Show Job Controls
Bid Cobra

CAMERON FM 510 (1057-03-045)

Items: 97

County: CAMERON
Length: N/A
Highway: FM 510
District: PHARR
Control Number: 1057-03-045
DBE Goal: N/A
Project: STP 2B23(055)
Guaranty: N/A
Time: 347 WORKING DAYS
Engineer's Estimate: $14,086,164.15
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
ANDRES ESPINOZA
GABRIEL VILLARREAL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$14,086,164.15
$15,675,730.80
Over/Under Est: 11.28% $1,589,566.65
$17,112,917.50
Over/Under Est: 21.49% $3,026,753.35
Amt Left: 9.17% $1,437,186.70
Over/Under Est: 27.25% $3,839,120.07
Amt Left: 14.35% $2,249,553.42
Delta: -4.75% -$812,366.72
$20,633,048.52
Over/Under Est: 46.48% $6,546,884.37
Amt Left: 31.62% $4,957,317.72
Delta: -15.11% -$2,707,764.30
Subcontractor Percentage Amount
HIGHWAY BARRICADES AND SERVICES, LLC 2.46% $395,949.31
SOIL TECH ADVANCE INC. 2.46% $395,949.31
LAREDO STRIPING, INC. 2.02% $325,129.11
TEXAS HIGHWAY SYSTEMS, INC. 0.47% $75,648.85
RIO GRANDE REBAR RODBUSTERS, LLC 0.01% $1,609.55
SOIL-TECH, INC. 0.00% $0.00
Total: 7.42% $1,194,286.13

