CAMERON FM 511 (0684-02-014)

Items: 65

County: CAMERON
Length: N/A
Highway: FM 511
District: PHARR
Control Number: 0684-02-014
DBE Goal: N/A
Project: BR 2021(644)
Guaranty: N/A
Time: 131 WORKING DAYS
Engineer's Estimate: $986,990.10
Date: 06/04/2021 (5 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$986,990.10
$1,147,081.10
Over/Under Est: 16.22% $160,091.00
Over/Under Est: 22.19% $218,975.75
Amt Left: 5.13% $58,884.75
$1,212,411.40
Over/Under Est: 22.84% $225,421.30
Amt Left: 5.7% $65,330.30
Delta: -0.53% -$6,445.55
Over/Under Est: 25.91% $255,755.15
Amt Left: 8.34% $95,664.15
Delta: -2.50% -$30,333.85
Over/Under Est: 49.66% $490,134.10
Amt Left: 28.77% $330,043.10
Delta: -18.86% -$234,378.95
$1,685,933.77
Over/Under Est: 70.82% $698,943.67
Amt Left: 46.98% $538,852.67
Delta: -14.14% -$208,809.57

Bid Items & Bid Tabulations

65 Total 0 of 65
CAMERON  |  FM 511  |  PHARR  |  0684-02-014  |  06/04/2021  |  $986,990.10  |  BR 2021(644)  |  BRIDGE REPL  |  131 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
IOC COMPANY, LLC
ANDERSON COLUMBIA CO., INC.
FOREMOST PAVING, INC.
TEXAS CORDIA CONSTRUCTION, LLC
LUCANIA CONSTRUCTION LLC
CLORE EQUIPMENT LLC
PREPARING ROW
STA 6.100 $5,000.000 $4,000.000 $5,000.000 $15,000.000 $1,500.000 $8,200.000 $1,121.910
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 1,955.000 $6.000 $10.000 $11.350 $8.000 $7.000 $25.000 $10.710
EXCAVATION (ROADWAY)
CY 484.000 $8.000 $15.000 $14.750 $25.000 $21.000 $20.000 $43.970
EXCAVATION (CHANNEL)
CY 531.000 $15.000 $15.000 $21.250 $42.000 $23.000 $23.000 $26.160
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 327.000 $8.500 $15.000 $17.500 $30.000 $22.000 $30.000 $31.930
BLADING
STA 6.100 $150.000 $250.000 $350.000 $100.000 $375.000 $930.000 $2,163.460
FURNISHING AND PLACING TOPSOIL
CY 357.000 $30.000 $35.000 $57.000 $35.000 $50.000 $24.000 $38.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 2,763.000 $0.200 $0.350 $0.500 $0.500 $0.450 $0.600 $1.000
DRILL SEEDING (TEMP) (WARM)
SY 2,763.000 $0.200 $0.350 $0.500 $0.450 $0.400 $0.500 $1.000
VEGETATIVE WATERING
MG 112.000 $25.000 $30.000 $37.000 $40.000 $25.000 $58.000 $72.490
PROOF ROLLING
HR 8.000 $60.000 $75.000 $96.000 $95.000 $70.000 $140.000 $139.250
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 889.000 $60.000 $50.000 $90.000 $56.000 $85.000 $82.000 $84.860
CEMENT
TON 32.700 $170.000 $165.000 $193.000 $150.000 $225.000 $245.000 $165.650
CEMENT TREAT (NEW BASE)(11")
SY 2,909.000 $3.000 $4.000 $5.600 $9.000 $4.000 $4.000 $5.290
PRIME COAT (MC-30)
GAL 565.000 $4.150 $5.000 $6.600 $7.500 $8.000 $9.500 $9.950
AGGR (TY-PD GR-4P)(SAC-B)
CY 24.000 $80.000 $250.000 $294.000 $70.000 $231.000 $120.000 $193.440
ASPH (SPG 79-13)
GAL 849.000 $2.750 $8.000 $4.600 $15.000 $16.000 $10.000 $9.950
CEM STABIL BKFL
CY 174.000 $50.000 $80.000 $56.000 $125.000 $60.000 $115.000 $70.910
DRILL SHAFT (18 IN)
LF 184.000 $150.000 $160.000 $180.000 $120.000 $150.000 $128.000 $182.790
DRILL SHAFT (36 IN)
LF 460.000 $250.000 $280.000 $280.000 $189.000 $260.000 $520.000 $560.610
CL C CONC (ABUT)
CY 66.000 $1,000.000 $1,000.000 $960.000 $1,300.000 $1,000.000 $1,200.000 $1,568.420
REINF CONC SLAB
SF 4,140.000 $21.000 $22.000 $22.000 $19.000 $22.000 $40.000 $64.610
PRESTR CONC GIRDER (TX40)
LF 537.000 $135.000 $175.000 $181.000 $165.000 $350.000 $205.000 $307.820
RIPRAP (CONC)(5 IN)
CY 113.000 $500.000 $500.000 $500.000 $673.000 $560.000 $350.000 $472.780
RIPRAP (MOW STRIP)(4 IN)
CY 4.000 $430.000 $1,000.000 $550.000 $575.000 $685.000 $890.000 $523.440
RAIL (TY T223)
LF 240.000 $120.000 $150.000 $82.000 $131.000 $140.000 $150.000 $247.520
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 92.000 $120.000 $250.000 $162.500 $179.000 $200.000 $300.000 $324.190
RC PIPE (CL III)(18 IN)
LF 287.000 $60.000 $70.000 $57.000 $60.000 $52.000 $60.000 $73.240
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $775.000 $1,000.000 $1,500.000 $1,500.000 $800.000 $1,500.000 $1,903.030
