Show Job Controls
Bid Cobra

CAMERON FM 506 (0872-04-030)

Items: 135

County: CAMERON
Length: N/A
Highway: FM 506
District: PHARR
Control Number: 0872-04-030
DBE Goal: N/A
Project: C 872-4-30
Guaranty: N/A
Time: 554 WORKING DAYS
Engineer's Estimate: $15,854,781.30
Date: 09/08/2022 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
ANDRES ESPINOZA
HECTOR SILLER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$15,854,781.30
$15,785,772.44
Over/Under Est: -0.44% -$69,008.86
Over/Under Est: 6.83% $1,083,539.70
Amt Left: 7.3% $1,152,548.56
$19,995,000.00
Over/Under Est: 26.11% $4,140,218.70
Amt Left: 26.66% $4,209,227.56
Delta: -18.05% -$3,056,679.00
$20,101,450.59
Over/Under Est: 26.78% $4,246,669.29
Amt Left: 27.34% $4,315,678.15
Delta: -0.53% -$106,450.59
Subcontractor Percentage Amount
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 1.63% $264,346.02
HIGHWAY BARRICADES AND SERVICES, LLC 1.03% $167,040.74
SOIL TECH ADVANCE INC. 0.93% $150,823.19
*AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 0.08% $12,974.04
RIO GRANDE REBAR RODBUSTERS, LLC 0.05% $8,108.77
Total: 3.72% $603,292.76

Bid Items & Bid Tabulations

135 Total 0 of 135
CAMERON  |  FM 506  |  PHARR  |  0872-04-030  |  09/08/2022  |  $15,854,781.30  |  C 872-4-30  |  REHAB EXIST ROADWAY  |  554 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
TEXAS CORDIA CONSTRUCTION, LLC
POSILLICO CIVIL, INC.
IOC COMPANY, LLC
PREPARING ROW
STA 333.160 $1,600.000 $4,100.000 $1,700.000 $2,940.000 $2,000.000
REMOVING CONC (DRIVEWAYS)
SY 905.000 $33.000 $10.000 $7.000 $22.000 $15.000
REMOVING CONCRETE(MOW STRIP)
LF 3,400.000 $9.000 $4.000 $3.000 $8.000 $5.000
REMOVING STAB BASE & ASPH PAV (18")
SY 75,745.000 $9.000 $5.000 $8.000 $10.000 $10.000
REMOV STAB BASE AND ASPH PAV (22")
SY 71,255.000 $7.000 $7.000 $9.000 $11.000 $12.000
EXCAVATION (ROADWAY)
CY 37,473.000 $8.800 $3.500 $8.000 $13.000 $10.000
EXCAVATION (CHANNEL)
CY 171.000 $15.000 $30.000 $10.000 $18.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 7,524.000 $10.000 $6.000 $3.000 $9.000 $5.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 49,220.000 $0.150 $0.300 $0.500 $0.250 $0.290
DRILL SEEDING (TEMP) (WARM)
SY 49,220.000 $0.120 $0.250 $0.500 $0.250 $0.260
FERTILIZER
AC 10.150 $535.000 $600.000 $330.000 $500.000 $650.000
VEGETATIVE WATERING
MG 899.000 $60.000 $55.000 $33.000 $55.000 $60.000
PROOF ROLLING
HR 14.000 $60.000 $75.000 $61.000 $150.000 $75.000
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 50,370.000 $30.000 $36.000 $45.000 $50.000 $65.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 3,137.000 $190.000 $225.000 $272.000 $300.000 $225.000
LIME TRT (SUBGRADE)(12")
SY 105,734.000 $2.500 $3.500 $1.000 $2.000 $3.250
CEMENT
TON 1,661.000 $180.000 $197.000 $185.000 $325.000 $225.000
CEMENT TREAT (NEW BASE) (10")
SY 88,232.000 $2.000 $2.800 $1.000 $2.000 $3.000
CEMENT TREAT (NEW BASE 14")
SY 63,669.000 $2.500 $3.900 $1.000 $2.250 $3.500
ASPHALT STAB BASE (GR 4)(PG 64)
TON 1,157.000 $95.000 $119.000 $120.000 $104.000 $120.000
PRIME COAT (MC-30)
GAL 30,050.000 $5.250 $4.800 $6.000 $6.500 $5.500
ASPH (RC-250)
GAL 51,087.000 $5.250 $6.500 $6.000 $6.750 $5.500
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
CY 1,156.000 $130.000 $64.000 $120.000 $240.000 $90.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 7,190.000 $2.000 $2.850 $3.000 $4.000 $3.500
