PREPARING ROW
|
STA
|
399.650
|
$850.000
|
$4,600.000
|
$392.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
7.500
|
$40.000
|
$170.000
|
$100.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,314.000
|
$11.000
|
$25.000
|
$20.000
|
|
|
RMV TRT BASE & ASPH PAV (14")
|
CY
|
7,688.000
|
$3.000
|
$12.500
|
$18.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
40,593.000
|
$5.000
|
$6.000
|
$14.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
142.000
|
$15.000
|
$30.000
|
$24.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
32,089.000
|
$9.000
|
$4.750
|
$18.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
188.000
|
$26.000
|
$35.000
|
$60.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
AC
|
51.000
|
$1,300.000
|
$2,000.000
|
$1,350.000
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
AC
|
51.000
|
$825.000
|
$1,800.000
|
$1,040.000
|
|
|
VEGETATIVE WATERING
|
MG
|
6,500.000
|
$25.000
|
$29.000
|
$31.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
200.000
|
$5.000
|
$5.000
|
$3.750
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
1,328.000
|
$11.000
|
$1.000
|
$36.000
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
35,174.000
|
$42.000
|
$54.000
|
$62.000
|
|
|
RWRK BS MTL (TY B)(14")(DC)(ORG POS)
|
CY
|
21,742.000
|
$6.000
|
$8.000
|
$8.500
|
|
|
REWORK BS MTL DENS CONT (TY A)(4"-8")
|
SY
|
146,716.000
|
$4.000
|
$1.500
|
$1.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
44,237.000
|
$2.000
|
$3.250
|
$4.600
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
1,314.000
|
$140.000
|
$135.000
|
$190.000
|
|
|
CEMENT
|
TON
|
6,936.200
|
$170.000
|
$155.000
|
$185.000
|
|
|
CEMENT TREAT (EXIST MATL)(12")
|
SY
|
168,871.000
|
$2.300
|
$3.950
|
$3.250
|
|
|
CEMENT TRT (MX EXST MTL & NW BS)(10")
|
SY
|
204,983.000
|
$2.000
|
$1.900
|
$9.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (1 1/2")
|
SY
|
71,772.000
|
$2.000
|
$1.350
|
$0.750
|
|
|
SALV, HAUL & STKPL RCL APH PV (3 1/2")
|
SY
|
140,662.000
|
$3.000
|
$1.800
|
$1.800
|
|
|
PRIME COAT (MC-30)
|
GAL
|
40,259.000
|
$4.000
|
$4.000
|
$4.500
|
|
|
ASPH (TIER II)
|
GAL
|
60,388.000
|
$4.000
|
$5.250
|
$3.600
|
|
|
AGGR (TY-D GR-4P)(SAC-B)
|
CY
|
1,676.600
|
$65.000
|
$44.000
|
$76.000
|
|
|
D-GR HMA TY-D SAC-A PG76-22
|
TON
|
17,300.000
|
$100.000
|
$95.000
|
$111.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
489.000
|
$2.000
|
$9.000
|
$20.000
|
|
|
CEM STABIL BKFL
|
CY
|
668.000
|
$55.000
|
$50.000
|
$40.000
|
|
|
CUT & RESTORING PAV
|
SY
|
1,005.000
|
$110.000
|
$50.000
|
$26.000
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
818.000
|
$50.000
|
$48.000
|
$40.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,425.000
|
$4.000
|
$4.500
|
$5.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
792.000
|
$100.000
|
$125.000
|
$124.000
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
15.400
|
$2,200.000
|
$3,000.000
|
$3,000.000
|
|
|
CL C CONC (CAP)(EXTEND)
|
CY
|
8.800
|
$2,200.000
|
$4,000.000
|
$4,000.000
|
|
|
SLAB SPAN (EXTEND)
|
CY
|
72.400
|
$2,200.000
|
$1,850.000
|
$1,800.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
7,926.000
|
$18.000
|
$18.000
|
$42.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
106.000
|
$400.000
|
$485.000
|
$396.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
85.000
|
$500.000
|
$460.000
|
$392.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
228.000
|
$440.000
|
$450.000
|
$378.000
|
|
|
CONCRETE OVERLAY (2 IN)
|
SY
|
215.500
|
$30.000
|
$120.000
|
$115.000
|
|
|
RAIL (TY T223)
|
LF
|
184.000
|
$110.000
|
$185.000
|
$180.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
78.000
|
$450.000
|
$400.000
|
$380.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
272.000
|
$700.000
|
$550.000
|
$550.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)(MOD)
|
LF
|
80.000
|
$640.000
|
$500.000
|
$480.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)(MOD)
|
LF
|
198.000
|
$600.000
|
$490.000
|
$490.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
7,746.000
|
$40.000
|
$35.000
|
$33.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
487.000
|
$55.000
|
$43.000
|
$42.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
432.000
|
$65.000
|
$60.000
|
$58.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
136.000
|
$90.000
|
$78.000
|
$74.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
176.000
|
$125.000
|
$110.000
|
$110.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
2.000
|
$4,100.000
|
