Show Job Controls
Bid Cobra

BROWN FM 2632 (2570-01-011)

Items: 68

County: BROWN
Length: N/A
Highway: FM 2632
District: BROWNWOOD
Control Number: 2570-01-011
DBE Goal: N/A
Project: STP 2022(708)HES
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $2,849,471.84
Date: 06/30/2022 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,849,471.84
Over/Under Est: 12.19% $347,452.23
$3,311,407.40
Over/Under Est: 16.21% $461,935.56
Amt Left: 3.58% $114,483.33

Bid Items & Bid Tabulations

68 Total 0 of 68
BROWN  |  FM 2632  |  BROWNWOOD  |  2570-01-011  |  06/30/2022  |  $2,849,471.84  |  STP 2022(708)HES  |  HAZARD ELIM & SAFETY  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAY MILLS CONTRACTING, INCORPORATED
PRATER DIRT WORK LLC
PREPARING ROW
STA 123.000 $479.430 $1,100.000 $850.000
EXCAVATION (ROADWAY)
CY 12,139.000 $12.000 $25.000 $13.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 12,066.000 $10.000 $25.000 $13.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 57,895.000 $0.660 $0.310 $0.500
BROADCAST SEED (TEMP) (WARM)
SY 27,281.000 $0.620 $0.310 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 27,281.000 $0.620 $0.310 $0.500
VEGETATIVE WATERING
MG 1,236.000 $25.700 $20.000 $8.000
PROOF ROLLING
HR 44.000 $100.000 $120.000 $200.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 17,048.000 $60.000 $45.000 $55.000
EMULS ASPH (BS OR SUBGR TRT)(AE-P)
GAL 13,732.000 $0.500 $7.000 $15.000
ASPH (AC-20-5TR)
GAL 19,891.000 $5.000 $6.000 $7.500
AGGR(TY-B GR-4 SAC-B)
CY 385.000 $120.000 $105.000 $150.000
AGGR(TY-PB GR-3 SAC-B)
CY 525.000 $140.000 $130.000 $290.000
ASPH (CRS-2 OR CRS-2H OR CRS2P)
GAL 19,218.000 $5.000 $5.750 $7.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 44.000 $50.000 $150.000 $200.000
PLANE ASPH CONC PAV(0" TO 3")
SY 32,732.000 $2.500 $4.750 $3.200
FLOWABLE BACKFILL
CY 16.000 $200.000 $200.000 $360.000
TRENCH EXCAVATION PROTECTION
LF 96.000 $15.000 $5.000 $24.000
RIPRAP (CONC)(5 IN)
CY 11.000 $700.000 $700.000 $1,440.000
CMP AR (GAL STL DES 2)
LF 96.000 $70.000 $65.000 $100.000
CMP AR (GAL STL DES 3)
LF 54.000 $80.000 $80.000 $150.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 37.000 $600.000 $1,050.000 $1,100.000
RC PIPE (CL III)(30 IN)
LF 56.000 $153.160 $140.000 $205.000
RC PIPE (CL III)(36 IN)
LF 166.000 $218.000 $195.000 $250.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 1.000 $6,000.000 $9,000.000 $9,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 4.000 $7,000.000 $11,000.000 $7,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (C)
EA 1.000 $10,000.000 $20,000.000 $18,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 2.000 $2,800.000 $2,000.000 $4,000.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 3.000 $4,700.000 $2,100.000 $4,400.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 3.000 $5,000.000 $3,000.000 $4,600.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 6.000 $1,500.000 $1,500.000 $2,400.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 4.000 $2,000.000 $2,200.000 $3,000.000
REMOV STR (PIPE)
LF 341.000 $10.550 $15.000 $25.000
MOBILIZATION
LS 1.000 $250,000.000 $300,000.000 $190,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $12,000.000 $14,000.000 $8,000.000
ROCK FILTER DAMS (REMOVE)
LF 180.000 $8.000 $22.250 $40.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000 $2.760 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000 $0.830 $1.250 $1.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 900.000 $5.450 $7.250 $7.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 900.000 $1.550 $1.250 $1.500
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
LF 180.000 $30.000 $67.000 $65.000
CONC CURB & GUTTER (TY I)
LF 597.000 $23.000 $45.000 $60.000
DRIVEWAYS (CONC)
SY 57.000 $83.000 $150.000 $150.000
TURNOUTS (SURF TREAT)
SY 529.000 $33.000 $30.000 $145.000
DRIVEWAYS (BASE)
SY 446.000 $20.000 $18.000 $50.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 5.000 $232.250 $300.000 $500.000
GROUND BOX TY BATTERY (162915)W/APRON
EA 2.000 $4,000.000 $3,000.000 $4,500.000
ALUMINUM SIGNS (TY A)
SF 20.000 $200.000 $60.000 $72.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $500.000 $905.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,000.000 $1,200.000 $1,400.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $850.000 $1,500.000 $1,600.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $500.000 $780.000 $900.000
REMOVE SM RD SN SUP&AM
EA 16.000 $89.000 $390.000 $150.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 22.000 $79.000 $75.000 $150.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,210.000 $1.000 $2.000 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 64.000 $8.000 $16.000 $12.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 24,535.000 $0.280 $0.500 $0.700
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,160.000 $0.280 $0.580 $0.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 10,565.000 $0.250 $0.500 $0.700
REFL PAV MRKR TY II-A-A
EA 313.000 $3.000 $6.700 $7.000
VEH SIG SEC (12")LED(YEL)
EA 2.000 $500.000 $430.000 $600.000
VEH SIG SEC (12")LED(RED)
EA 2.000 $500.000 $430.000 $600.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $8,000.000 $15,000.000 $16,000.000
D-GR HMA TY-B PG64-22
TON 947.000 $300.000 $155.000 $180.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $75.000 $95.000 $300.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 240.000 $15.000 $9.000 $9.000
TMA (STATIONARY)
DAY 170.000 $150.000 $280.000 $350.000
TMA (MOBILE OPERATION)
DAY 25.000 $150.000 $280.000 $350.000
Totals: $2,849,471.840 $3,196,924.070 $3,311,407.400