PLANE ASPH CONC PAV(0" TO 2")
SY 129.000 $1.600 $65.000 $5.000 $50.000 $10.000
CEM STABIL BKFL
CY 821.500 $80.000 $95.000 $46.000 $150.000 $135.000
CUT & RESTORE ASPH PAVING
SY 1,120.000 $92.000 $88.000 $67.000 $20.000 $140.000
STRUCT EXCAV (SPECIAL)
CY 600.000 $34.000 $75.000 $79.000 $39.000 $100.000
FLOWABLE BACKFILL
CY 210.000 $200.000 $250.000 $160.000 $218.000 $235.000
TRENCH EXCAVATION PROTECTION
LF 2,530.000 $50.000 $1.000 $5.000 $25.000 $1.000
PRESTR CONC PIL (16 IN SQ)
LF 420.000 $145.000 $300.000 $230.000 $180.000 $200.000
CL C CONC (ABUT)(EXTEND)
CY 6.100 $1,300.000 $5,000.000 $2,380.000 $2,900.000 $2,500.000
CL C CONC (CAP)(EXTEND)
CY 3.800 $2,100.000 $5,000.000 $3,440.000 $2,500.000 $4,500.000
REINF CONC SLAB (EXTEND SLAB)
SF 687.500 $26.000 $120.000 $110.000 $105.000 $75.000
RIPRAP (CONC)(CL B)
CY 10.900 $540.000 $800.000 $820.000 $900.000 $950.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 12.000 $140.000 $275.000 $310.000 $400.000 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 161.000 $500.000 $730.000 $370.000 $520.000 $500.000
RAIL (TY T223)
LF 100.000 $150.000 $200.000 $270.000 $350.000 $200.000
RETROFIT RAIL (TY SSTR)
LF 688.000 $200.000 $350.000 $240.000 $180.000 $150.000
CONC BOX CULV (8 FT X 5 FT)
LF 137.000 $575.000 $1,800.000 $870.000 $1,400.000 $500.000
RC PIPE (CL III)(15 IN)
LF 6.000 $72.000 $150.000 $180.000 $300.000 $300.000
RC PIPE (CL III)(18 IN)
LF 1,001.000 $70.000 $86.000 $53.000 $140.000 $80.000
RC PIPE (CL III)(24 IN)
LF 1,662.000 $90.000 $105.000 $65.000 $145.000 $100.000
RC PIPE (CL III)(30 IN)
LF 213.000 $110.000 $220.000 $94.000 $200.000 $140.000
RC PIPE (CL III)(36 IN)
LF 544.000 $150.000 $245.000 $130.000 $250.000 $160.000
RC PIPE (CL III)(60 IN)
LF 283.000 $360.000 $350.000 $290.000 $650.000 $300.000
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 1.000 $16,000.000 $15,000.000 $15,680.000 $16,000.000 $25,000.000
INLET (COMPL)(PSL)(RC)(3FTX3FT)
EA 2.000 $4,000.000 $8,600.000 $3,900.000 $8,000.000 $5,000.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 4.000 $4,500.000 $6,300.000 $3,480.000 $8,000.000 $5,000.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 1.000 $5,500.000 $6,500.000 $4,340.000 $8,500.000 $5,500.000
INLET (COMPL)(PSL)(FG)(8FTX8FT-3FTX3FT)
EA 3.000 $13,000.000 $16,600.000 $13,970.000 $17,000.000 $13,000.000
INLET (COMPL)(TY C)(1 GRATE)
EA 1.000 $5,800.000 $4,000.000 $3,480.000 $7,250.000 $5,000.000
INLET (COMPL) (TY C) (2 GRATE)
EA 3.000 $5,800.000 $5,000.000 $4,690.000 $9,000.000 $5,500.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $5,600.000 $13,600.000 $15,200.000 $12,500.000 $15,000.000
HEADWALL (CH - PW - 0) (DIA= 60 IN)
EA 4.000 $17,000.000 $21,000.000 $19,180.000 $22,000.000 $17,500.000
WINGWALL (PW - 2) (HW=10 FT)
EA 1.000 $40,000.000 $40,000.000 $23,230.000 $25,000.000 $30,000.000
WINGWALL (PW - 2) (HW=8 FT)
EA 1.000 $30,000.000 $36,000.000 $23,230.000 $15,000.000 $28,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 67.000 $1,500.000 $1,800.000 $1,210.000 $3,000.000 $2,000.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 16.000 $1,100.000 $2,100.000 $1,350.000 $3,000.000 $2,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,300.000 $2,100.000 $1,350.000 $5,000.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $1,800.000 $2,500.000 $1,540.000 $5,500.000 $2,000.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 4.000 $2,800.000 $4,800.000 $1,790.000 $6,200.000 $4,000.000
