CAMP US 271 (0248-02-072)

Items: 76

County: CAMP
Length: 2.6300 MILES
Highway: US 271
District: ATLANTA
Control Number: 0248-02-072
DBE Goal: 0.0%
Project: F 2026(205)
Guaranty: $100,000.00
Time: 92 WORKING DAYS
Engineer's Estimate: $6,281,876.84
Date: 01/06/2026 (5 months ago)
Contract Number: 1263010
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00196217
Contract Type: Federal
Project Description: REHABILITATE EXISTING 4-LANE ROADWAY
Mail/Deliver Bids To: N/A
WENDY STARKES
OSCAR FLORES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$6,281,876.84
1
$5,003,036.98
Over/Under Est: -20.36% -$1,278,839.86
Over/Under Est: -2.27% -$142,299.65
Amt Left: 22.72% $1,136,540.21
Over/Under Est: 4.03% $252,900.86
Amt Left: 30.62% $1,531,740.72
Delta: -6.44% -$395,200.51
Subcontractor Percentage Amount
TEXOP CONSTRUCTION 10.51% $525,819.19
BAHENA CONSTRUCTION CO., INC. 2.46% $123,074.71
STRIPING TECHNOLOGY, L.P. 2.23% $111,567.72
WITHERS CONSTRUCTION, LLC 1.50% $75,045.55
SOUTHWEST ENVIRONMENT SERVICES LLC 1.29% $64,539.18
DUSTIN ALLEN, INC. 0.64% $32,019.44
J. H. ODEN CONTRACTING COMPANY 0.33% $16,510.02
PANOLA SIGN & BARRICADE, INC. 0.26% $13,007.90
WEST TEXAS RUMBLE STRIP LLC 0.15% $7,504.56
Total: 19.37% $969,088.27

