Bid Cobra

BURLESON FM 2039 (0833-13-014)

Items: 95

County: BURLESON
Length: 0.2000 MILES
Highway: FM 2039
District: BRYAN
Control Number: 0833-13-014
DBE Goal: 0.0%
Project: BR 2026(258)
Guaranty: $96,000.00
Time: 209 WORKING DAYS
Engineer's Estimate: $2,394,608.45
Date: 12/02/2025 (6 months ago)
Contract Number: 12253030
Type: BRIDGE REPLACEMENT
Project ID: A00124687
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (9)
E
Engineer's Estimate
$2,394,608.45
$2,315,333.30
Over/Under Est: -3.31% -$79,275.15
$2,373,773.35
Over/Under Est: -0.87% -$20,835.10
Amt Left: 2.52% $58,440.05
Over/Under Est: 4.74% $113,573.37
Amt Left: 8.33% $192,848.52
Delta: -5.66% -$134,408.47
Over/Under Est: 8.33% $199,458.48
Amt Left: 12.04% $278,733.63
Delta: -3.42% -$85,885.11
Over/Under Est: 9.08% $217,430.00
Amt Left: 12.81% $296,705.15
Delta: -0.69% -$17,971.52
Over/Under Est: 16.2% $387,859.40
Amt Left: 20.18% $467,134.55
Delta: -6.52% -$170,429.40
Over/Under Est: 23.12% $553,661.25
Amt Left: 27.34% $632,936.40
Delta: -5.96% -$165,801.85
$3,748,865.20
Over/Under Est: 56.55% $1,354,256.75
Amt Left: 61.91% $1,433,531.90
Delta: -27.15% -$800,595.50
Over/Under Est: 77.88% $1,864,908.60
Amt Left: 83.97% $1,944,183.75
Delta: -13.62% -$510,651.85

Bid Items & Bid Tabulations

95 Total 0 of 95
BURLESON  |  FM 2039  |  BRYAN  |  0833-13-014  |  12/02/2025  |  $2,394,608.45  |  BR 2026(258)  |  BRIDGE REPL  |  209 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
STX CIVIL
TEXAS STEEL INDUSTRIAL PLACING, LLC
R CONSTRUCTION CIVIL, LLC
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
C. E. BARKER, LTD.
FUQUA CONSTRUCTION CO., INC.
PREPARING ROW
STA 13.790 $4,000.000 $910.000 $500.000 $4,000.000 $4,400.000 $4,058.000 $3,700.000 $4,500.000 $27,000.000 $9,852.440
RMV (14") TRT/UNTRT BASE & ASPH PAV
SY 2,089.000 $20.000 $14.000 $12.000 $20.000 $20.000 $6.580 $28.000 $20.000 $19.700 $9.760
EXCAV (ROADWAY)
CY 846.000 $21.000 $43.000 $35.000 $20.000 $57.000 $12.950 $42.000 $30.000 $31.510 $20.270
EMBANK (FNL)(DC)(TY C)
CY 1,295.000 $32.000 $23.000 $45.000 $25.000 $26.000 $12.600 $35.000 $30.000 $40.700 $27.920
FURN & PLACE TOPSOIL (4")
SY 4,221.000 $4.000 $3.000 $5.000 $2.500 $8.000 $1.270 $2.300 $4.000 $6.890 $2.200
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 4,221.000 $2.000 $0.750 $0.930 $0.830 $0.800 $0.570 $0.820 $1.500 $1.310 $1.410
HYDRO MULCH SEED (TEMP_WARM)
SY 2,111.000 $2.000 $0.500 $0.930 $1.000 $0.800 $0.460 $0.700 $1.000 $1.310 $1.500
HYDRO MULCH SEED (TEMP_COOL)
SY 2,111.000 $2.000 $0.750 $0.930 $1.000 $0.800 $0.610 $0.700 $1.000 $1.310 $1.500
VEGETATIVE WATERING
TGL 42.200 $67.000 $32.000 $70.000 $1.000 $250.000 $47.500 $55.000 $1.000 $164.130 $10.590
SOIL RET BLKT(SL_MOD_SAND_LONG)
SY 284.000 $3.000 $1.750 $4.350 $6.700 $4.000 $1.530 $4.000 $8.000 $6.570 $18.000
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