ADJUSTING INLET (CAP)
EA 3.000 $2,072.000 $3,800.000 $2,590.000 $600.000 $1,500.000
REMOV STR (INLET)
EA 4.000 $900.000 $800.000 $410.000 $850.000 $1,000.000
REMOV STR (SET)
EA 41.000 $400.000 $450.000 $240.000 $825.000 $350.000
REMOV STR (HEADWALL)
EA 3.000 $1,300.000 $6,100.000 $2,600.000 $2,000.000 $3,000.000
REMOV STR (PIPE)
LF 2,923.000 $15.000 $15.000 $4.000 $13.250 $10.000
REMOV STR (BOX CULVERT)
LF 30.000 $80.000 $250.000 $180.000 $100.000 $100.000
REMOVE STR (RAIL)
LF 100.000 $28.000 $100.000 $230.000 $130.000 $60.000
MOBILIZATION
LS 1.000 $1,314,000.000 $1,400,000.000 $1,221,600.000 $1,814,487.780 $2,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 33.000 $5,000.000 $5,000.000 $10,000.000 $4,000.000 $3,500.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 360.000 $58.000 $70.000 $75.000 $80.000 $72.000
ROCK FILTER DAMS (REMOVE)
LF 360.000 $10.000 $20.000 $46.000 $15.000 $21.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 1,092.000 $16.000 $20.000 $16.000 $29.000 $31.000
CONSTRUCTION EXITS (REMOVE)
SY 1,092.000 $7.000 $10.000 $7.000 $10.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,836.000 $4.500 $4.000 $3.000 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,836.000 $2.500 $1.250 $1.000 $1.000 $1.300
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 278.000 $4.600 $5.500 $7.000 $6.000 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 782.000 $1.000 $1.250 $2.000 $1.000 $1.300
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 504.000 $5.000 $5.500 $6.000 $6.000 $5.500
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 19,300.000 $45.000 $11.000 $91.000 $55.000 $55.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 1,940.000 $80.000 $15.000 $90.000 $75.000 $60.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 17,800.000 $20.000 $3.000 $10.000 $6.500 $8.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 780.000 $20.000 $9.000 $12.000 $25.000 $8.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 19,300.000 $10.000 $8.000 $15.000 $6.500 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 1,940.000 $18.000 $8.000 $15.000 $14.000 $10.000
DRIVEWAYS (CONC)
SY 878.000 $70.000 $70.000 $71.000 $60.000 $100.000
DRIVEWAYS (ACP)
SY 5,182.000 $50.000 $35.000 $32.000 $30.000 $55.000
TURNOUTS (ACP)
SY 1,107.000 $50.000 $85.000 $36.000 $30.000 $65.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,663.000 $22.500 $25.000 $26.000 $25.610 $27.490
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,100.000 $2,170.000 $2,158.170 $2,449.210
REMOVE METAL BEAM GUARD FENCE
LF 3,398.000 $2.500 $1.000 $1.000 $1.050 $2.490
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,000.000 $3,200.000 $3,340.000 $3,323.470 $3,549.210
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $350.000 $325.000 $340.000 $339.660 $349.210
CRASH CUSH ATTEN (STKPL)
EA 4.000 $900.000 $1,315.000 $1,380.000 $1,374.330 $3,049.210
CRASH CUSHION ATTEN (INSTALL) (QUAD)(N)
EA 4.000 $28,000.000 $26,000.000 $27,340.000 $27,173.010 $25,550.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 34.000 $270.000 $275.000 $340.000 $287.410 $250.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 5.000 $230.000 $315.000 $340.000 $329.210 $297.490
