Show Job Controls
Bid Cobra

CAMERON FM 1421 (0331-03-022)

Items: 118

County: CAMERON
Length: 6.5490 MILES
Highway: FM 1421
District: PHARR
Control Number: 0331-03-022
DBE Goal: 0.0%
Project: F 2026(245)
Guaranty: $100,000.00
Time: 428 WORKING DAYS
Engineer's Estimate: $18,316,364.29
Date: 12/02/2025 (6 months ago)
Contract Number: 12253005
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00131922
Contract Type: Federal
Project Description: REHABILITATE ROADWAY
Mail/Deliver Bids To: N/A
ANDRES ESPINOZA
GABRIEL VILLARREAL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$18,316,364.29
$14,628,508.87
Over/Under Est: -20.13% -$3,687,855.42
$15,395,000.00
Over/Under Est: -15.95% -$2,921,364.29
Amt Left: 5.24% $766,491.13
$16,138,874.33
Over/Under Est: -11.89% -$2,177,489.96
Amt Left: 10.32% $1,510,365.46
Delta: -4.83% -$743,874.33
$16,354,779.61
Over/Under Est: -10.71% -$1,961,584.68
Amt Left: 11.8% $1,726,270.74
Delta: -1.34% -$215,905.28
Over/Under Est: -9.95% -$1,822,913.40
Amt Left: 12.75% $1,864,942.02
Delta: -0.85% -$138,671.28
$17,174,566.45
Over/Under Est: -6.23% -$1,141,797.84
Amt Left: 17.4% $2,546,057.58
Delta: -4.13% -$681,115.56

Bid Items & Bid Tabulations

118 Total 0 of 118
CAMERON  |  FM 1421  |  PHARR  |  0331-03-022  |  12/02/2025  |  $18,316,364.29  |  F 2026(245)  |  REHAB EXIST ROADWAY  |  428 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
IOC COMPANY, LLC
POSILLICO CIVIL, INC.
REIM CONSTRUCTION, INC.
FOREMOST PAVING, INC.
GO UNDERGROUND, LIMITED LIABILITY COMPANY
CK NEWBERRY, LLC
PREPARING ROW
STA 344.000 $7,000.000 $1,500.000 $2,850.000 $1,750.000 $2,500.000 $1,779.070 $200.000
REMOV CONC (PAV)
SY 337.000 $10.200 $21.410 $12.000 $18.750 $7.100 $12.000 $20.000
REMOV CONC (RIPRAP)
SY 270.000 $18.000 $20.450 $15.000 $16.250 $37.900 $12.000 $30.000
REMOV CONC (DRIVEWAYS)
SY 888.000 $30.000 $19.360 $5.000 $14.250 $44.200 $12.000 $30.000
EXCAV (ROADWAY)
CY 56,233.000 $11.000 $7.000 $4.500 $7.600 $13.500 $6.000 $10.000
EMBANK (FNL)(DC)(TY C)
CY 3,905.000 $15.000 $5.920 $3.000 $6.250 $9.400 $8.000 $13.000
BACKFILL (TY A)
STA 344.000 $300.000 $245.000 $200.000 $240.000 $205.900 $1,200.000 $200.000
FURN & PLACE TOPSOIL (VEH)
CY 50.000 $32.500 $36.140 $115.000 $48.500 $33.800 $120.000 $50.000
HYDRO MULCH SEED (PERM_RURAL_CLAY)
SY 133,942.000 $0.550 $0.380 $0.470 $0.400 $0.800 $0.740 $0.750
HYDRO MULCH SEED (TEMP_WARM)
SY 133,942.000 $0.500 $0.300 $0.470 $0.350 $0.700 $0.650 $0.650
VEGETATIVE WATERING
TGL 2,254.000 $11.000 $30.000 $20.000 $32.000 $26.000 $170.000 $16.000
SPRINKLING (DUST CONTROL)
TGL 1,377.000 $9.000 $1.000 $1.000 $32.000 $1.000 $12.000 $20.000
FL BS (RDWY DEL)(TY E GR 4)(FNL POS)
CY 29,143.000 $29.000 $55.000 $42.000 $56.000 $43.400 $43.860 $64.000
GEOGRID BASE REINFORCEMENT (TYPE 2)
SY 170,202.000 $1.350 $1.750 $1.000 $1.250 $1.400 $1.540 $1.000
REWORK BS MTL (TY B)(6")(DC)(ORG POS)
CY 25,236.000 $3.000 $4.000 $9.500 $6.600 $6.600 $4.000 $15.000
LIME (COM OR QK)(SLURRY)
TON 5,054.000 $220.000 $215.500 $300.000 $364.000 $237.200 $375.940 $350.000
LIME TRT (EXIST MATL)(12")
SY 170,202.000 $3.000 $3.250 $2.500 $2.000 $3.400 $2.000 $3.250
CEMENT
TON 1,835.000 $205.000 $190.000 $200.000 $222.000 $174.200 $200.000 $200.000
CEMENT TRT (EXIST MATL & NEW BASE)(12")
SY 163,130.000 $2.750 $2.500 $2.000 $2.250 $2.600 $2.000 $2.000
SALV,HAUL & STKPL RCL APH PV (2")
SY 151,413.000 $6.130 $1.000 $1.000 $1.450 $1.900 $2.000 $1.000
PRIME COAT (MC-30)
