Show Job Controls
Bid Cobra

CAMERON S MINNESOTA AVE (0921-06-342)

Items: 77

County: CAMERON
Length: 0.0000 MILES
Highway: S MINNESOTA AVE
District: PHARR
Control Number: 0921-06-342
DBE Goal: 5.0%
Project: BR 2024(819)
Guaranty: $43,000.00
Time: 136 WORKING DAYS
Engineer's Estimate: $1,837,309.84
Date: 08/07/2025 (10 months ago)
Contract Number: 8253017
Type: BRIDGE REPLACEMENT
Project ID: A00135286
Contract Type: Federal
Project Description: REPLACE BRIDGE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ANDRES ESPINOZA
GABRIEL VILLARREAL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,837,309.84
$1,646,412.80
Over/Under Est: -10.39% -$190,897.04
$2,088,200.87
Over/Under Est: 13.66% $250,891.03
Amt Left: 26.83% $441,788.07
$2,179,170.40
Over/Under Est: 18.61% $341,860.56
Amt Left: 32.36% $532,757.60
Delta: -4.36% -$90,969.53
$3,229,538.50
Over/Under Est: 75.78% $1,392,228.66
Amt Left: 96.16% $1,583,125.70
Delta: -48.20% -$1,050,368.10
Subcontractor Percentage Amount
SKYLINE BRIDGE LLC 12.28% $202,179.49
BEAIRD DRILLING SERVICES, INC. 10.45% $172,050.14
G&S DIRECTIONAL DRILLING, LLC 1.22% $20,086.24
TEXAS HIGHWAY SYSTEMS, INC. 0.77% $12,677.38
Total: 24.72% $406,993.25