SY 3,036.000 $20.000 $36.000 $32.000 $30.000 $18.000 $21.500 $32.000 $45.000 $39.740 $37.540
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 21.000 $350.000 $410.000 $445.000 $370.000 $345.000 $348.000 $382.000 $400.000 $459.550 $608.770
LIME TRT (EXIST MATL)(8")
SY 1,583.000 $7.000 $14.000 $8.000 $10.000 $6.000 $8.950 $12.500 $20.000 $6.890 $8.310
CEMENT
TON 15.000 $300.000 $260.000 $235.000 $300.000 $300.000 $288.000 $242.000 $400.000 $459.550 $395.000
CEMENT TRT (EXIST MATL)(8")
SY 1,583.000 $6.000 $7.000 $5.000 $10.000 $12.000 $4.250 $6.000 $20.000 $6.890 $3.280
PRIME COAT(MC-30 OR AE-P)
GAL 586.000 $13.000 $9.250 $8.600 $8.000 $11.000 $9.950 $10.000 $15.000 $13.130 $8.640
ASPH (AC-20XP)
GAL 1,615.000 $3.500 $8.250 $4.000 $8.000 $17.000 $6.200 $3.750 $15.000 $10.500 $8.190
AGGR (TY-PB OR PL, GR-4)(SAC-A)
CY 32.000 $550.000 $740.000 $995.000 $850.000 $500.000 $272.000 $485.000 $800.000 $984.750 $274.290
SP MIXES SP-C PG64-22
TON 322.000 $200.000 $180.000 $150.000 $200.000 $230.000 $207.000 $188.000 $250.000 $242.910 $347.970
SP MIXES SP-C SAC-A PG64-22
TON 380.000 $215.000 $190.000 $180.000 $200.000 $210.000 $208.000 $197.000 $250.000 $256.040 $270.000
SP MIXES SP-C PG64-22 (LEVEL-UP)
TON 29.000 $200.000 $180.000 $140.000 $230.000 $210.000 $399.000 $235.000 $250.000 $269.170 $272.270
PLANE ASPH CONC PAV(0" TO 2")
SY 558.000 $10.000 $15.000 $25.000 $4.000 $16.000 $7.700 $9.000 $30.000 $6.570 $2.830
CEM STABIL BKFL
CY 211.000 $274.000 $130.000 $180.000 $200.000 $130.000 $99.400 $145.000 $300.000 $98.480 $280.050
TRENCH EXCAVATION PROTECTION
LF 34.000 $30.000 $1.500 $50.000 $100.000 $5.000 $625.000 $80.000 $10.000 $26.260 $13.970
TEMPORARY SPL SHORING
SF 3,611.000 $30.000 $36.000 $15.000 $28.000 $45.000 $65.000 $62.000 $20.000 $26.260 $41.970
DRILL SHAFT (24 IN)
LF 420.000 $230.000 $142.000 $250.000 $246.650 $235.000 $233.250 $270.000 $170.000 $462.830 $458.840
CL C CONC (ABUT)
CY 27.300 $1,350.000 $1,500.000 $1,000.000 $1,400.000 $1,800.000 $1,897.000 $1,975.000 $2,000.000 $2,921.430 $2,407.900
REINF CONC SLAB
SF 2,118.000 $30.000 $23.000 $28.000 $27.000 $34.000 $45.300 $49.000 $30.000 $36.760 $42.730
APPROACH SLAB
CY 65.000 $785.000 $1,000.000 $850.000 $725.000 $1,500.000 $882.900 $715.000 $900.000 $1,253.920 $1,179.680
PRESTR CONC SLAB BEAM (4SB15)
LF 396.000 $225.000 $250.000 $250.000 $285.520 $230.000 $224.450 $235.000 $305.000 $321.030 $431.640
PRESTR CONC SLAB BEAM (5SB15)
LF 99.000 $300.000 $250.000 $350.000 $348.880 $290.000 $296.000 $290.000 $305.000 $321.030 $475.600
RIPRAP (MOW STRIP)(4 IN)
CY 75.000 $700.000 $600.000 $650.000 $725.000 $565.000 $950.000 $964.000 $800.000 $771.390 $1,112.650
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,287.000 $167.000 $170.000 $175.000 $180.000 $240.000 $180.000 $170.000 $200.000 $216.150 $348.160
RAIL (TY T223)