GAL 32,626.000 $5.200 $4.000 $4.000 $4.600 $4.300 $10.000 $4.000
ASPH (TIER II)
GAL 48,938.000 $5.000 $3.750 $5.000 $2.950 $6.200 $10.000 $3.000
AGGR (TY-B GR-4P SAC-B)
CY 1,358.000 $100.000 $100.000 $120.000 $249.000 $66.100 $165.000 $120.000
SP MIXES SP-D SAC-A PG76-22
TON 26,688.000 $120.000 $124.100 $120.000 $145.000 $116.250 $129.560 $140.000
PLANE & TEXT ASPH CONC PAV(1.5")
SY 2,163.000 $1.500 $3.000 $1.000 $4.500 $13.700 $8.000 $7.000
STRUCT EXCAV
CY 102.000 $33.000 $50.000 $65.000 $10.750 $35.000 $24.000 $50.000
STRUCT EXCAV (SPECIAL)
CY 35.000 $100.000 $150.000 $200.000 $109.000 $90.000 $100.000 $250.000
CUT & RESTORE ASPH PAVING
SY 98.000 $150.000 $170.000 $225.000 $74.000 $200.000 $85.000 $100.000
CEM STABIL BKFL
CY 55.000 $120.000 $75.000 $100.000 $155.000 $180.000 $85.000 $275.000
TRENCH EXCAVATION PROTECTION
LF 249.000 $3.500 $5.000 $60.000 $3.800 $1.000 $1.000 $20.000
RIPRAP (CONC)(4 IN)
CY 872.000 $600.000 $500.000 $385.000 $540.000 $860.000 $480.000 $800.000
RIPRAP (CONC)(CL B)(5 IN)
CY 35.000 $600.000 $655.000 $400.000 $573.000 $1,670.000 $476.000 $775.000
RIPRAP (MOW STRIP)(4 IN)
CY 290.000 $600.000 $550.000 $425.000 $640.000 $805.000 $481.000 $725.000
RC PIPE (CL III)(18 IN)
LF 8,682.000 $95.000 $100.000 $95.000 $72.500 $108.700 $89.090 $85.000
RC PIPE (CL III)(24 IN)
LF 48.000 $100.000 $160.000 $165.000 $100.000 $365.000 $100.670 $160.000
RC PIPE (CL IV)(24 IN)
LF 114.000 $200.000 $170.000 $170.000 $121.000 $385.000 $120.800 $125.000
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 1.000 $12,288.280 $5,500.000 $8,000.000 $5,570.000 $9,200.000 $5,150.000 $14,000.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT)
EA 1.000 $5,000.000 $5,000.000 $9,000.000 $10,900.000 $8,700.000 $4,700.000 $14,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $1,500.000 $1,350.000 $1,500.000 $672.000 $1,200.000 $1,325.000 $2,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 399.000 $1,200.000 $1,000.000 $3,250.000 $818.000 $1,350.000 $1,425.000 $1,800.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $2,200.000 $1,500.000 $1,800.000 $964.000 $1,470.000 $1,175.000 $2,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,700.000 $2,000.000 $2,200.000 $977.000 $1,470.000 $2,300.000 $3,200.000
CLEAN EXIST CULVERTS
EA 12.000 $5,000.000 $2,000.000 $450.000 $4,500.000 $27,000.000 $4,000.000 $3,200.000
REMOV STR (INLET)
EA 2.000 $1,000.000 $750.000 $700.000 $721.000 $620.000 $1,200.000 $2,100.000
REMOV STR (SET)
EA 351.000 $400.000 $250.000 $150.000 $422.000 $420.000 $199.720 $600.000
REMOV STR (PIPE)
LF 7,481.000 $20.000 $10.000 $8.000 $18.500 $20.000 $4.000 $12.000
MOBILIZATION
LS 1.000 $1,987,859.520 $1,338,500.000 $1,397,354.820 $1,450,000.000 $1,200,000.000 $906,000.000 $1,675,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 27.000 $12,839.000 $2,350.000 $7,000.000 $4,320.000 $7,800.000 $12,211.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $13,000.000 $15,000.000 $12,000.000 $5,470.000 $7,936.700 $22,000.000 $20,000.000
TMA (STATIONARY)
DAY 776.000 $210.000 $1.000 $55.000 $51.500 $45.100 $25.000 $250.000
TMA (MOBILE OPERATION)
DAY 31.000 $211.000 $10.000 $400.000 $399.000 $0.010 $25.000 $300.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 560.000 $100.000 $39.000 $35.000 $46.750 $95.000 $34.000 $95.000
ROCK FILTER DAMS (REMOVE)