$3,700.000
|
$3,800.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
2.000
|
$9,000.000
|
$10,100.000
|
$8,700.000
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
4.000
|
$31,200.000
|
$16,500.000
|
$10,100.000
|
|
|
WINGWALL (FW-S) (HW=7FT) (MOD)
|
EA
|
4.000
|
$12,000.000
|
$13,500.000
|
$14,100.000
|
|
|
WINGWALL (FW-0) (HW=7FT) (MOD)
|
EA
|
2.000
|
$12,000.000
|
$14,900.000
|
$15,600.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$750.000
|
$950.000
|
$1,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$890.000
|
$1,000.000
|
$1,040.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
426.000
|
$890.000
|
$700.000
|
$840.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
2.000
|
$1,100.000
|
$1,200.000
|
$1,050.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$1,200.000
|
$1,200.000
|
$1,050.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,200.000
|
$1,400.000
|
$1,420.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,800.000
|
$1,500.000
|
$1,575.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,300.000
|
$1,500.000
|
$1,575.000
|
|
|
SET (TY I)(S=7FT)(HW=5FT)(3:1)(C)(MOD)
|
EA
|
2.000
|
$6,200.000
|
$7,800.000
|
$8,150.000
|
|
|
MILLING CONCRETE SLAB (1/2 IN)
|
SY
|
215.500
|
$10.000
|
$90.000
|
$95.000
|
|
|
SHOT BLASTING
|
SY
|
215.500
|
$9.000
|
$60.000
|
$63.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,300.000
|
$850.000
|
$470.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
7.000
|
$1,300.000
|
$850.000
|
$450.000
|
|
|
REMOV STR (PIPE)
|
LF
|
8,445.000
|
$10.000
|
$8.000
|
$8.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
64.000
|
$35.000
|
$155.000
|
$160.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
160.000
|
$20.000
|
$13.000
|
$13.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,550,000.000
|
$1,800,000.000
|
$2,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$5,500.000
|
$4,000.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
200.000
|
$32.000
|
$65.000
|
$39.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
200.000
|
$10.000
|
$25.000
|
$19.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
1,404.000
|
$10.000
|
$25.000
|
$90.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,404.000
|
$3.000
|
$12.000
|
$20.000
|
|
|
FRNT END LOADER WORK (ERSN & SEDM CONT)
|
HR
|
40.000
|
$50.000
|
$80.000
|
$100.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,250.000
|
$3.000
|
$4.000
|
$3.400
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,250.000
|
$1.000
|
$1.000
|
$0.700
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
15,170.000
|
$4.000
|
$5.000
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
15,170.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
75,670.000
|
$40.000
|
$40.000
|
$40.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
5.000
|
$5,600.000
|
$6,250.000
|
$3,500.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
2,850.000
|
$15.000
|
$35.000
|
$60.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,090.000
|
$9.000
|
$8.000
|
$13.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
2,850.000
|
$2.000
|
$13.000
|
$15.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,314.000
|
$60.000
|
$52.000
|
$54.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
15,752.000
|
$25.000
|
$40.000
|
$45.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,525.000
|
$25.000
|
$32.000
|
$21.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
4.000
|
$2,500.000
|
$2,300.000
|
$2,230.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
8.000
|
$1,500.000
|
$1,900.000
|
$990.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
450.000
|
$6.000
|
$13.000
|
$2.100
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
20.000
|
$2,800.000
|
$3,300.000
|
$2,690.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$220.000
|
$650.000
|
$290.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$1,600.000
|
$4,300.000
|
$3,150.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$600.000
|
$2,000.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
8.000
|
$22,000.000
|
$20,000.000
|
$21,300.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
2,311.000
|
$24.000
|
$21.000
|
$21.000
|
|
|
CHN LNK FNCE(PVC-COATD)(8' MESH)(INSTL)
|
LF
|
2,518.000
|
$22.500
|
$85.000
|
$88.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
160.000
|
$240.000
|
$250.000
|
$330.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
10.000
|
$250.000
|
$320.000
|
$345.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
