REMOVING CONC (PAV)
|
SY
|
213.000
|
$10.000
|
$45.000
|
|
|
REMOVING CONC (SAWCUT)
|
LF
|
95.000
|
$10.000
|
$115.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4" - 6")
|
SY
|
2,123.000
|
$5.000
|
$26.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
82.000
|
$8.000
|
$100.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
168.000
|
$10.000
|
$100.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
2,323.000
|
$0.120
|
$3.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
2,323.000
|
$0.100
|
$3.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
2,323.000
|
$1.500
|
$7.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(11")
|
SY
|
2,127.000
|
$20.000
|
$48.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
533.000
|
$5.000
|
$15.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
703.000
|
$130.000
|
$210.000
|
|
|
SUPERPAVE MIXTURES SP-D PG76-28
|
TON
|
1,848.000
|
$150.000
|
$168.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
2,201.000
|
$50.000
|
$40.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,067.000
|
$2.000
|
$22.000
|
|
|
CONC PVMT (JOINTED - CPCD) (10")
|
SY
|
213.000
|
$110.000
|
$125.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
16.000
|
$200.000
|
$485.000
|
|
|
CL C CONC (ABUT)(HPC)(EXTEND)
|
CY
|
2.800
|
$1,100.000
|
$3,600.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
38.000
|
$900.000
|
$1,125.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
13,858.000
|
$25.000
|
$38.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
214.200
|
$700.000
|
$825.000
|
|
|
CONCRETE GIRDER (EXTEND)(HPC)
|
CY
|
309.400
|
$800.000
|
$2,275.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
55.000
|
$150.000
|
$325.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
98.900
|
$500.000
|
$585.000
|
|
|
STR STEEL (SHEAR CONNECTOR)
|
LB
|
3,031.000
|
$15.000
|
$63.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM III-A)
|
LS
|
2.000
|
$20,000.000
|
$250,000.000
|
|
|
RAIL (TY T223)
|
LF
|
718.000
|
$150.000
|
$145.000
|
|
|
RAIL (TY SSTR)
|
LF
|
258.000
|
$45.000
|
$285.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
544.000
|
$90.000
|
$285.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
226.000
|
$150.000
|
$125.000
|
|
|
REMOV STR (BRIDGE SLAB)
|
EA
|
3.000
|
$250,000.000
|
$145,000.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
2.000
|
$10,000.000
|
$15,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$330,000.000
|
$510,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$7,000.000
|
$9,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,560.000
|
$4.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,560.000
|
$1.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
330.000
|
$4.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
330.000
|
$1.500
|
$3.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
8.000
|
$5,000.000
|
$8,500.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
3,240.000
|
$10.000
|
$32.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
240.000
|
$10.000
|
$32.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$12.000
|
$32.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
840.000
|
$10.000
|
$16.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
3,240.000
|
$7.500
|
$32.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
240.000
|
$7.500
|
$32.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$11.000
|
$32.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
625.000
|
$28.000
|
$29.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,000.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
600.000
|
$3.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$275.000
|
$500.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$300.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$3,000.000
|
$3,100.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$2,500.000
|
$3,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,000.000
|
$3,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$10,000.000
|
$15,500.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
831.000
|
$10.000
|
$6.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,577.000
|
$1.250
|
$1.250
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
7.000
|
$1,000.000
|
$2,600.000
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$240.000
|
$500.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$500.000
|
$5,000.000
|
|
|
ELC SRV TY A 240/480 060(NS)AL(E)SP(O)
|
EA
|
1.000
|
$5,000.000
|
$2,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$450.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$650.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$750.000
|
$1,000.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,000.000
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
11.000
|
$50.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
12.000
|
$25.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
46.000
|
$25.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
12.000
|
$25.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
36.000
|
$30.000
|
$45.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
8,280.000
|
$0.600
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
20,000.000
|
$0.600
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
2,520.000
|
$1.000
|
$5.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
40,300.000
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,860.000
|
$0.250
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
36,860.000
|
$0.250
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
608.000
|
$2.750
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
29,960.000
|
$0.750
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,420.000
|
$0.200
|
$0.500
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
31.000
|
$80.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
7.000
|
$15,000.000
|
$18,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
432.000
|
$250.000
|
$225.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
648.000
|
$250.000
|
$225.000
|
|
Totals: |
$3,639,410.810
|
$5,575,721.750
|