LF 560.000 $30.000 $17.000 $5.000 $17.500 $40.000 $1.000 $40.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 936.000 $20.000 $25.000 $25.000 $10.750 $23.500 $28.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 936.000 $5.500 $10.000 $5.000 $9.000 $13.100 $1.000 $10.000
FRNT END LOADER WORK (ERSN & SEDM CONT)
HR 40.000 $200.000 $100.000 $25.000 $87.000 $90.600 $150.000 $100.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,084.000 $4.300 $3.100 $3.000 $3.750 $4.500 $6.500 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,084.000 $1.300 $1.100 $1.000 $1.300 $2.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,040.000 $5.000 $4.000 $3.000 $3.500 $6.800 $8.750 $6.750
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,040.000 $1.370 $0.100 $1.000 $1.000 $2.000 $1.000 $2.000
DRIVEWAYS (CONC)
SY 1,106.000 $120.000 $125.000 $90.000 $69.500 $76.200 $78.700 $75.000
DRIVEWAYS (ACP)
SY 8,155.000 $55.000 $60.000 $38.000 $41.500 $54.100 $65.000 $45.000
TURNOUTS (CONC)
SY 446.000 $90.660 $150.000 $65.000 $89.500 $81.400 $120.000 $125.000
MTL W-BEAM GD FEN (TIM POST)
LF 4,000.000 $29.000 $25.850 $28.000 $29.750 $27.600 $28.600 $30.000
REMOVE METAL BEAM GUARD FENCE
LF 4,200.000 $3.000 $4.250 $3.000 $7.500 $2.900 $6.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 13.000 $260.000 $275.000 $250.000 $621.000 $220.000 $400.000 $300.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 13.000 $200.000 $275.000 $250.000 $725.000 $230.000 $400.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 26.000 $3,500.000 $3,463.000 $3,200.000 $4,390.000 $3,275.000 $4,510.000 $3,500.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 116.000 $260.000 $375.000 $250.000 $581.000 $315.000 $400.000 $375.000
ELEC CONDR (NO.8) BARE
LF 15.000 $2.200 $1.870 $1.000 $1.950 $1.700 $1.700 $1.500
TRAY CABLE (4 CONDR) (12 AWG)
LF 615.000 $3.000 $2.650 $2.000 $2.750 $2.400 $2.400 $3.500
ALUMINUM SIGNS (TY A)
SF 23.000 $30.000 $36.380 $40.000 $37.500 $33.000 $33.000 $50.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 47.000 $800.000 $675.000 $1,000.000 $769.000 $725.000 $850.000 $675.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 13.000 $950.000 $950.000 $1,200.000 $1,080.000 $945.000 $1,025.000 $950.000
REMOVE SM RD SN SUP&AM
EA 60.000 $100.000 $85.000 $50.000 $97.000 $288.500 $200.000 $85.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 94.000 $35.000 $35.000 $170.000 $40.000 $30.000 $25.000 $25.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 26.000 $96.620 $95.000 $170.000 $108.000 $54.000 $80.000 $175.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 26.000 $21.000 $25.000 $8.000 $27.750 $121.500 $35.000 $15.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 67,909.000 $0.320 $0.630 $0.500 $0.600 $0.700 $0.670 $0.600
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 80.000 $10.680 $12.980 $11.000 $18.250 $12.800 $12.800 $13.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 67,545.000 $0.330 $0.630 $0.500 $0.600 $0.700 $0.620 $0.650
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 1,196.000 $1.150 $1.120 $1.000 $0.880 $1.100 $1.100 $1.100
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 400.000 $1.150 $1.120 $1.000 $0.880 $1.100 $1.100 $1.100
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,722.000 $1.250 $1.500 $1.200 $1.150 $1.300 $0.570 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,000.000 $1.100 $1.420 $1.000 $1.200 $1.400 $1.400 $1.400
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 620.000 $8.000 $11.560 $10.000 $18.250 $11.400 $11.400 $11.500
