Show Job Controls
Bid Cobra

BURNET US0281 (6327-16-001)

Items: 42

County: BURNET
Length: N/A
Highway: US0281
District: AUSTIN
Control Number: 6327-16-001
DBE Goal: N/A
Project: RMC - 632716001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $3,000,000.00
Date: 01/08/2019 (7 years ago)
Contract Number: N/A
Type: REPAIR, REPLACE AND UPGRADE MBGF
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$3,000,000.00
$2,492,603.00
Over/Under Est: -16.91% -$507,397.00
$2,784,560.00
Over/Under Est: -7.18% -$215,440.00
Amt Left: 11.71% $291,957.00

Bid Items & Bid Tabulations

42 Total 0 of 42
BURNET  |  US0281  |  AUSTIN  |  6327-16-001  |  01/08/2019  |  $3,000,000.00  |  RMC - 632716001  |  REPAIR, REPLACE AND UPGRADE MBGF  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELITE CASTLE RESOURCES LLC
K-BAR SERVICES, INC.
REMOVING CONC (RIPRAP)
SY 10.000 $22.000 $60.000 $75.000
RIPRAP (CONC)(5 IN)
CY 15.000 $350.000 $600.000 $400.000
RETROFIT RAIL (TY T221)
LF 100.000 $170.000 $100.000 $300.000
MOBILIZATION (CALLOUT)
EA 1,400.000 $200.000 $0.100 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,000.000 $20.000 $22.000 $28.000
MTL W-BEAM GD FEN (STEEL POST)
LF 3,000.000 $23.000 $20.000 $31.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 50.000 $1,200.000 $1,400.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,000.000 $3.000 $6.000 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $2,200.000 $3,000.000 $3,000.000
GUARDRAIL END TRTMNT(RETRO)(STEEL POST)
EA 25.000 $1,800.000 $100.000 $4,000.000
GUARDRAIL END TRTMNT(RETRO)(WOOD POST)
EA 25.000 $1,800.000 $2,650.000 $4,000.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 50.000 $70.000 $20.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 50.000 $35.000 $32.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 200.000 $25.000 $15.000 $70.000
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
EA 50.000 $60.000 $30.000 $65.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 50.000 $23.000 $23.000 $70.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
EA 50.000 $20.000 $25.000 $70.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 50.000 $40.000 $20.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 250.000 $23.000 $45.000 $75.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 20,500.000 $15.000 $25.000 $25.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 600.000 $30.000 $15.000 $75.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 100.000 $20.000 $25.000 $30.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 1,000.000 $100.000 $10.000 $30.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 2,300.000 $55.000 $66.000 $45.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 1,500.000 $60.000 $40.000 $120.000
REPAIR STEEL POST WITH BASE PLATE
EA 50.000 $250.000 $284.000 $200.000
REALIGN POSTS
EA 600.000 $15.000 $9.900 $30.000
REMOVE & REPLACE BLOCKOUT
EA 1,200.000 $5.000 $85.000 $20.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 10.000 $5.000 $22.600 $28.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 3.000 $5.000 $84.000 $10.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $10.000 $79.000 $10.000
REPLACE HINGED TOP SGT STEEL POST
EA 5.000 $53.000 $160.000 $350.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 35.000 $2,000.000 $5,400.000 $3,400.000
REPAIR RAIL ELEMENT (W - BEAM) (LABOR)
LF 5.000 $1,300.000 $30.000 $150.000
REPAIR SINGLE GUARDRAIL TERMINAL
EA 400.000 $1,200.000 $1,550.000 $1,800.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 10.000 $100.000 $160.000 $220.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 200.000 $20.000 $50.000 $65.000
TMA (STATIONARY)
DAY 520.000 $175.000 $400.000 $200.000
LANE CLOSURE TYPE 1 (8 HR)
EA 295.000 $1,500.000 $100.000 $300.000
LANE CLOSURE TYPE 2 (8 HR)
EA 100.000 $1,200.000 $100.000 $300.000
LANE CLOSURE TYPE 3 (8 HR)
EA 295.000 $1,500.000 $500.000 $300.000
LANE CLOSURE TYPE 4 (8 HR)
EA 10.000 $800.000 $2,000.000 $300.000
Totals: $3,000,000.000 $2,492,603.000 $2,784,560.000