LF 361.000 $150.000 $160.000 $185.000 $165.000 $140.000 $237.000 $180.000 $160.000 $231.420 $167.440
ARMOR JOINT (SEALED)
LF 84.000 $150.000 $99.000 $215.000 $145.000 $69.000 $101.000 $141.000 $200.000 $177.260 $198.280
CONC BOX CULV (10 FT X 10 FT)
LF 128.000 $1,400.000 $1,500.000 $1,520.000 $1,650.000 $1,300.000 $2,000.000 $1,896.000 $2,000.000 $2,571.870 $2,779.780
RC PIPE (CL III)(18 IN)
LF 83.000 $100.000 $62.000 $90.000 $60.000 $115.000 $97.000 $97.000 $80.000 $140.570 $140.790
WINGWALL (PW - 1) (HW=13 FT)
EA 1.000 $24,000.000 $96,000.000 $105,000.000 $80,000.000 $115,000.000 $77,575.000 $119,000.000 $90,000.000 $115,544.000 $141,000.000
WINGWALL (PW - 1) (HW=14 FT)
EA 1.000 $44,000.000 $110,000.000 $110,000.000 $90,000.000 $140,000.000 $84,580.000 $132,000.000 $100,000.000 $121,452.500 $198,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $1,750.000 $1,300.000 $1,250.000 $1,000.000 $1,400.000 $1,410.000 $2,075.000 $2,500.000 $2,691.650 $2,023.610
REMOV STR (WINGWALL)
EA 2.000 $2,500.000 $9,500.000 $2,600.000 $3,500.000 $2,300.000 $7,850.000 $4,276.000 $10,000.000 $17,069.000 $2,445.810
REMOV STR (PIPE)
LF 55.000 $39.000 $28.000 $22.000 $20.000 $41.000 $24.000 $56.000 $45.000 $34.140 $25.510
REMOV STR (BOX CULVERT)
LF 96.000 $500.000 $290.000 $125.000 $225.000 $95.000 $523.000 $267.000 $750.000 $607.260 $143.640
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $25,000.000 $20,000.000 $25,000.000 $50,000.000 $40,000.000 $14,400.000 $35,000.000 $30,000.000 $54,817.750 $50,477.920
REMOVING ROCK RIPRAP
LF 46.000 $55.000 $27.000 $65.000 $100.000 $24.000 $92.400 $140.000 $32.000 $20.350 $200.210
MOBILIZATION
LS 1.000 $239,500.000 $180,000.000 $185,000.000 $250,592.350 $150,000.000 $249,600.000 $317,400.000 $235,000.000 $325,000.000 $555,595.750
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $6,800.000 $2,600.000 $1,500.000 $3,000.000 $1,100.000 $5,236.000 $750.000 $11,000.000 $4,267.250 $23,643.570
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $2,100.000 $7,500.000 $20,000.000 $20,000.000 $13,000.000 $3,545.000 $22,000.000 $26,260.000 $22,121.610
TMA (STATIONARY)
DAY 18.000 $290.000 $260.000 $65.000 $250.000 $225.000 $500.000 $335.000 $300.000 $984.750 $397.500
TMA (MOBILE OPERATION)
DAY 10.000 $500.000 $710.000 $65.000 $1.000 $350.000 $900.000 $335.000 $300.000 $984.750 $345.160
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 132.000 $50.000 $50.000 $50.000 $40.000 $45.000 $41.390 $49.000 $1.000 $65.650 $67.950
ROCK FILTER DAMS (REMOVE)
LF 132.000 $19.000 $16.000 $10.000 $10.000 $16.000 $13.450 $11.000 $1.000 $26.260 $21.910
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 600.000 $36.000 $36.000 $50.000 $40.000 $70.000 $29.670 $38.000 $1.000 $39.390 $40.160
CONSTRUCTION EXITS (REMOVE)
SY 600.000 $13.000 $12.000 $10.000 $10.000 $15.000 $10.000 $13.000 $1.000 $13.130 $15.080
