Show Job Controls
Bid Cobra

CAMERON SH 48 (0220-07-072)

Items: 57

County: CAMERON
Length: 0.0000 MILES
Highway: SH 48
District: PHARR
Control Number: 0220-07-072
DBE Goal: 0.0%
Project: F 2026(280)
Guaranty: $13,000.00
Time: 113 WORKING DAYS
Engineer's Estimate: $657,837.90
Date: 02/05/2026 (4 months ago)
Contract Number: 2263236
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00196898
Contract Type: Federal
Project Description: SAFETY LIGHTING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ANDRES ESPINOZA
JESUS NORIEGA
ARLEENE GARCIA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$657,837.90
Over/Under Est: -20.38% -$134,089.50
$610,861.04
Over/Under Est: -7.14% -$46,976.86
Amt Left: 16.63% $87,112.64
Over/Under Est: -4.77% -$31,374.30
Amt Left: 19.61% $102,715.20
Delta: -2.55% -$15,602.56

Bid Items & Bid Tabulations

57 Total 0 of 57
CAMERON  |  SH 48  |  PHARR  |  0220-07-072  |  02/05/2026  |  $657,837.90  |  F 2026(280)  |  HAZARD ELIM & SAFETY  |  113 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC
TRAF-TEX, INC.
THE LEVY COMPANY, LLC
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 340.000 $265.000 $190.000 $213.000 $257.980
RIPRAP (CONC) (CL B) (4 IN)
CY 12.000 $750.000 $600.000 $600.000 $645.830
MOBILIZATION
LS 1.000 $62,500.000 $25,000.000 $24,000.000 $62,646.360
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,000.000 $1,750.000 $1,618.000 $2,358.400
TMA (STATIONARY)
DAY 58.000 $95.000 $180.000 $200.000 $59.110
TMA (MOBILE OPERATION)
DAY 53.000 $120.000 $180.000 $316.000 $59.110
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 240.000 $5.200 $7.800 $10.210 $5.310
BIODEG EROSN CONT LOGS (REMOVE)
LF 240.000 $1.300 $2.100 $3.610 $1.950
IN RD IL (TY SA) 40T-12 (250W EQ) LED
EA 20.000 $4,800.000 $4,100.000 $4,565.000 $4,381.670
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 14.000 $5,150.000 $4,600.000 $4,772.000 $5,002.860
CONDT (PVC) (SCH 40) (2")
LF 7,582.000 $10.000 $7.000 $8.000 $8.900
CONDT (PVC) (SCH 80) (2") (BORE)
LF 850.000 $33.000 $28.000 $33.500 $25.180
ELEC CONDR (NO.6) BARE
LF 8,522.000 $1.700 $1.200 $2.250 $2.010
ELEC CONDR (NO.6) INSULATED
LF 15,884.000 $1.900 $1.400 $2.520 $2.190
GROUND BOX TY A (122311)W/APRON
EA 12.000 $880.000 $850.000 $1,028.000 $1,146.480
ELC SRV TY A 240/480 060(SS)SS(T)TP(O)
EA 3.000 $6,500.000 $5,500.000 $8,472.000 $9,059.730
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 27.000 $37.000 $33.000 $31.000 $30.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $900.000 $1,100.000 $960.000 $1,750.000
REMOVE SM RD SN SUP&AM
EA 1.000 $217.000 $120.000 $280.000 $250.000
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
LF 80.000 $2.500 $4.200 $4.220 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 500.000 $1.000 $3.500 $3.800 $1.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 315.000 $8.000 $12.500 $13.110 $8.500
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 675.000 $2.300 $6.200 $7.110 $4.500
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 18,070.000 $0.700 $1.100 $1.220 $1.100
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 7,900.000 $0.850 $1.300 $1.330 $1.350
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 790.000 $1.300 $2.000 $1.800 $2.000
PAVEMENT SLER 6"
LF 36,265.000 $0.540 $0.400 $0.720 $0.320
PAVEMENT SLER 8"
LF 580.000 $1.190 $1.100 $0.950 $0.460
PAVEMENT SLER 12"
LF 675.000 $1.300 $1.400 $2.220 $0.720
PAVEMENT SLER 24"
LF 315.000 $2.850 $2.800 $3.330 $0.960
PAVEMENT SLER (ARROW)
EA 3.000 $20.000 $28.000 $22.220 $15.000
PAVEMENT SLER (WORD)
EA 3.000 $25.000 $28.000 $22.220 $23.000
PAVEMENT SLER (DBL ARROW)
EA 1.000 $40.000 $56.000 $44.440 $23.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 680.000 $0.650 $1.200 $0.950 $3.500
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 950.000 $0.700 $1.300 $1.060 $3.500
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 7,760.000 $0.630 $0.800 $0.830 $1.100
PREFAB PM TY C (W)(ARROW)
EA 3.000 $170.000 $280.000 $290.000 $200.000
PREFAB PM TY C (W)(DBL ARROW)
EA 1.000 $348.000 $480.000 $467.000 $350.000
PREFAB PM TY C (W)(WORD)
EA 3.000 $250.000 $280.000 $290.000 $250.000
REFL PAV MRKR TY I-C
EA 60.000 $4.900 $6.000 $4.900 $7.500
REFL PAV MRKR TY II-A-A
EA 515.000 $5.000 $4.500 $4.220 $7.500
TRAFFIC BUTTON TY Y
EA 1,215.000 $2.400 $2.800 $2.440 $2.500
TRAFFIC BUTTON TY B
EA 80.000 $2.350 $5.000 $4.000 $3.500
ELIM EXT PM & MRKS (6")
LF 36,265.000 $0.730 $0.500 $0.450 $0.550
ELIM EXT PM & MRKS (8")
LF 500.000 $0.700 $1.700 $1.300 $0.650
ELIM EXT PM & MRKS (12")
LF 675.000 $1.200 $3.400 $3.110 $0.950
ELIM EXT PM & MRKS (24")
LF 315.000 $2.700 $4.800 $4.000 $3.500
ELIM EXT PM & MRKS (ARROW)
EA 3.000 $45.000 $110.000 $88.900 $50.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 1.000 $74.000 $220.000 $178.000 $65.000
ELIM EXT PM & MRKS (WORD)
EA 3.000 $50.000 $110.000 $88.900 $50.000
PAV SURF PREP FOR MRK (6")
LF 36,265.000 $0.100 $0.150 $0.110 $0.040
PAV SURF PREP FOR MRK (8")
LF 580.000 $0.120 $0.280 $0.220 $0.060
PAV SURF PREP FOR MRK (12")
LF 675.000 $0.200 $0.450 $0.330 $0.080
PAV SURF PREP FOR MRK (24")
LF 315.000 $0.800 $1.200 $1.110 $0.200
PAV SURF PREP FOR MRK (ARROW)
EA 3.000 $10.000 $7.000 $5.600 $20.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 1.000 $15.000 $10.000 $8.900 $20.000
PAV SURF PREP FOR MRK (WORD)
EA 3.000 $20.000 $10.000 $8.900 $20.000
Totals: $657,837.900 $523,748.400 $610,861.040 $626,463.600
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,500.00
PUBLIC UTILITY FORCE ACCT WORK (PART) $6,000.00
Total: $18,500.00