Show Job Controls
Bid Cobra

CAMERON FM 2556 (2529-02-010)

Items: 65

County: CAMERON
Length: N/A
Highway: FM 2556
District: PHARR
Control Number: 2529-02-010
DBE Goal: 700.0%
Project: STP 2B24(212)HES
Guaranty: N/A
Time: 225 WORKING DAYS
Engineer's Estimate: $8,651,632.20
Date: 07/09/2024 (1 year ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
ANDRES ESPINOZA
GABRIEL VILLARREAL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$8,651,632.20
$7,945,428.50
Over/Under Est: -8.16% -$706,203.70
$8,822,513.80
Over/Under Est: 1.98% $170,881.60
Amt Left: 11.04% $877,085.30
Subcontractor Percentage Amount
RIO GRANDE REBAR RODBUSTERS, LLC 4.13% $328,146.20
AARON CONCRETE CONTRACTORS, LLC 2.88% $228,828.34
SOIL TECH ADVANCE INC. 1.27% $100,906.94
DEPENDABLE FENCE 0.77% $61,179.80
HIGHWAY BARRICADES AND SERVICES, LLC 0.44% $34,959.89
TEXAS HIGHWAY SYSTEMS, INC. 0.28% $22,247.20
SK CONCRETE SERVICES LLC 0.16% $12,712.69
Total: 9.93% $788,981.06

Bid Items & Bid Tabulations

65 Total 0 of 65
CAMERON  |  FM 2556  |  PHARR  |  2529-02-010  |  07/09/2024  |  $8,651,632.20  |  STP 2B24(212)HES  |  HAZARD ELIM & SAFETY  |  225 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
IOC COMPANY, LLC
PREPARING ROW
STA 39.000 $2,600.000 $7,250.000 $7,300.000
REMOVING CONC (APPR SLAB)
SY 164.000 $60.000 $50.000 $35.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 11,330.000 $13.000 $3.750 $3.000
OBLITERATING ABANDONED ROAD
STA 22.000 $2,500.000 $150.000 $100.000
EXCAVATION (ROADWAY)
CY 2,327.000 $12.000 $16.000 $5.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 18,438.000 $15.000 $19.000 $22.500
FURNISHING AND PLACING TOPSOIL (4")
SY 38,491.000 $3.000 $4.000 $1.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 36,570.000 $0.500 $0.400 $0.390
FERTILIZER
TON 1.800 $1,200.000 $750.000 $1,000.000
VEGETATIVE WATERING
MG 615.000 $65.000 $60.000 $35.000
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
CY 2,799.000 $75.000 $45.000 $61.000
LIME TRT (EXST MATL) (12")
SY 12,200.000 $5.000 $6.000 $3.250
LIME (HYD, COM, OR QK(SLURRY))
TON 302.000 $350.000 $320.000 $200.000
CEMENT
TON 91.000 $250.000 $190.000 $215.000
CEMENT TREAT (NEW BASE) (8")
SY 12,110.000 $5.500 $3.500 $3.000
PRIME COAT (MC-30)
GAL 2,474.000 $6.500 $6.000 $5.000
CEM STABIL BKFL
CY 224.000 $120.000 $150.000 $100.000
TEMPORARY SPL SHORING
SF 690.000 $48.000 $1.000 $1.000
DRILL SHAFT (18 IN)
LF 122.000 $160.000 $245.000 $80.000
DRILL SHAFT (30 IN)
LF 1,134.000 $280.000 $275.000 $200.000
DRILL SHAFT (36 IN)
LF 495.000 $320.000 $320.000 $300.000
DRILL SHAFT (42 IN)
LF 2,445.000 $425.000 $330.000 $375.000
CL C CONC (ABUT)
CY 62.600 $1,500.000 $1,700.000 $1,800.000
CL C CONC (CAP)
CY 332.200 $1,700.000 $1,400.000 $1,600.000
CL C CONC (COLUMN)
CY 207.400 $1,800.000 $1,300.000 $2,000.000
CL C CONC (FOOTING)
CY 147.000 $1,200.000 $1,100.000 $1,100.000
REINF CONC SLAB
SF 43,700.000 $27.000 $27.000 $32.500
APPROACH SLAB
CY 70.600 $800.000 $900.000 $1,000.000
PRESTR CONC GIRDER (TX40)
LF 4,296.000 $230.000 $200.000 $240.000
PRESTR CONC GIRDER (TX54)
LF 1,374.000 $230.000 $200.000 $240.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 15.000 $200.000 $220.000 $500.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 366.000 $225.000 $205.000 $350.000
RIPRAP (MOW STRIP)(4 IN)
CY 78.000 $600.000 $1,000.000 $750.000
RAIL (TY T223)
LF 1,960.000 $170.000 $145.000 $250.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 226.000 $225.000 $280.000 $250.000
RC PIPE (CL III)(72 IN)
LF 56.000 $600.000 $900.000 $700.000
RC PIPE (CL V)(18 IN)
LF 92.000 $140.000 $130.000 $150.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 3.000 $1,400.000 $1,300.000 $1,500.000
SET (TY II) (72 IN) (RCP) (4: 1) (P)
EA 1.000 $15,000.000 $25,000.000 $15,000.000
REMOV STR (HEADWALL)
EA 1.000 $1,500.000 $5,000.000 $3,000.000
REMOV STR (PIPE)
LF 25.000 $25.000 $15.000 $50.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $140,000.000 $75,000.000 $10,000.000
REMOV STR (SMALL FENCE)
LF 1,500.000 $9.000 $5.000 $5.000
MOBILIZATION
LS 1.000 $810,280.700 $690,000.000 $875,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $3,000.000 $5,100.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 120.000 $40.000 $65.000 $48.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,975.000 $4.000 $4.500 $3.000
DRIVEWAYS (ACP)
SY 80.000 $80.000 $160.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,275.000 $32.000 $26.000 $25.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $2,500.000 $2,450.000
REMOVE METAL BEAM GUARD FENCE
LF 825.000 $5.000 $5.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $250.000 $225.000 $225.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,400.000 $3,300.000 $3,265.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 16.000 $885.000 $800.000 $785.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $850.000 $900.000 $875.000
REMOVE SM RD SN SUP&AM
EA 14.000 $150.000 $200.000 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 14.000 $40.000 $35.000 $35.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 20.000 $40.000 $25.000 $25.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 7,770.000 $0.200 $0.600 $0.600
REFL PAV MRK TY II (Y) 6" (BRK)
LF 50.000 $0.250 $1.100 $1.100
REFL PAV MRK TY II (Y) 6" (SLD)
LF 7,880.000 $0.200 $0.600 $0.600
REFL PAV MRKR TY II-A-A
EA 95.000 $7.000 $7.500 $7.500
PAV SURF PREP FOR MRK (6")
LF 15,630.000 $0.700 $0.200 $0.200
D-GR HMA TY-D SAC-A PG76-22
TON 46.000 $145.000 $160.000 $300.000
SP MIXES SP-C SAC-A PG76-22
TON 1,970.000 $145.000 $160.000 $175.000
Totals: $8,651,632.200 $7,945,428.500 $8,822,513.800