Show Job Controls
Bid Cobra

CARSON SH 152 (0455-02-031)

Items: 103

County: CARSON
Length: N/A
Highway: SH 152
District: AMARILLO
Control Number: 0455-02-031
DBE Goal: N/A
Project: F 2B23(295)
Guaranty: N/A
Time: 202 WORKING DAYS
Engineer's Estimate: $17,731,103.46
Date: 11/02/2023 (2 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
ZACHARY MAYER
IVAN FUENTES
KENNETH PETR
LADENIA JEWITT
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$17,731,103.46
1
$16,474,504.34
Over/Under Est: -7.09% -$1,256,599.12
$18,036,836.05
Over/Under Est: 1.72% $305,732.59
Amt Left: 9.48% $1,562,331.71
$18,315,456.95
Over/Under Est: 3.3% $584,353.49
Amt Left: 11.17% $1,840,952.61
Delta: -1.54% -$278,620.90
$21,703,665.65
Over/Under Est: 22.4% $3,972,562.19
Amt Left: 31.74% $5,229,161.31
Delta: -18.50% -$3,388,208.70
Subcontractor Percentage Amount
INDUSTRIAL FABRICS, INC. 7.92% $1,474,147.46
BAHENA CONSTRUCTION CO., INC. 6.15% $1,144,697.84
TRP CONSTRUCTION GROUP, LLC 2.62% $487,659.89
TEX OP CONSTRUCTION, LP 1.09% $202,881.41
WITHERS CONSTRUCTION, LLC 0.70% $130,290.81
MURRAY CONSTRUCTION 0.64% $119,123.03
DUSTIN ALLEN, INC. 0.47% $87,480.97
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.25% $46,532.43
SURFACE PREPARATION TECHNOLOGIES, LLC 0.17% $31,642.05
FC TRAFFIC CONTROL, INC. 0.13% $24,196.86
Total: 20.14% $3,748,652.75

