BROWN US0067 (6313-96-001)

Items: 26

County: BROWN
Length: N/A
Highway: US0067
District: BROWNWOOD
Control Number: 6313-96-001
DBE Goal: N/A
Project: RMC - 631396001
Guaranty: N/A
Time: 150 W
Engineer's Estimate: $668,103.44
Date: 06/07/2017 (9 years ago)
Contract Number: N/A
Type: BRIDGE AND CONCRETE WORK (WILL-CALL)
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$668,103.44
$711,915.00
Over/Under Est: 6.56% $43,811.56
Over/Under Est: 111.15% $742,596.56
Amt Left: 98.16% $698,785.00
Over/Under Est: 121.23% $809,946.56
Amt Left: 107.62% $766,135.00
Delta: -4.77% -$67,350.00

Bid Items & Bid Tabulations

26 Total 0 of 26
BROWN  |  US0067  |  BROWNWOOD  |  6313-96-001  |  06/07/2017  |  $668,103.44  |  RMC - 631396001  |  BRIDGE AND CONC WORK (WILL-CALL)  |  150 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
L.C. JORDAN & SON
CHAMPION INFRASTRUCTURE, LLC
SCR CIVIL CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 300.000 $30.730 $25.000 $180.000 $100.000
EXCAVATION (CHANNEL)
CY 200.000 $30.380 $20.000 $90.000 $150.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 150.000 $45.360 $40.000 $80.000 $100.000
FLOWABLE BACKFILL
CY 200.000 $277.800 $250.000 $320.000 $500.000
TRENCH EXCAVATION PROTECTION
LF 40.000 $31.430 $1.000 $80.000 $30.000
CL C CONC (MISC)
CY 30.000 $713.640 $1,200.000 $900.000 $2,000.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 75.000 $267.500 $250.000 $600.000 $200.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 40.000 $85.160 $300.000 $900.000 $200.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 75.000 $247.020 $200.000 $240.000 $240.000
CONC STR REPAIR (STANDARD)
SF 50.000 $156.110 $200.000 $230.000 $240.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 20.000 $75.000 $2,000.000 $1,500.000 $5,300.000
RIPRAP (CONC)(5 IN)
CY 300.000 $525.890 $450.000 $780.000 $900.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 100.000 $211.620 $300.000 $380.000 $375.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 250.000 $25.930 $40.000 $60.000 $70.000
SET (REPLACE PIPE RUNNER ASSEMBLY)
EA 60.000 $425.000 $900.000 $1,200.000 $2,000.000
SET (REPLACE PIPE RUNNER)
EA 30.000 $1,250.000 $600.000 $800.000 $2,000.000
REMOV STR (HEADWALL)
EA 25.000 $1,028.730 $750.000 $5,000.000 $2,000.000
MOBILIZATION
LS 1.000 $62,000.000 $65,000.000 $60,000.000 $147,000.000
MOBILIZATION (CALLOUT)
EA 8.000 $1,342.330 $3,500.000 $10,000.000 $14,000.000
CONC CURB & GUTTER (TY II)
LF 100.000 $31.100 $125.000 $280.000 $120.000
CONC SIDEWALKS (4")
SY 30.000 $55.310 $75.000 $700.000 $400.000
CURB RAMPS
SY 30.000 $114.040 $200.000 $1,200.000 $470.000
CONCRETE RAIL REPAIR (MISC)
LF 50.000 $280.000 $400.000 $600.000 $460.000
BRIDGE JOINT REPAIR (FULL DEPTH)
LF 50.000 $150.000 $250.000 $1,600.000 $630.000
BRIDGE JOINT REPAIR (PARTIAL DEPTH)
LF 125.000 $325.000 $175.000 $900.000 $325.000
ASPHALT PLUG EXP JOINT
CF 175.000 $567.390 $450.000 $780.000 $775.000
Totals: $668,103.440 $711,915.000 $1,410,700.000 $1,478,050.000