4.000
|
$550.000
|
$820.000
|
$550.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
50.000
|
$6.000
|
$25.000
|
$26.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
150.000
|
$1.000
|
$3.000
|
$2.600
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$700.000
|
$800.000
|
$790.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
144.000
|
$29.000
|
$83.000
|
$23.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
63.000
|
$550.000
|
$410.000
|
$510.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
9.000
|
$600.000
|
$575.000
|
$760.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$700.000
|
$650.000
|
$815.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
60.000
|
$65.000
|
$50.000
|
$63.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
53.000
|
$80.000
|
$45.000
|
$68.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
43.000
|
$15.000
|
$50.000
|
$11.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
70.000
|
$30.000
|
$40.000
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
155,420.000
|
$0.400
|
$0.350
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
24.000
|
$4.000
|
$10.000
|
$11.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
163,820.000
|
$0.400
|
$0.350
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
2,034.000
|
$3.000
|
$2.000
|
$2.100
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
80.000
|
$1.000
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
12,880.000
|
$0.500
|
$0.400
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
75.000
|
$5.000
|
$5.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(DOT)
|
LF
|
80.000
|
$1.000
|
$1.000
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
6,880.000
|
$0.500
|
$0.500
|
$0.400
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
28.000
|
$0.800
|
$1.000
|
$1.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,000.000
|
$0.800
|
$1.000
|
$1.600
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
410.000
|
$0.800
|
$1.500
|
$1.300
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
449.000
|
$2.500
|
$3.000
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
245.000
|
$6.500
|
$7.000
|
$8.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
190.000
|
$3.000
|
$3.000
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
17,030.000
|
$0.400
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
9,290.000
|
$0.350
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
18,218.000
|
$0.400
|
$0.400
|
$0.400
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
63,701.000
|
$0.450
|
$0.750
|
$0.800
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
1.000
|
$200.000
|
$285.000
|
$260.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
1.000
|
$250.000
|
$330.000
|
$340.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
20.000
|
$3.000
|
$16.000
|
$16.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
776.000
|
$4.000
|
$5.000
|
$5.000
|
|
TRAFFIC BUTTON TY Y
|
EA
|
1,586.000
|
$2.000
|
$2.000
|
$2.100
|
|
TRAFFIC BUTTON TY B
|
EA
|
11,176.000
|
$1.500
|
$1.750
|
$1.800
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
44,350.000
|
$0.600
|
$0.500
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
450.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
82.000
|
$3.000
|
$8.000
|
$8.400
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$150.000
|
$250.000
|
$257.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
110.000
|
$1.900
|
$3.000
|
$3.150
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$4,000.000
|
$4,600.000
|
$4,720.000
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$1,000.000
|
$1,250.000
|
$1,260.000
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
200.000
|
$125.000
|
$90.000
|
$140.000
|
|
|
INTRLCK ART CONC BLKS (4" MIN)
|
SF
|
34,453.000
|
$17.000
|
$7.000
|
$12.000
|
|
|
RC LOW HEAD PRSSR PIPE (CL III)(36")
|
LF
|
156.000
|
$120.000
|
$100.000
|
$90.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
208,675.000
|
$1.500
|
$1.350
|
$1.220
|
|
|
OCELOT GUARD
|
EA
|
2.000
|
$28,500.000
|
$45,000.000
|
$41,700.000
|
|
|
BIRD EXCLUSION METHOD
|
SF
|
3,680.000
|
$4.200
|
$6.500
|
$9.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$7,500.000
|
$30,300.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$13,275.000
|
$7,500.000
|
$48,500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
25.000
|
$189.000
|
$200.000
|
$240.000
|
|
Totals: |
$18,147,673.350
|
$19,989,898.050
|
$22,274,111.150
|