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 4.000 $482.000 $745.000 $670.000 $778.610 $749.210
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $900.000 $1,100.000 $1,310.000 $1,081.690 $949.210
RELOCATE SM RD SN SUP&AM TY S80
EA 18.000 $620.000 $800.000 $790.000 $825.640 $749.210
INSTL OM ASSM (OM-2Y)(WC)GND
EA 34.000 $70.000 $70.000 $68.000 $71.070 $79.210
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 32,446.000 $0.450 $0.350 $0.500 $0.320 $0.320
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 34,186.000 $0.450 $0.350 $0.500 $0.320 $0.320
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 102.000 $3.500 $3.000 $3.000 $3.000 $3.000
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 49.000 $1.000 $0.500 $0.500 $0.500 $0.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 35,477.000 $0.900 $0.500 $0.500 $0.500 $0.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 216.000 $7.500 $6.000 $6.000 $6.000 $6.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 39,218.000 $0.800 $0.500 $0.500 $0.500 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 50.000 $0.750 $1.000 $5.000 $5.000 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,494.000 $0.600 $1.000 $5.000 $1.270 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 291.000 $1.000 $1.250 $1.000 $1.200 $1.200
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 753.000 $2.250 $2.250 $2.000 $2.200 $2.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 368.000 $5.800 $8.000 $8.000 $8.000 $8.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 122.000 $3.000 $2.500 $2.000 $2.200 $2.200
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,640.000 $0.350 $0.620 $0.500 $0.600 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 24,915.000 $0.360 $0.620 $0.500 $0.600 $0.600
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 65,589.000 $0.500 $0.800 $1.000 $0.790 $0.790
PREFAB PAV MRK TY C (W) (ARROW)
EA 7.000 $210.000 $175.000 $180.000 $175.000 $175.000
PREFAB PAV MRK TY C (W) (WORD)
EA 3.000 $250.000 $255.000 $250.000 $250.000 $250.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $570.000 $550.000 $550.000 $550.000 $550.000
REFL PAV MRKR TY II-A-A
EA 924.000 $3.000 $3.000 $3.000 $3.000 $3.000
TRAFFIC BUTTON TY Y
EA 2,349.000 $2.250 $2.600 $3.000 $2.500 $2.500
TRAFFIC BUTTON TY B
EA 8,495.000 $2.000 $2.300 $2.000 $2.250 $2.250
TEMP TRAF SIGNALS
EA 2.000 $18,000.000 $5,750.000 $6,550.000 $15,574.000 $15,574.000
PRSSR IRRIG PVC PIPE (18")
LF 187.000 $213.000 $200.000 $120.000 $195.000 $110.000
PRSSR IRRIG PVC PIPE (24")
LF 451.000 $250.000 $390.000 $140.000 $250.000 $165.000
SP MIXES SP-D SAC-A PG76-22
TON 27,322.000 $130.000 $110.000 $116.000 $140.000 $150.000
BONDING COURSE
GAL 10,953.000 $6.000 $4.000 $5.000 $6.000 $6.000
RC LOW HEAD PRSSR PIPE (CL III)(36")
LF 195.000 $125.000 $450.000 $150.000 $320.000 $235.000
RC LOW HEAD PRSSR PIPE (CL III)(48")
LF 90.000 $160.000 $320.000 $230.000 $460.000 $300.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 156,925.000 $2.000 $1.250 $3.000 $2.600 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 224.000 $80.000 $75.000 $46.000 $350.000 $150.000
TMA (STATIONARY)
DAY 205.000 $175.000 $20.000 $15.000 $200.000 $150.000
TMA (MOBILE OPERATION)
DAY 59.000 $175.000 $0.010 $15.000 $300.000 $250.000
Totals: $15,854,781.300 $15,785,772.440 $16,938,321.000 $19,995,000.000 $20,101,450.590