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,058.000 $4.000 $4.260 $4.000 $2.300 $4.200 $4.100 $4.200
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 67,445.000 $0.800 $0.760 $0.500 $1.100 $0.800 $0.750 $0.750
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 6,650.000 $0.500 $0.730 $0.500 $1.200 $0.800 $0.720 $0.750
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 26,119.000 $0.650 $0.710 $0.500 $1.050 $0.700 $0.700 $0.700
PREFAB PM TY C (W)(ARROW)
EA 14.000 $230.000 $243.380 $225.000 $171.000 $240.000 $240.000 $240.000
PREFAB PM TY C (W)(WORD)
EA 7.000 $280.000 $243.380 $225.000 $285.000 $240.000 $240.000 $240.000
PREFAB PM TY C (W)(RR XING)
EA 1.000 $600.000 $689.580 $650.000 $684.000 $680.000 $680.000 $680.000
REFL PAV MRKR TY I-C
EA 51.000 $4.500 $4.870 $4.000 $8.500 $4.800 $4.800 $4.800
REFL PAV MRKR TY II-A-A
EA 1,030.000 $4.000 $3.850 $3.000 $8.500 $3.800 $3.800 $3.800
TRAFFIC BUTTON TY Y
EA 1,536.000 $2.040 $2.840 $2.000 $4.000 $2.800 $2.800 $2.800
TRAFFIC BUTTON TY B
EA 10,800.000 $2.100 $2.230 $2.000 $2.300 $2.200 $2.200 $2.200
ELIM EXT PM & MRKS (4")
LF 34,377.000 $0.350 $0.460 $0.400 $0.350 $0.500 $0.450 $0.450
ELIM EXT PM & MRKS (ARROW)
EA 2.000 $55.000 $101.410 $75.000 $85.500 $100.000 $100.000 $100.000
ELIM EXT PM & MRKS (WORD)
EA 1.000 $62.000 $101.410 $75.000 $85.500 $100.000 $100.000 $100.000
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $9,000.000 $716.480 $5,500.000 $741.000 $650.000 $650.000 $9,500.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $20,000.000 $3,306.830 $8,800.000 $3,420.000 $3,000.000 $3,000.000 $25,000.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $6,700.000 $2,039.220 $2,800.000 $2,110.000 $1,850.000 $1,850.000 $6,000.000
TEMP TRAF SIGNALS
EA 2.000 $60,000.000 $3,086.380 $6,800.000 $3,190.000 $2,800.000 $2,800.000 $6,000.000
VEH SIG SEC (12")LED(GRN)
EA 8.000 $300.000 $330.680 $363.000 $342.000 $300.000 $300.000 $250.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $300.000 $330.680 $363.000 $342.000 $300.000 $300.000 $250.000
VEH SIG SEC (12")LED(YEL)
EA 12.000 $300.000 $330.680 $363.000 $342.000 $300.000 $300.000 $250.000
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000 $300.000 $330.680 $363.000 $342.000 $300.000 $300.000 $250.000
VEH SIG SEC (12")LED(RED)
EA 10.000 $300.000 $330.680 $363.000 $342.000 $300.000 $300.000 $250.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $300.000 $330.680 $363.000 $342.000 $300.000 $300.000 $250.000
BACKPLATE W/REFL BRDR(4 SEC)
EA 4.000 $211.000 $137.790 $180.000 $142.000 $125.000 $125.000 $235.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 8.000 $210.000 $203.920 $130.000 $211.000 $185.000 $185.000 $210.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 925.000 $3.000 $1.980 $1.500 $2.000 $1.800 $1.800 $3.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 735.000 $4.000 $2.430 $2.500 $2.500 $2.200 $2.200 $3.500
REMOVAL OF CONDUIT
LF 2,115.000 $13.330 $2.200 $3.000 $2.300 $2.000 $2.000 $4.850
REMOVAL OF GROUND BOXES
EA 21.000 $1,500.000 $216.050 $250.000 $223.000 $196.000 $196.000 $150.000
BONDING COURSE
GAL 10,925.000 $4.000 $3.000 $6.000 $4.900 $2.600 $10.000 $4.250
RVDS (PRESENCE AND ADVANCE DETECTION)
EA 4.000 $9,000.000 $9,810.270 $7,800.000 $10,100.000 $8,900.000 $10,900.000 $4,000.000
Totals: $18,316,364.290 $14,628,508.870 $15,395,000.000 $16,138,874.330 $16,354,779.610 $16,493,450.890 $17,174,566.450