Bid Items & Bid Tabulations

103 Total 0 of 103
CARSON  |  SH 152  |  AMARILLO  |  0455-02-031  |  11/02/2023  |  $17,731,103.46  |  F 2B23(295)  |  HWY IMPRV  |  202 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
DUININCK, INC.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
PREPARING ROW
AC 43.430 $200.000 $235.200 $150.000 $285.000 $2,000.000
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 184.000 $250.000 $577.500 $615.000 $130.000 $500.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 27.000 $1,300.000 $1,375.000 $1,500.000 $1,000.000 $500.000
REMOVING STAB BASE & ASPH PAV (8"-12")
SY 24,058.000 $10.000 $12.670 $12.500 $16.000 $5.000
EXCAVATION (ROADWAY)
CY 12,240.000 $18.000 $19.120 $26.500 $30.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 51.600 $80.000 $110.680 $115.000 $69.000 $35.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 5,943.000 $22.000 $16.800 $26.000 $30.000 $20.000
BACKFILL (TY A)
STA 636.000 $220.000 $224.520 $255.000 $265.000 $250.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 43.430 $725.000 $616.000 $655.000 $590.000 $560.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 43.430 $550.000 $506.000 $540.000 $485.000 $460.000
FL BS (CMP IN PLC)(TY A OR B GR4)(12")
SY 37,987.000 $39.000 $39.130 $40.500 $29.000 $32.000
CEMENT
TON 430.000 $240.000 $288.030 $320.000 $255.000 $300.000
CEMENT TREAT (SUBGRADE) (8")
SY 39,830.000 $5.000 $4.810 $6.600 $5.000 $7.500
PRIME COAT (MC-30)
GAL 9,497.000 $5.000 $5.160 $5.700 $6.350 $5.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 7,069.000 $4.500 $4.250 $5.350 $5.750 $4.500
ASPH (AC-5)
GAL 14,066.000 $5.000 $4.630 $6.450 $7.200 $5.000
AGGR(TY-B GR-4 SAC-B)
CY 337.000 $250.000 $296.820 $255.000 $250.000 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 48,000.000 $32.000 $29.060 $35.500 $35.000 $40.000
PLANE ASPH CONC PAV(0" TO 2")
SY 9,258.000 $5.000 $4.300 $5.900 $6.350 $7.500
TEMPORARY SPL SHORING
SF 480.000 $100.000 $110.000 $99.500 $90.000 $85.000
RIPRAP (CONC)(4 IN)
CY 11.000 $750.000 $880.000 $935.000 $850.000 $800.000
RIPRAP (MOW STRIP)(4 IN)
CY 66.000 $750.000 $880.000 $965.000 $740.000 $825.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 91.000 $650.000 $825.000 $865.000 $785.000 $740.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 2.000 $675.000 $935.000 $995.000 $900.000 $850.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 20.000 $950.000 $990.000 $1,400.000 $1,270.000 $1,200.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 4.000 $1,200.000 $1,155.000 $1,600.000 $1,425.000 $1,350.000
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 6.000 $1,500.000 $1,320.000 $2,100.000 $1,900.000 $1,800.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 18.000 $2,000.000 $1,650.000 $2,300.000 $2,150.000 $2,000.000
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 13.000 $1,350.000 $1,100.000 $1,300.000 $1,165.000 $1,100.000
WINGWALL (PW - 1) (HW=12 FT)
EA 1.000 $115,000.000 $77,000.000 $120,000.000 $105,000.000 $99,500.000
WINGWALL (PW - 1) (HW=13 FT)
EA 1.000 $115,000.000 $82,500.000 $150,000.000 $132,000.000 $125,000.000
WINGWALL (PW - 1) (HW=3 FT)
EA 1.000 $15,000.000 $16,500.000 $11,500.000 $10,500.000 $10,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $35,000.000 $30,800.000 $16,500.000 $14,800.000 $14,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 8.000 $38,000.000 $33,000.000 $30,500.000 $27,500.000 $26,000.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 8.000 $9,000.000 $7,150.000 $9,900.000 $9,000.000 $8,500.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 8.000 $9,500.000 $7,700.000 $11,000.000 $10,000.000 $9,500.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 3.000 $10,000.000 $10,450.000 $15,000.000 $13,520.000 $12,800.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 3.000 $9,500.000 $7,700.000 $12,500.000 $11,350.000 $10,750.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $10,000.000 $8,250.000 $14,500.000 $13,200.000 $12,500.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 3.000 $13,000.000 $15,400.000 $11,000.000 $10,000.000 $9,500.000
SET (TY I)(S= 5 FT)(HW= 7 FT)(4:1) (C)
EA 1.000 $16,000.000 $19,800.000 $41,000.000 $37,000.000 $35,000.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $13,000.000 $9,900.000 $14,000.000 $12,675.000 $12,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $16,000.000 $14,300.000 $26,500.000 $24,000.000 $22,500.000
SET (TY I)(S= 7 FT)(HW= 8 FT)(4:1) (C)
EA 1.000 $20,000.000 $19,800.000 $52,500.000 $47,500.000 $45,000.000
CLEAN EXIST CULVERTS
EA 33.000 $4,000.000 $2,200.000 $2,000.000 $3,200.000 $2,000.000
REMOV STR (INLET)
EA 6.000 $750.000 $1,650.000 $585.000 $860.000 $500.000
REMOV STR (WINGWALL)
EA 29.000 $1,500.000 $1,650.000 $1,200.000 $1,400.000 $1,000.000
REMOV STR (BOX CULVERT)
LF 74.000 $150.000 $165.000 $93.500 $85.000 $80.000
MOBILIZATION
