CARSON SH 207 (0356-02-048)

Items: 38

County: CARSON
Length: N/A
Highway: SH 207
District: AMARILLO
Control Number: 0356-02-048
DBE Goal: N/A
Project: STP 2020(635)
Guaranty: N/A
Time: 129 WORKING DAYS
Engineer's Estimate: $1,133,460.00
Date: 03/04/2020 (6 years ago)
Contract Number: N/A
Type: REPLACE EXISTING LIFT STATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,133,460.00
Over/Under Est: -8.03% -$90,992.00
$1,312,635.00
Over/Under Est: 15.81% $179,175.00
Amt Left: 25.92% $270,167.00
$1,610,913.00
Over/Under Est: 42.12% $477,453.00
Amt Left: 54.53% $568,445.00
Delta: -22.72% -$298,278.00
$1,847,315.32
Over/Under Est: 62.98% $713,855.32
Amt Left: 77.21% $804,847.32
Delta: -14.68% -$236,402.32
Over/Under Est: 78.6% $890,878.00
Amt Left: 94.19% $981,870.00
Delta: -9.58% -$177,022.68

Bid Items & Bid Tabulations

38 Total 0 of 38
CARSON  |  SH 207  |  AMARILLO  |  0356-02-048  |  03/04/2020  |  $1,133,460.00  |  STP 2020(635)  |  REPLACE EXIST LIFT STATION  |  129 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
L A FULLER & SONS CONSTRUCTION, LTD.
EARTH BUILDERS, L.P.
SJ&J CONSTRUCTION, LLC
DCI CONTRACTING, INC.
AUSTIN ENGINEERING CO., INC.
PREPARING ROW
AC 2.000 $10,000.000 $25,000.000 $25,000.000 $10,000.000 $8,442.000 $20,000.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 15.000 $800.000 $832.000 $500.000 $2,000.000 $2,546.030 $400.000
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 345.000 $250.000 $264.000 $100.000 $200.000 $163.190 $30.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 210.000 $500.000 $448.000 $200.000 $2,000.000 $580.720 $70.000
REMOVING CONC (PAV)
SY 241.000 $25.000 $18.500 $10.000 $45.000 $58.400 $75.000
EXCAVATION (CHANNEL)
CY 2,895.000 $25.000 $19.300 $50.000 $25.000 $33.360 $45.000
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 106.000 $40.000 $40.200 $50.000 $30.000 $50.590 $35.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 1.800 $750.000 $1,162.000 $2,000.000 $1,000.000 $1,608.000 $8,000.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 1.800 $650.000 $1,162.000 $2,000.000 $1,000.000 $1,608.000 $3,000.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 10,715.000 $3.000 $1.300 $4.000 $3.000 $1.680 $3.000
FULL - DEPTH REPAIR CPJR (8")
SY 175.000 $250.000 $194.000 $250.000 $150.000 $187.630 $468.000
CEM STABIL BKFL
CY 120.000 $200.000 $130.000 $250.000 $200.000 $361.820 $225.000
TEMPORARY SPL SHORING
SF 896.000 $20.000 $2.400 $20.000 $35.000 $95.770 $18.000
CL A CONC (FLUME)
CY 207.000 $520.000 $593.000 $725.000 $1,000.000 $1,064.680 $1,865.000
RC PIPE (CL III)(24 IN)
LF 311.000 $175.000 $158.000 $300.000 $120.000 $288.990 $200.000
MANH (COMPL)(PRM)(48IN)
EA 4.000 $5,500.000 $6,930.000 $10,000.000 $10,000.000 $10,559.200 $12,000.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 4.000 $6,700.000 $8,011.000 $10,000.000 $5,000.000 $10,210.800 $15,000.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 4.000 $1,500.000 $1,801.000 $4,000.000 $2,000.000 $5,025.000 $3,000.000
REMOV STR (PIPE)
LF 62.000 $20.000 $16.700 $20.000 $45.000 $45.420 $50.000
MOBILIZATION
LS 1.000 $75,000.000 $99,779.300 $145,000.000 $200,000.000 $174,200.000 $440,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $8,000.000 $1,480.000 $7,500.000 $4,000.000 $5,360.000 $1,000.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 32.000 $150.000 $102.000 $50.000 $22.000 $64.930 $15.000
CONSTRUCTION EXITS (REMOVE)
SY 32.000 $10.000 $33.000 $10.000 $12.000 $12.570 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 810.000 $5.000 $2.600 $4.000 $3.000 $4.690 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 810.000 $2.000 $0.400 $1.000 $2.000 $1.340 $5.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 220.000 $10.000 $6.700 $7.000 $5.000 $5.700 $25.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 220.000 $2.000 $2.000 $1.000 $1.500 $1.340 $5.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 100.000 $10.000 $61.000 $100.000 $45.000 $79.060 $100.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 40.000 $25.000 $61.000 $100.000 $45.000 $79.060 $30.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 100.000 $8.000 $61.000 $25.000 $25.000 $79.060 $100.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 40.000 $10.000 $61.000 $25.000 $25.000 $79.060 $30.000
CONCRETE CURB (SPECIAL)
LF 20.000 $25.000 $111.300 $50.000 $65.000 $113.900 $345.000
CONC SIDEWALKS (5")
SY 22.000 $100.000 $136.000 $100.000 $90.000 $121.840 $375.000
WIRE FENCE (TY C)
LF 920.000 $10.000 $8.700 $20.000 $30.000 $21.860 $25.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 400.000 $4.000 $6.000 $5.000 $2.000 $8.380 $25.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $12,800.000 $15,000.000 $10,000.000 $12,864.000 $25,000.000
TMA (STATIONARY)
DAY 10.000 $200.000 $533.000 $1,000.000 $300.000 $603.000 $820.000
PUMP STATION UPGRADES
LS 1.000 $300,000.000 $236,614.000 $250,000.000 $250,000.000 $587,551.140 $460,000.000
Totals: $1,133,460.000 $1,042,468.000 $1,312,635.000 $1,610,913.000 $1,847,315.320 $2,024,338.000