Bid Items & Bid Tabulations

97 Total 0 of 97
CAMERON  |  FM 510  |  PHARR  |  1057-03-045  |  08/03/2023  |  $14,086,164.15  |  STP 2B23(055)  |  REHAB EXIST ROADWAY  |  347 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
REIM CONSTRUCTION, INC.
TEXAS CORDIA CONSTRUCTION, LLC
IOC COMPANY, LLC
PREPARING ROW
STA 403.000 $2,000.000 $2,735.000 $1,110.000 $1,450.000 $2,500.000
REMOVING CONC (PAV)
SY 31,754.000 $4.000 $4.000 $7.400 $10.000 $15.000
REMOVING CONC (RIPRAP)
SY 812.000 $8.440 $12.000 $12.500 $8.000 $15.000
REMOVING STAB BASE & ASPH PAV (12"-14")
SY 147,117.000 $2.730 $3.500 $5.400 $5.000 $8.000
EXCAVATION (ROADWAY)
CY 8,410.000 $4.220 $7.000 $6.800 $9.000 $8.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 8,216.000 $4.670 $4.000 $6.050 $12.000 $5.000
BACKFILL (TY A)
STA 403.000 $196.500 $125.000 $325.000 $320.000 $275.000
BROADCAST SEED (TEMP) (WARM)
SY 169,219.000 $0.120 $0.350 $0.250 $0.400 $0.350
BROADCAST SEED (TEMP) (COOL)
SY 169,219.000 $0.120 $0.350 $0.250 $0.400 $0.350
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 34.110 $607.320 $1,400.000 $2,500.000 $1,400.000 $1,400.000
VEGETATIVE WATERING
MG 24.400 $30.130 $100.000 $38.000 $115.000 $180.000
SPRINKLING (DUST CONTROL)
MG 403.000 $2.490 $1.000 $33.750 $27.000 $1.000
PROOF ROLLING
HR 15.120 $50.380 $80.000 $61.500 $61.000 $50.000
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 65,573.000 $26.000 $44.500 $48.500 $50.000 $60.000
LIME TRT (EXST MATL) (12")
SY 198,674.000 $3.000 $2.250 $2.200 $3.000 $2.000
LIME (HYD, COM OR QK)(SLURRY)
TON 5,893.000 $202.710 $260.000 $340.000 $300.000 $225.000
CEMENT
TON 2,473.000 $198.180 $190.000 $229.000 $200.000 $200.000
CEMENT TREAT (NEW BASE)(12")
SY 196,691.000 $3.500 $2.000 $2.800 $3.000 $3.750
ASPH (TIER II)
GAL 55,704.000 $4.170 $6.000 $4.150 $5.000 $5.350
AGGR (TY-D GR-4P)(SAC-B)
CY 1,560.000 $63.820 $65.000 $102.000 $130.000 $145.000
PLANE ASPH CONC PAV(0" TO 2")
SY 370.000 $1.510 $18.000 $5.950 $7.000 $5.000
PLANE ASPH CONC PAV (1.5")
SY 457.000 $1.350 $18.000 $7.000 $6.000 $5.000
FLOWABLE BACKFILL
CY 1,749.000 $132.990 $240.000 $171.000 $180.000 $225.000
RIPRAP (CONC)(5 IN)
CY 157.000 $340.470 $1,000.000 $429.000 $560.000 $625.000
RIPRAP (MOW STRIP)(5 IN)
CY 135.000 $327.620 $750.000 $414.000 $600.000 $700.000
RAIL (TY SSTR)
LF 190.000 $145.000 $250.000 $146.000 $270.000 $200.000
RETROFIT RAIL (TY SSTR)
LF 134.000 $168.680 $315.000 $237.000 $360.000 $200.000
CONC BOX CULV (8 FT X 5 FT)
LF 98.000 $900.000 $1,600.000 $1,460.000 $1,820.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 686.000 $38.470 $92.000 $78.000 $91.000 $150.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 38.000 $953.610 $1,400.000 $1,130.000 $1,300.000 $1,250.000
CLEAN EXIST CULVERTS
EA 21.000 $1,558.820 $7,000.000 $3,270.000 $6,000.000 $1,000.000
REMOV STR (SET)
EA 11.000 $236.480 $500.000 $374.000 $360.000 $600.000
REMOV STR (PIPE)
LF 546.000 $6.060 $20.000 $14.750 $11.000 $10.000
REMOVE STR (RAIL)
LF 209.000 $24.560 $20.000 $27.500 $290.000 $15.000
MOBILIZATION
LS 1.000 $1,250,000.000 $950,000.000 $900,000.000 $1,085,000.000 $2,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $2,602.370 $5,000.000 $4,330.000 $8,000.000 $3,750.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $26.490 $48.000 $24.500 $18.000 $33.610
CONSTRUCTION EXITS (REMOVE)
SY 446.000 $8.070 $12.000 $7.500 $9.000 $14.660
TEMP SEDMT CONT FENCE (INSTALL)
LF 430.000 $3.350 $4.000 $3.500 $5.000 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 430.000 $1.300 $1.000 $1.050 $2.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 30,195.000 $4.050 $4.000 $3.350 $5.000 $5.350
BIODEG EROSN CONT LOGS (REMOVE)
LF 30,195.000 $0.930 $1.000 $1.000 $1.000 $1.300
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 570.000 $65.000 $20.000 $16.750 $42.000 $75.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,165.000 $5.000 $10.000 $4.550 $25.000 $10.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 570.000 $10.000 $10.000 $14.250 $27.000 $15.000
CONCRETE CURB (SPECIAL)
LF 214.000 $15.110 $50.000 $55.500 $49.000 $75.000
DRIVEWAYS (ACP)
SY 12,472.000 $45.130 $30.000 $35.250 $31.000 $67.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,175.000 $33.500 $36.000 $38.250 $33.000 $32.550
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,104.800 $2,800.000 $2,750.000 $2,350.000 $2,345.000
REMOVE METAL BEAM GUARD FENCE