LS 1.000 $1,500,000.000 $658,980.170 $1,700,000.000 $1,830,000.000 $2,120,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $35,000.000 $20,637.540 $26,500.000 $45,000.000 $75,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 125.000 $5.000 $9.900 $10.500 $11.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 125.000 $2.000 $4.400 $4.700 $4.250 $5.000
INTERSECTIONS (ACP)
SY 6,788.000 $60.000 $22.090 $37.000 $25.000 $20.000
DRIVEWAYS (ACP) (TYPE 2)
SY 832.000 $100.000 $58.370 $37.000 $38.000 $20.000
RUMBLE STRIPS (SHOULDER)
LF 127,245.000 $0.250 $0.130 $0.100 $0.250 $0.400
RUMBLE STRIPS (CENTERLINE)
LF 63,623.000 $0.300 $0.130 $0.100 $0.250 $0.500
MTL W-BEAM GD FEN (STEEL POST)
LF 1,350.000 $35.000 $33.280 $35.500 $34.000 $35.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $5.000 $16.500 $17.500 $2.150 $15.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,500.000 $3,767.500 $4,000.000 $3,460.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $400.000 $1,100.000 $1,200.000 $215.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 32.000 $850.000 $797.500 $850.000 $900.000 $725.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 41.000 $900.000 $880.000 $935.000 $1,030.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 16.000 $1,100.000 $1,210.000 $1,300.000 $1,240.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,500.000 $1,320.000 $1,400.000 $1,500.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 5.000 $1,500.000 $1,430.000 $1,500.000 $1,600.000 $1,300.000
REMOVE SM RD SN SUP&AM
EA 85.000 $150.000 $110.000 $115.000 $110.000 $100.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 120.000 $50.000 $22.000 $23.500 $16.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $47.250 $49.500 $52.500 $42.250 $45.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 120.000 $135.000 $104.500 $110.000 $160.000 $95.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BR)
EA 30.000 $135.000 $104.500 $110.000 $160.000 $95.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND(BI)
EA 37.000 $135.000 $104.500 $110.000 $160.000 $95.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 59.000 $135.000 $104.500 $110.000 $160.000 $95.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 6.000 $135.000 $104.500 $110.000 $160.000 $95.000
INSTL OM ASSM (OM-3L)(WFLX)GND)GND
EA 2.000 $135.000 $715.000 $760.000 $635.000 $650.000
INSTL OM ASSM (OM-3R)(WFLX)GND)GND
EA 2.000 $135.000 $715.000 $760.000 $635.000 $650.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 5,869.000 $0.750 $0.390 $0.230 $0.350 $0.350
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 46,948.000 $0.700 $0.330 $0.230 $0.350 $0.300
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 87,164.000 $0.700 $0.330 $0.230 $0.350 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,887.000 $1.200 $1.880 $1.650 $1.800 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 6,508.000 $1.200 $1.880 $1.650 $1.800 $1.500
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 1,965.000 $0.850 $1.380 $0.840 $1.350 $1.250
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 218.000 $1.000 $4.400 $0.840 $4.250 $4.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 5,471.000 $1.160 $1.160 $0.840 $1.100 $1.050
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 125.000 $17.000 $9.610 $13.000 $9.250 $8.740
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 12.000 $384.000 $275.000 $255.000 $265.000 $250.000
REFL PAV MRK TY I(W)(LNDP ARW)(090MIL)
EA 12.000 $350.000 $440.000 $385.000 $425.000 $400.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 12.000 $400.000 $385.000 $385.000 $370.000 $350.000
ELIM EXT PAV MRK & MRKS (4")
LF 67,056.000 $1.250 $0.610 $0.640 $0.600 $0.550
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 253,423.000 $6.800 $6.380 $7.000 $6.150 $6.500
ASPH FOR REINF FAB (PG70-28)
GAL 55,753.000 $4.750 $4.680 $4.150 $6.350 $5.000
D-GR HMA TY-B PG64-28
TON 6,107.000 $144.000 $120.000 $155.000 $155.000 $200.000
SP MIXES SP-D SAC-A PG70-28
TON 39,560.000 $140.000 $149.080 $132.210 $146.000 $210.000
UNDERSEAL COURSE
GAL 24,742.000 $4.500 $7.770 $5.000 $4.950 $7.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $15,000.000 $18,976.210 $8,800.000 $11,000.000 $20,000.000
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
LF 8,762.000 $0.650 $0.830 $0.840 $0.800 $0.750
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
LF 139,543.000 $0.600 $0.770 $0.840 $0.750 $0.700
HPPM W/RET REQ TY I(Y)6"(BRK)(090MIL)
LF 3,155.000 $0.650 $0.880 $0.840 $0.850 $0.800
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
LF 130,738.000 $0.600 $0.770 $0.840 $0.750 $0.700
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $15,000.000 $9,488.110 $10,000.000 $11,000.000 $12,000.000
TMA (STATIONARY)
DAY 200.000 $250.000 $466.610 $350.000 $470.000 $300.000
TMA (MOBILE OPERATION)
HR 136.000 $150.000 $106.300 $115.000 $95.000 $95.000
REC REFL PAV MRKR TY I-C
EA 815.000 $26.000 $44.000 $27.000 $42.250 $40.000
REC REFL PAV MRKR TY II-A-A
EA 3,898.000 $26.000 $44.000 $27.000 $42.250 $40.000
Totals: $17,731,103.460 $16,474,504.354 $18,036,836.050 $18,315,456.950 $21,703,665.650