
$0.790
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
7,485.000
|
$2.000
|
$0.790
|
$0.750
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
72.000
|
$7.000
|
$26.350
|
$25.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
600.000
|
$0.740
|
$3.160
|
$3.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
5,466.000
|
$1.000
|
$2.150
|
$1.200
|
|
|
REMOVE CONDUCTOR
|
LF
|
1,981.000
|
$2.000
|
$0.550
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$24,100.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
300.000
|
$180.000
|
$675.000
|
$315.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
425.000
|
$50.000
|
$67.500
|
$95.000
|
|
Totals: |
$4,863,893.500
|
$5,732,295.930
|
$5,959,892.880
|