Show Job Controls
Bid Cobra

BROWN US0377 (6312-64-001)

Items: 61

County: BROWN
Length: N/A
Highway: US0377
District: BROWNWOOD
Control Number: 6312-64-001
DBE Goal: N/A
Project: RMC - 631264001
Guaranty: N/A
Time: 150 W
Engineer's Estimate: $515,005.00
Date: 03/08/2017 (9 years ago)
Contract Number: N/A
Type: WILL-CALL TRAFFIC SIGNAL MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$515,005.00
Over/Under Est: 9.96% $51,289.23
Over/Under Est: 27.68% $142,570.00
Amt Left: 16.12% $91,280.77

Bid Items & Bid Tabulations

61 Total 0 of 61
BROWN  |  US0377  |  BROWNWOOD  |  6312-64-001  |  03/08/2017  |  $515,005.00  |  RMC - 631264001  |  WILL-CALL TRAF SIGNAL MAINT  |  150 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
AMERICAN LIGHTING AND SIGNALIZATION, INC.
WILLIS ELECTRIC CO., LP
REMOVING CONC (SIDEWALKS)
SY 50.000 $23.000 $14.560 $30.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 40.000 $142.000 $198.270 $275.000
CL C CONC (MISC)
CY 5.000 $695.000 $317.300 $500.000
MOBILIZATION (CALLOUT)
EA 25.000 $575.000 $897.300 $4,500.000
CONC SIDEWALKS (5")
SY 50.000 $82.000 $149.490 $20.000
CONDT (PVC) (SCH 80) (2")
LF 5,000.000 $7.000 $9.000 $5.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 500.000 $19.000 $18.570 $20.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 150.000 $28.000 $25.050 $30.000
CONDT (RM) (1 1/2")
LF 150.000 $17.000 $22.950 $35.000
ELEC CONDR (NO.10) INSULATED
LF 3,000.000 $1.600 $0.970 $0.750
ELEC CONDR (NO.6) BARE
LF 10,000.000 $1.000 $1.140 $1.000
ELEC CONDR (NO.6) INSULATED
LF 20,000.000 $1.200 $1.160 $1.100
RELOCATE LRSA
EA 3.000 $1,900.000 $2,872.120 $2,500.000
VEH SIG SEC (12")LED(HOUSING ONLY)
EA 16.000 $500.000 $390.580 $500.000
PED SIG SEC (LED)(2 INDICATIONS)
EA 30.000 $200.000 $359.350 $100.000
PED SIG SEC (HOUSING ONLY)
EA 4.000 $225.000 $279.070 $350.000
BACK PLATE (12")(3 SEC)
EA 30.000 $72.000 $77.250 $75.000
BACK PLATE (12")(4 SEC)
EA 2.000 $90.000 $90.270 $100.000
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 8.000 $1,200.000 $1,504.150 $1,200.000
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 8.000 $350.000 $743.640 $450.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 10.000 $1,900.000 $1,675.080 $1,400.000
INS TRF SIG PL AM (STRAN)(INSTLL ONLY)
EA 3.000 $750.000 $748.510 $1,200.000
REMOVAL OF GROUND BOXES
EA 3.000 $75.000 $400.020 $300.000
REPLACE OF GROUND BOXES
EA 3.000 $750.000 $982.940 $1,300.000
INSTALL OF GROUND BOXES
EA 20.000 $750.000 $859.090 $1,100.000
REPLACE OF CABLES
LF 2,000.000 $5.000 $4.820 $5.000
REMOVAL OF SPAN CABLE ASSM
LF 450.000 $1.500 $2.040 $1.500
INSTALL OF SPAN CABLE ASSM
LF 450.000 $3.000 $4.080 $4.000
REPLACE OF ELECTRICAL SERVICE
EA 3.000 $1,750.000 $1,969.810 $1,750.000
INSTALL OF ELECTRICAL SERVICE
EA 5.000 $2,500.000 $3,685.380 $3,000.000
REPLACE OF SIGNAL HEAD ASSM
EA 12.000 $500.000 $588.820 $600.000
INSTALL OF SIGNAL HEAD ASSM
EA 3.000 $500.000 $586.260 $750.000
REPLACE OF SIGNAL RELATED SIGNS
EA 8.000 $75.000 $303.260 $200.000
INSTALL OF FND FOR GROUND MNT CABINETS
EA 2.000 $2,500.000 $2,670.100 $2,500.000
REPLACE OF CONTROL CABINET(GRND MNT)
EA 4.000 $3,000.000 $3,005.760 $2,500.000
REPLACE OF CONTROL CABINET(POLE MNT)
EA 3.000 $3,000.000 $3,024.340 $2,500.000
REPLACE OF FLASHER CABINET
EA 3.000 $350.000 $728.450 $350.000
REPLACE OF SIGNAL POLE ASSM
EA 2.000 $1,000.000 $1,952.900 $3,500.000
REMOVAL OF CONCRETE FOUNDATIONS
EA 5.000 $250.000 $964.440 $500.000
REPLACE OF LUMINAIRE HEAD
EA 70.000 $300.000 $297.360 $300.000
INSTALL OF LUMINAIRE HEAD
EA 2.000 $160.000 $542.800 $300.000
INSTALL OF LUMINAIRE MAST ARMS
EA 2.000 $160.000 $507.400 $650.000
INS OF TRF SIG PL FND (36" DRIL SHFT)
LF 36.000 $175.000 $354.260 $500.000
REPLACE PED POLE ASSM
EA 2.000 $400.000 $856.090 $500.000
REPLACE LED TRAF SIG LAMP UNIT
EA 10.000 $288.000 $226.560 $300.000
INSTALL SCREW-IN FND
EA 15.000 $325.000 $517.120 $500.000
VIVDS CABLE (INSTALL)
LF 2,500.000 $2.000 $1.930 $2.000
VIVDS CAMERA (INSTALL)
EA 250.000 $250.000 $243.080 $250.000
REPL VEH SIG TUNNEL VISOR (12")
EA 20.000 $50.000 $46.020 $50.000
WRAP SIGNAL CABLE
LF 100.000 $1.000 $4.900 $5.000
INSTALL ELECTRICAL SPLICE
EA 50.000 $57.000 $57.650 $100.000
INSTALL ROADWAY ILLUM ASSEMBLY (HPS)
EA 10.000 $775.000 $587.640 $700.000
INSTALL ROADWAY ILLUM ASSEMBLY (LED)
EA 30.000 $775.000 $697.380 $700.000
REPLACE HIGH MAST LUMINAIRES
EA 40.000 $245.000 $166.970 $100.000
INSTALL FOUNDATION
EA 40.000 $1,500.000 $1,755.650 $2,250.000
REMOVE FOUNDATION
EA 3.000 $350.000 $800.040 $500.000
REPLACE FUSE
EA 60.000 $37.000 $36.880 $50.000
REPLACE FUSE HOLDER
EA 50.000 $80.000 $114.290 $250.000
RAISE AND LOWER RING (HIGH MAST LIGHT)
EA 28.000 $415.000 $130.980 $300.000
REPLACE LAMP FOR POLE MNT FIXTURE
EA 60.000 $95.000 $73.160 $75.000
REPLACE LAMP FOR HIGH MAST FIXTRE 400W
EA 200.000 $103.000 $74.340 $75.000
Totals: $515,005.000 $566,294.230 $657,575.000