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,572.000 $4.750 $4.500 $5.000 $4.000 $5.500 $3.790 $3.800 $1.000 $6.570 $6.910
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,572.000 $1.000 $1.250 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000 $2.630 $1.870
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 7.000 $5,000.000 $5,500.000 $6,150.000 $6,000.000 $3,300.000 $1,090.000 $4,430.000 $5,000.000 $9,847.500 $8,791.730
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 540.000 $77.000 $64.000 $110.000 $70.000 $75.000 $28.000 $21.000 $120.000 $105.700 $91.880
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 270.000 $65.000 $13.000 $35.000 $20.000 $3.000 $11.000 $17.000 $30.000 $13.790 $11.580
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 540.000 $35.000 $13.000 $45.000 $25.000 $5.000 $28.000 $20.000 $90.000 $20.350 $42.780
DRIVEWAYS (ACP)
SY 262.000 $78.000 $45.000 $110.000 $65.000 $99.000 $58.500 $64.000 $100.000 $65.650 $94.040
TURNOUTS (ACP)
SY 41.000 $100.000 $47.000 $120.000 $100.000 $99.000 $73.700 $87.000 $100.000 $65.650 $196.550
MTL W-BEAM GD FEN (TIM POST)
LF 775.000 $27.000 $31.000 $28.000 $26.000 $24.000 $25.000 $26.000 $25.000 $32.170 $46.310
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,000.000 $2,400.000 $2,300.000 $2,000.000 $1,800.000 $2,535.000 $2,776.000 $1,600.000 $2,698.220 $3,325.560
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $285.000 $780.000 $1,800.000 $1,250.000 $2,700.000 $1,576.000 $1,765.000 $1,300.000 $2,133.630 $2,880.380
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $2,000.000 $1,600.000 $1,800.000 $1,500.000 $2,500.000 $1,630.000 $1,775.000 $1,300.000 $2,146.760 $2,382.620
MTL W-BEAM GD FEN (SPECIAL)
LF 80.000 $75.000 $31.000 $47.000 $38.000 $34.000 $41.300 $46.000 $40.000 $55.800 $180.000
REMOVE METAL BEAM GUARD FENCE
LF 162.500 $4.500 $4.000 $3.000 $3.000 $2.550 $3.000 $3.250 $2.000 $3.940 $2.300
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $450.000 $260.000 $310.000 $300.000 $170.000 $300.000 $163.000 $500.000 $196.950 $502.190
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $250.000 $330.000 $185.000 $300.000 $225.000 $163.000 $217.000 $500.000 $262.600 $491.510
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,200.000 $3,800.000 $3,750.000 $3,000.000 $3,300.000 $3,260.000 $3,353.000 $2,900.000 $4,050.610 $5,627.050
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $300.000 $330.000 $350.000 $275.000 $225.000 $300.000 $217.000 $500.000 $262.600 $314.550
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,700.000 $1,600.000 $2,130.000 $1,750.000 $1,700.000 $1,630.000 $1,910.000 $2,500.000 $2,100.800 $2,955.780
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1,100.000 $1,150.000 $1,000.000 $500.000 $490.000 $1,128.000 $1,000.000 $1,116.050 $1,753.180