Bid Items & Bid Tabulations

77 Total 0 of 77
CAMERON  |  S MINNESOTA AVE  |  PHARR  |  0921-06-342  |  08/07/2025  |  $1,837,309.84  |  BR 2024(819)  |  BRIDGE REPL  |  136 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LUCANIA CONTRACTORS LLC
FOREMOST PAVING, INC.
IOC COMPANY, LLC
3LW CIVIL LLC
PREPARING ROW
STA 6.830 $3,000.000 $2,000.000 $14,000.000 $15,000.000 $5,364.130
REMOV CONC (MISC)
SY 9.000 $60.000 $90.000 $162.800 $200.000 $200.000
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
SY 1,844.000 $30.000 $16.000 $10.400 $15.000 $32.810
EXCAV (ROADWAY)
CY 344.700 $18.000 $13.000 $55.300 $25.000 $51.250
EXCAV (CHANNEL)
CY 522.000 $28.000 $25.000 $33.000 $25.000 $58.130
EMBANK (FNL)(DC)(TY C)
CY 424.600 $30.000 $20.000 $41.600 $40.000 $166.880
FURN & PLACE TOPSOIL (4")
SY 2,311.000 $5.000 $8.000 $7.000 $4.000 $20.260
DRILL SEED (PERM_RURAL_SAND)
SY 2,311.000 $1.000 $1.500 $2.000 $1.750 $1.350
DRILL SEED (TEMP_WARM_COOL)
SY 2,311.000 $1.000 $1.500 $1.500 $1.350 $1.360
VEGETATIVE WATERING
TGL 42.000 $35.000 $30.000 $107.300 $80.000 $82.810
FL BS (CMP IN PLC)(TY E GR 4) (10")
SY 2,021.000 $40.000 $25.000 $16.300 $15.000 $43.130
GEOGRID BASE REINFORCEMENT (TYPE 2)
SY 2,143.000 $1.500 $2.500 $3.700 $5.000 $5.000
LIME (COMMERCIAL LIME SLURRY)
TON 29.000 $400.000 $381.000 $403.400 $400.000 $10.940
LIME TRT (EXIST MATL)(12")
SY 2,143.000 $10.000 $10.000 $20.000 $15.000 $200.000
CM TRT(PT MX)(CL M)(TY E)(GR 4)(FN POS)
CY 561.000 $200.000 $190.000 $55.600 $300.000 $312.500
AGGR(TY-D GR-4 SAC-B)MATL & HAUL
CY 16.000 $300.000 $500.000 $101.500 $750.000 $1,168.750
PRIME COAT (MC-30)
GAL 387.000 $10.000 $10.000 $10.700 $10.000 $18.750
ASPH (TIER II)
GAL 618.000 $7.000 $10.000 $39.200 $10.000 $17.500
D-GR HMA TY-D SAC-A PG64-22
TON 308.000 $250.000 $200.000 $197.500 $300.000 $250.000
CEM STABIL BKFL
CY 34.000 $260.000 $200.000 $220.000 $150.000 $355.270
FLOWABLE BACKFILL
CY 9.000 $530.000 $300.000 $220.000 $600.000 $621.420
TRENCH EXCAVATION PROTECTION
LF 168.000 $11.500 $8.000 $1.100 $5.000 $23.650
DRILL SHAFT (24 IN)
LF 940.000 $270.000 $260.000 $275.000 $219.810 $289.540
CL C CONC (ABUT)
CY 26.800 $1,430.000 $1,500.000 $3,300.000 $2,200.000 $1,373.420
CL C CONC (CAP)
CY 18.000 $1,800.000 $3,200.000 $4,400.000 $3,650.000 $2,156.190
CL C CONC (COLUMN)
CY 6.700 $1,700.000 $3,000.000 $6,600.000 $3,900.000 $1,499.310
REINF CONC SLAB (SLAB BEAM)
SF 3,600.000 $29.000 $25.000 $27.500 $31.000 $21.410
PRESTR CONC SLAB BEAM (5SB15)
LF 689.500 $290.000 $275.000 $311.300 $245.000 $215.970
RIPRAP (MOW STRIP)(4 IN)
CY 7.000 $1,200.000 $700.000 $1,100.000 $1,500.000 $787.980
RIPRAP (STONE PROTECTION)(18 IN)
CY 513.500 $180.000 $200.000 $220.000 $325.000 $421.130
RAIL (TY T223)
LF 224.000 $185.000 $250.000 $330.000 $300.000 $244.410
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 66.000 $150.000 $200.000 $264.000 $200.000 $266.610
RC PIPE (CL III)(18 IN)
LF 6.000 $110.000 $185.000 $132.000 $650.000 $322.410
RC PIPE (CL III)(24 IN)
LF 158.000 $140.000 $100.000 $165.000 $220.000 $300.880
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $8,000.000 $6,000.000 $8,800.000 $6,000.000 $7,085.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $7,900.000 $6,800.000 $9,790.000 $6,500.000 $9,500.190
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
EA 1.000 $9,775.000 $6,100.000 $10,010.000 $6,000.000 $10,341.690
INLET (COMPL)(DROP)
EA 1.000 $7,500.000 $5,800.000 $8,250.000 $6,000.000 $8,784.730
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 2.000 $8,000.000 $10,000.000 $7,700.000 $20,000.000 $4,417.270
JACK BOR OR TUN PIPE(24 IN)(RC)(CL IV)
LF 48.000 $1,925.000 $1,500.000 $385.000 $975.000 $2,599.160
REMOV STR (INLET)
EA 1.000 $1,850.000 $580.000 $770.000 $2,500.000 $3,201.920
REMOV STR (HEADWALL)
EA 1.000 $2,300.000 $580.000 $770.000 $2,500.000 $3,201.920
REMOV STR (PIPE)
LF 66.000 $24.500 $10.000 $33.000 $50.000 $87.730
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $48,000.000 $40,000.000 $88,000.000 $50,000.000 $62,860.620
MOBILIZATION
LS 1.000 $164,209.990 $70,000.000 $200,000.000 $240,000.000 $353,036.810
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $4,000.000 $3,700.000 $5,396.900 $3,491.250 $4,091.720
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $13,000.000 $7,000.000 $10,461.100 $20,005.700 $10,148.440
TMA (STATIONARY)
DAY 18.000 $200.000 $1.000 $355.700 $229.730 $218.750
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 111.000 $22.000 $30.000 $34.000 $50.000 $207.790
CONSTRUCTION EXITS (REMOVE)
SY 111.000 $8.000 $10.000 $18.100 $25.000 $19.040
CONSTRUCTION PERIMETER FENCE
LF 340.000 $5.000 $35.000 $22.000 $6.940 $5.030
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,163.000 $4.500 $4.000 $5.100 $4.600 $1.450
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,163.000 $1.500 $1.000 $2.600 $2.300 $7.080
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 365.000 $7.250 $5.000 $10.400 $9.450 $1.160
BIODEG EROSN CONT LOGS (REMOVE)
LF 365.000 $3.000 $1.500 $2.700 $2.450 $562.500
DRIVEWAYS (ACP)
SY 29.000 $325.000 $85.000 $298.800 $325.000 $268.750
DRIVEWAYS (BASE)
SY 58.000 $27.500 $40.000 $70.300 $150.000 $67.830
MTL W-BEAM GD FEN (TIM POST)
LF 12.500 $50.000 $50.000 $57.500 $42.220 $2,256.220
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $1,800.000 $1,700.000 $4,240.500 $1,881.230 $59,728.160
TL-2 31" SHORT RADIUS (COMPLETE)
EA 1.000 $2,000.000 $21,600.000 $24,557.500 $19,881.230 $3,384.160
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,900.000 $4,300.000 $4,251.500 $3,922.800 $63,917.460
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
EA 3.000 $20,000.000 $22,750.000 $29,535.000 $21,869.350 $409.410
CHAIN LINK FENCE (INSTALL) (6')
LF 20.000 $40.000 $75.000 $110.000 $200.000 $39.340
CHAIN LINK FENCE (REMOVE)
LF 20.000 $30.000 $10.000 $55.000 $64.130 $1,875.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $875.000 $950.000 $863.500 $690.000 $2,625.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $930.000 $950.000 $1,017.500 $1,000.000 $2,125.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $890.000 $320.000 $935.000 $850.000 $687.500
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $940.000 $500.000 $467.500 $670.000 $187.500
REMOVE SM RD SN SUP&AM
EA 13.000 $200.000 $200.000 $203.500 $95.000 $156.250
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 9.000 $36.000 $50.000 $137.500 $62.000 $56.250
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 10.000 $35.000 $50.000 $137.500 $24.500 $93.750
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 12.000 $18.000 $18.000 $82.500 $75.000 $2.810
PAVEMENT SLER 6"
LF 560.000 $2.000 $1.500 $2.500 $2.250 $3.750
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 806.000 $2.350 $3.500 $3.300 $3.000 $3.750
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 20.000 $3.500 $3.500 $3.300 $3.000 $3.750
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 1,158.000 $3.300 $3.500 $3.300 $3.000 $43.750
REFL PAV MRKR TY II-A-A
EA 16.000 $16.000 $8.200 $38.500 $35.000 $11.880
Totals: $1,837,309.840 $1,646,412.800 $2,088,200.870 $2,179,170.400 $3,229,538.474
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $10,000.00