REMOV STR (SET)
EA 2.000 $300.000 $500.000 $400.000 $400.000 $500.000 $700.000 $614.660
REMOV STR (PIPE)
LF 211.000 $10.000 $15.000 $5.000 $5.000 $24.000 $35.000 $11.960
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $25,000.000 $65,000.000 $45,000.000 $51,425.000 $41,000.000 $90,000.000 $40,844.050
REMOV STR (SMALL FENCE)
LF 299.000 $5.000 $3.000 $5.000 $5.000 $3.000 $8.000 $14.670
MOBILIZATION
LS 1.000 $89,726.000 $110,000.000 $147,000.000 $105,000.000 $100,000.000 $85,000.000 $160,163.710
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $6,500.000 $1,500.000 $1,000.000 $4,200.000 $3,800.000 $2,400.000 $2,661.370
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 40.000 $60.000 $35.000 $57.000 $60.000 $85.000 $72.000 $21.700
ROCK FILTER DAMS (REMOVE)
LF 40.000 $20.000 $10.000 $47.000 $50.000 $55.000 $56.000 $16.290
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 222.000 $25.000 $20.000 $24.000 $15.000 $23.000 $35.000 $16.950
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $10.000 $10.000 $10.000 $9.000 $19.000 $5.000 $2.930
FRNT END LOADER WORK (ERSN & SEDM CONT)
HR 20.000 $80.000 $100.000 $90.000 $98.000 $5.000 $100.000 $95.170
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,231.000 $4.000 $6.000 $5.000 $5.000 $5.000 $6.150 $5.790
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,231.000 $1.000 $1.000 $1.500 $1.250 $1.000 $1.750 $1.690
DRIVEWAYS (ACP)
SY 272.000 $35.000 $70.000 $57.600 $80.000 $47.000 $40.000 $95.970
MTL W-BEAM GD FEN (TIM POST)
LF 12.500 $24.000 $35.000 $37.000 $45.000 $25.000 $50.000 $135.180
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $1,700.000 $1,800.000 $2,500.000 $3,500.000 $3,000.000 $2,500.000 $2,403.510
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,000.000 $2,850.000 $3,000.000 $4,500.000 $3,200.000 $3,450.000 $3,269.510
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 3.000 $20,000.000 $24,500.000 $27,200.000 $25,000.000 $24,500.000 $29,000.000 $20,160.320
GATE (REMOVE)
EA 1.000 $850.000 $1,000.000 $360.000 $350.000 $350.000 $900.000 $2,147.770
REMOVE AND INSTALL EXISTING GATE
EA 3.000 $1,000.000 $2,200.000 $880.000 $900.000 $850.000 $950.000 $1,073.890
CHAIN LINK FENCE (INSTALL) (4')
LF 214.000 $50.000 $20.000 $16.000 $15.000 $18.000 $55.000 $21.020
MAILBOX INSTALL-S (TWG-POST) TY 4
EA 2.000 $200.000 $450.000 $470.000 $145.000 $440.000 $550.000 $847.760
MAILBOX INSTALL-D (TWG-POST) TY 4
EA 1.000 $300.000 $500.000 $520.000 $360.000 $448.000 $610.000 $1,389.010
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $525.000 $1,100.000 $1,140.000 $550.000 $1,085.000 $1,350.000 $768.640
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $650.000 $1,350.000 $1,400.000 $650.000 $1,205.000 $1,650.000 $768.640
REMOVE SM RD SN SUP&AM
EA 2.000 $85.000 $300.000 $93.000 $200.000 $200.000 $225.000 $191.790
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $100.000 $55.000 $57.000 $90.000 $460.000 $70.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 2.000 $35.000 $65.000 $68.000 $85.000 $468.000 $80.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 9.000 $100.000 $80.000 $83.000 $100.000 $481.000 $120.000 $75.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 34.000 $7.500 $25.000 $14.000 $14.000 $25.000 $17.000 $33.820
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,056.000 $0.500 $2.750 $1.250 $1.200 $3.000 $1.500 $5.380
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 153.000 $0.500 $3.000 $1.250 $1.200 $3.000 $1.500 $5.310
REFL PAV MRKR TY II-A-A
EA 8.000 $3.000 $20.000 $7.000 $7.000 $20.000 $8.500 $20.000
D-GR HMA TY-D SAC-A PG76-22
TON 472.600 $100.000 $110.000 $180.000 $115.000 $162.000 $130.000 $121.950
GEOGRID BASE REINFORCEMENT (TY II)
SY 3,006.000 $1.400 $8.000 $2.500 $4.000 $2.000 $4.250 $2.890
TMA (MOBILE OPERATION)
DAY 2.000 $250.000 $3,500.000 $565.000 $250.000 $450.000 $900.000 $275.000
Totals: $986,990.100 $1,147,081.100 $1,205,965.850 $1,212,411.400 $1,242,745.250 $1,477,124.200 $1,685,933.782