BROWN US0067 (6335-72-001)

Items: 28

County: BROWN
Length: N/A
Highway: US0067
District: BROWNWOOD
Control Number: 6335-72-001
DBE Goal: N/A
Project: RMC - 633572001
Guaranty: N/A
Time: 100 W
Engineer's Estimate: $286,602.50
Date: 12/19/2019 (6 years ago)
Contract Number: N/A
Type: BRIDGE AND CONCRETE REPAIR (CALL-OUT)
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$286,602.50
Over/Under Est: 112.35% $321,997.50

Bid Items & Bid Tabulations

28 Total 0 of 28
BROWN  |  US0067  |  BROWNWOOD  |  6335-72-001  |  12/19/2019  |  $286,602.50  |  RMC - 633572001  |  BRIDGE AND CONC REPAIR (CALL-OUT)  |  100 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
GHB EQUIPMENT COMPANY, L.L.C.
REMOVING CONC (RIPRAP)
SY 225.000 $28.800 $100.000
EXCAVATION (CHANNEL)
CY 120.000 $41.200 $100.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 145.000 $32.800 $100.000
FLOWABLE BACKFILL
CY 110.000 $244.000 $310.000
TRENCH EXCAVATION PROTECTION
LF 40.000 $35.000 $200.000
CL C CONC (MISC)
CY 20.000 $800.000 $1,500.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 70.000 $176.200 $300.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 35.000 $210.800 $250.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 70.000 $146.000 $120.000
CONC STR REPAIR (STANDARD)
SF 45.000 $120.000 $120.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 5.000 $1,076.000 $3,000.000
RIPRAP (CONC)(4 IN)
CY 10.000 $600.000 $700.000
RIPRAP (CONC)(5 IN)
CY 45.000 $573.000 $600.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 45.000 $229.000 $600.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 195.000 $30.000 $60.000
SET (REPLACE PIPE RUNNER ASSEMBLY)
EA 5.000 $900.000 $5,000.000
SET (REPLACE PIPE RUNNER)
EA 10.000 $600.000 $5,000.000
REMOV STR (HEADWALL)
EA 10.000 $1,800.000 $3,000.000
MOBILIZATION
LS 1.000 $26,553.000 $50,000.000
MOBILIZATION (CALLOUT)
EA 4.000 $2,500.000 $15,000.000
CONC CURB & GUTTER (TY II)
LF 75.000 $50.700 $120.000
CONC SIDEWALKS (4")
SY 25.000 $65.000 $110.000
CURB RAMPS
SY 25.000 $400.000 $200.000
CONCRETE RAIL REPAIR (MISC)
LF 45.000 $150.000 $300.000
BRIDGE JOINT REPAIR (FULL DEPTH)
LF 40.000 $720.000 $600.000
BRIDGE JOINT REPAIR (PARTIAL DEPTH)
LF 40.000 $200.000 $550.000
ASPHALT PLUG EXP JOINT
CF 15.000 $580.000 $1,000.000
TMA (STATIONARY)
DAY 20.000 $240.000 $2,500.000
Totals: $286,602.500 $608,600.000