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,250.000 $7,900.000 $9,400.000 $8,500.000 $6,500.000 $9,510.000 $1,910.000 $9,000.000 $9,893.460 $15,524.060
MAILBOX INSTALL-S (WC-POST) TY 3
EA 2.000 $305.000 $420.000 $500.000 $400.000 $77.000 $353.250 $342.000 $200.000 $413.600 $405.830
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 19.000 $750.000 $920.000 $720.000 $800.000 $430.000 $631.000 $668.000 $950.000 $807.500 $1,384.850
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 1.000 $700.000 $790.000 $420.000 $800.000 $115.000 $368.000 $598.000 $600.000 $722.150 $1,148.140
REMOVE SM RD SN SUP&AM
EA 14.000 $115.000 $160.000 $118.000 $150.000 $130.000 $100.000 $107.000 $150.000 $177.260 $178.920
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 8.000 $25.000 $59.000 $35.000 $30.000 $22.000 $24.000 $27.000 $40.000 $32.830 $50.390
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 23.000 $30.000 $59.000 $35.000 $30.000 $28.000 $38.000 $39.000 $30.000 $46.610 $32.370
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 240.000 $6.000 $5.250 $4.970 $4.000 $4.500 $4.350 $4.350 $4.000 $6.570 $6.770
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 3,384.000 $1.000 $1.000 $1.060 $1.000 $1.150 $0.920 $1.100 $1.000 $1.310 $1.270
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $18.000 $10.000 $9.940 $10.000 $11.000 $8.700 $11.000 $14.000 $6.570 $19.710
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 9,600.000 $1.500 $1.000 $1.060 $1.000 $1.150 $0.920 $1.100 $1.000 $1.310 $1.190
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 425.000 $1.000 $0.750 $1.550 $1.000 $1.150 $2.000 $1.100 $5.000 $6.570 $0.570
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
LF 3,170.000 $3.000 $1.750 $1.680 $1.000 $1.150 $1.470 $1.100 $1.000 $2.630 $1.010
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
LF 9,902.000 $1.900 $1.750 $1.680 $1.000 $1.150 $1.470 $1.100 $1.500 $2.630 $1.050
RE PROFILE PM TY I(Y)6"(BRK)(090MIL)
LF 570.000 $2.250 $1.750 $1.680 $1.250 $1.500 $1.470 $1.350 $1.500 $2.630 $1.070
PAVEMENT SLER 6"
LF 420.000 $3.150 $1.250 $1.240 $0.550 $0.650 $1.090 $0.600 $0.500 $2.630 $0.390
PREFAB PM TY C (W)(24")(SLD)
LF 10.000 $35.000 $39.000 $37.600 $12.000 $14.000 $33.000 $13.000 $20.000 $26.260 $21.620
REFL PAV MRKR TY II-A-A
EA 155.000 $7.000 $6.750 $6.530 $4.500 $5.000 $5.700 $4.900 $5.000 $19.700 $6.340
ELIM EXT PM & MRKS (4")
LF 500.000 $0.250 $1.250 $1.240 $0.950 $1.150 $1.090 $1.000 $1.000 $1.310 $0.330
PAV SURF PREP FOR MRK (6")
LF 420.000 $0.750 $0.250 $0.310 $0.650 $0.800 $0.270 $0.700 $0.700 $1.310 $0.630
BONDING COURSE
GAL 707.000 $8.000 $8.250 $6.000 $6.000 $8.000 $5.000 $4.550 $8.000 $65.650 $6.870
Totals: $2,394,608.450 $2,315,333.300 $2,373,773.350 $2,508,181.820 $2,594,066.925 $2,612,038.450 $2,782,467.845 $2,948,269.700 $3,748,865.195 $4,259,517.046