LF 1,050.000 $2.090 $2.500 $6.900 $3.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $195.210 $200.000 $331.000 $230.000 $225.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $222.770 $200.000 $264.000 $230.000 $225.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $3,299.490 $3,600.000 $4,160.000 $3,550.000 $3,545.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $248.980 $200.000 $323.000 $280.000 $275.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,044.880 $3,100.000 $1,500.000 $1,100.000 $1,100.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $806.240 $1,525.000 $847.000 $930.000 $925.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $10,900.000 $10,100.000 $8,630.000 $8,625.000
CRASH CUSHION ATTEN (INSTALL) (QUAD)(N)
EA 1.000 $38,255.500 $31,500.000 $30,900.000 $26,280.000 $26,275.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $317.000 $625.000 $646.000 $760.000 $1,141.080
MAILBOX INSTALL-S (WC-POST) TY 3
EA 134.000 $220.770 $260.000 $217.000 $440.000 $185.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 5.000 $254.640 $300.000 $247.000 $430.000 $521.890
ALUMINUM SIGNS (TY A)
SF 136.000 $26.500 $40.000 $28.750 $45.000 $22.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 12.000 $651.280 $725.000 $763.000 $900.000 $650.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 78.000 $700.000 $780.000 $781.000 $890.000 $665.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 18.000 $925.160 $825.000 $969.000 $1,070.000 $825.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $1,114.950 $1,000.000 $1,140.000 $1,140.000 $975.000
REMOVE SM RD SN SUP&AM
EA 88.000 $108.420 $80.000 $100.000 $100.000 $70.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 15.000 $25.420 $10.000 $21.250 $10.000 $18.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 22.000 $49.500 $30.000 $71.500 $100.000 $85.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 19.000 $100.000 $50.000 $75.000 $100.000 $85.000
INS DEL ASSM(D-SW)SZ 1(WFLX)GF2(BI)
EA 32.000 $150.000 $55.000 $45.250 $100.000 $35.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 81,000.000 $0.560 $0.300 $0.300 $0.300 $0.280
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 81,000.000 $0.370 $0.300 $0.300 $0.300 $0.280
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,050.000 $0.870 $1.000 $1.900 $3.000 $1.540
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,050.000 $0.190 $1.000 $2.000 $3.000 $1.670
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 602.000 $1.150 $1.000 $1.050 $0.900 $0.900
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 567.000 $6.860 $9.000 $10.500 $9.000 $9.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,364.000 $3.220 $9.000 $10.500 $9.000 $9.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 79,405.000 $0.280 $0.650 $0.700 $0.600 $0.620
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 7,880.000 $0.350 $0.650 $0.700 $0.600 $0.620
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 24,466.000 $0.340 $0.650 $0.700 $0.600 $0.620
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 79,405.000 $0.500 $0.750 $0.900 $0.700 $0.800
PREFAB PAV MRK TY C (W) (ARROW)
EA 5.000 $227.870 $200.000 $235.000 $200.000 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 5.000 $253.540 $275.000 $323.000 $280.000 $275.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $598.330 $500.000 $587.000 $500.000 $500.000
REFL PAV MRKR TY I-C
EA 951.000 $3.420 $4.000 $4.500 $4.000 $3.850
REFL PAV MRKR TY II-A-A
EA 960.000 $3.120 $4.000 $4.500 $4.000 $3.850
TREE TRIMMING / BRUSH REMOVAL
MI 1.000 $8,315.640 $5,000.000 $4,240.000 $5,000.000 $5,000.000
TREE REMOVAL (12" - 18" DIA)
EA 12.000 $1,275.260 $1,500.000 $969.000 $1,500.000 $330.070
DITCH CLEANING AND RESHAPING (FOOT)
LF 80,872.000 $5.000 $1.000 $1.600 $6.000 $6.000
SP MIXES SP-D SAC-A PG76-22
TON 31,199.000 $114.240 $114.000 $138.000 $130.000 $137.750
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 39.070 $122.790 $200.000 $231.000 $240.000 $250.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 198,674.000 $1.430 $1.000 $1.150 $2.000 $2.250
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $4,859.880 $5,000.000 $16,300.000 $8,000.000 $20,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 39,150.000 $0.180 $3.070 $5.850 $0.500 $5.500
TMA (STATIONARY)
DAY 347.000 $250.000 $25.000 $294.000 $25.000 $1.000
TMA (MOBILE OPERATION)
HR 200.000 $25.000 $0.010 $129.000 $25.000 $10.000
Totals: $14,086,164.148 $15,675,730.800 $17,112,917.500 $17,925,284.220 $20,633,048.520