Bid Items & Bid Tabulations

76 Total 0 of 76
CAMP  |  US 271  |  ATLANTA  |  0248-02-072  |  01/06/2026  |  $6,281,876.84  |  F 2026(205)  |  REHAB EXIST ROADWAY  |  92 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
EAST TEXAS BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
PREPARING ROW
STA 36.350 $1,500.000 $2,111.500 $3,500.000 $5,000.000
REMOV CONC (MOWSTRIP)
LF 175.000 $21.500 $22.530 $15.000 $18.000
REMOV CONC (RIPRAP)
SY 71.000 $25.000 $15.450 $30.000 $22.000
REMOV CONC (DRIVEWAYS)
SY 268.000 $25.000 $15.450 $30.000 $17.500
EMBANK (VEH)(OC)(TY C)
CY 90.000 $25.000 $89.950 $50.000 $60.000
BACKFILL (TY B)
STA 98.800 $100.000 $127.080 $300.000 $195.000
BLADING
STA 2.500 $100.000 $344.920 $400.000 $550.000
BROADCAST SEED (TEMP_WARM)
SY 12,703.000 $1.500 $0.100 $0.110 $0.130
BROADCAST SEED (TEMP_COOL)
SY 12,703.000 $0.630 $0.100 $0.110 $0.130
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 25,406.000 $0.660 $0.560 $0.600 $0.600
VEGETATIVE WATERING
TGL 406.490 $0.220 $34.820 $20.000 $13.500
SP MIXES SP-C PG70-22
TON 13,408.000 $140.000 $116.900 $151.000 $150.000
SP MIXES SP-D SAC-A PG76-22
TON 12,909.000 $160.000 $119.590 $154.000 $152.000
TACK COAT
GAL 28,709.000 $3.000 $4.690 $4.750 $4.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 8,875.000 $60.000 $33.040 $50.000 $70.000
PLANE ASPH CONC PAV(2")
SY 9,818.000 $3.250 $3.070 $3.500 $3.750
PLANE ASPH CONC PAV(4")
SY 114,710.000 $2.000 $4.010 $3.850 $3.500
CUT & RESTORE ASPH PAVING
SY 42.000 $300.000 $103.000 $75.000 $75.000
RIPRAP (MOW STRIP)(4 IN)
CY 59.000 $850.000 $772.500 $675.000 $615.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 71.000 $260.000 $220.420 $225.000 $195.000
BEDDING MATERIAL (6 IN)
CY 24.000 $200.000 $220.420 $225.000 $195.000
RC PIPE (CL III)(18 IN)
LF 242.000 $60.000 $61.800 $65.000 $60.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 10.000 $930.000 $927.000 $950.000 $1,200.000
REMOV STR (PIPE)
LF 192.000 $20.000 $12.360 $15.000 $10.000
MOBILIZATION
LS 1.000 $580,000.000 $150,091.100 $300,000.000 $625,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $4,000.000 $14,841.550 $7,000.000 $6,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $5,211.320 $10,000.000 $20,000.000
TMA (STATIONARY)
DAY 62.000 $185.000 $422.560 $250.000 $250.000
TMA (MOBILE OPERATION)
DAY 30.000 $150.000 $778.440 $300.000 $325.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 75.000 $4.000 $5.150 $5.500 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 75.000 $1.000 $1.030 $1.000 $2.500
DRIVEWAYS (CONC)
SY 268.000 $125.000 $128.750 $115.000 $90.000
TURNOUTS (ACP)
SY 24.000 $160.000 $443.680 $95.000 $210.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 17,025.000 $0.280 $0.460 $0.700 $0.700
MTL W-BEAM GD FEN (TIM POST)
LF 562.500 $24.000 $20.600 $23.000 $24.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,500.000 $1,107.250 $1,400.000 $1,400.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $600.000 $1,121.670 $1,200.000 $1,220.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 2.000 $900.000 $772.500 $715.000 $720.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $4.000 $2.060 $2.750 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $100.000 $206.000 $220.000 $220.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $2,945.800 $3,200.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $212.000 $206.000 $220.000 $220.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 30.000 $307.000 $323.420 $345.000 $365.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 1.000 $343.000 $372.860 $400.000 $390.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $722.000 $871.380 $930.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $1,200.000 $694.220 $750.000 $875.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $1,100.000 $875.500 $935.000 $985.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 7.000 $1,030.000 $915.670 $980.000 $715.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 3.000 $1,000.000 $1,009.400 $1,080.000 $1,120.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,060.000 $1,163.900 $1,250.000 $1,310.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 49.000 $750.000 $479.980 $515.000 $645.000
REMOVE SM RD SN SUP&AM
EA 75.000 $125.000 $104.030 $105.000 $125.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 14.000 $27.000 $29.360 $30.000 $28.000
REPLC DEL ASSM (D-DY)SZ 1(YFLX)SRFHH
EA 30.000 $150.000 $281.190 $255.000 $260.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 7,885.000 $0.450 $0.210 $0.220 $0.250
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 31,541.000 $0.280 $0.210 $0.220 $0.250
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 6,378.000 $0.400 $0.210 $0.220 $0.250
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 31,541.000 $0.280 $0.210 $0.220 $0.250
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 7,885.000 $2.250 $2.260 $1.500 $0.550
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 31,541.000 $2.250 $2.190 $1.500 $0.450
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 6,378.000 $1.500 $2.260 $1.500 $0.550
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 31,541.000 $2.500 $2.190 $1.500 $0.450
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 32,001.000 $2.500 $0.770 $0.820 $0.850
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 7,969.000 $1.250 $0.770 $0.820 $0.850
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 32,241.000 $2.500 $0.770 $0.820 $0.850
ALL-WTHER PM TY I (Y)6"(BRK)(100MIL)
LF 6,378.000 $1.300 $0.770 $0.820 $0.850
ALL-WTHER PM TY I (W) 8"(SLD)(100MIL)
LF 3,175.000 $2.500 $1.240 $1.300 $1.350
PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE)
LF 130.000 $3.500 $10.300 $11.000 $11.000
PREFAB PM TY C (W)(24")(SLD)
LF 814.000 $15.000 $12.720 $13.500 $13.750
PREFAB PM TY C (W)(ARROW)
EA 38.000 $225.000 $221.450 $240.000 $235.000
PREFAB PM TY C (W)(WORD)
EA 12.000 $250.000 $262.650 $280.000 $280.000
PREFAB PM TY C (W)(RR XING)
EA 4.000 $700.000 $721.000 $770.000 $550.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 6.000 $100.000 $77.250 $82.500 $85.000
PREFAB PM TY C (Y)(24")(SLD)
LF 120.000 $11.300 $12.720 $13.500 $13.750
REFL PAV MRKR TY I-C
EA 394.000 $6.500 $5.670 $6.000 $6.000
REFL PAV MRKR TY II-A-A
EA 803.000 $7.500 $5.150 $5.500 $5.500
Totals: $6,281,876.838 $5,003,036.981 $6,139,577.190 $6,534,777.695