REMOVING CONC (DRIVEWAYS)
|
SY
|
34.000
|
$60.000
|
$25.000
|
$20.000
|
$50.000
|
$150.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
200.000
|
$15.000
|
$8.000
|
$13.000
|
$50.000
|
$50.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,197.000
|
$25.000
|
$22.000
|
$25.000
|
$20.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,320.000
|
$25.000
|
$22.000
|
$27.000
|
$40.000
|
$25.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
42,378.000
|
$0.600
|
$0.420
|
$0.100
|
$0.500
|
$0.400
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
21,189.000
|
$0.500
|
$0.730
|
$0.100
|
$0.500
|
$0.300
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
21,189.000
|
$0.750
|
$0.750
|
$0.100
|
$0.500
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
1,109.000
|
$20.000
|
$17.000
|
$10.000
|
$20.000
|
$20.000
|
|
|
PROOF ROLLING
|
HR
|
6.000
|
$115.000
|
$140.000
|
$1,000.000
|
$150.000
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
7,748.000
|
$70.000
|
$52.000
|
$69.000
|
$58.000
|
$88.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
5,792.000
|
$8.000
|
$6.000
|
$9.000
|
$6.000
|
$7.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
34,889.000
|
$6.000
|
$5.500
|
$6.200
|
$6.000
|
$5.250
|
|
|
ASPH (CRS-2)
|
GAL
|
9,443.000
|
$6.000
|
$5.000
|
$6.250
|
$6.000
|
$5.000
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
232.000
|
$120.000
|
$110.000
|
$255.000
|
$300.000
|
$250.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
750.000
|
$120.000
|
$140.000
|
$156.000
|
$300.000
|
$160.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
161.000
|
$160.000
|
$140.000
|
$325.000
|
$300.000
|
$260.000
|
|
|
PLAN & TEXT CONC PAV(0" TO 1-1/2")
|
SY
|
1,105.000
|
$10.000
|
$6.000
|
$7.100
|
$20.000
|
$10.000
|
|
|
CL C CONC (CULV)
|
CY
|
12.200
|
$1,850.000
|
$2,420.000
|
$2,350.000
|
$2,000.000
|
$3,500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
17.500
|
$2,000.000
|
$770.000
|
$730.000
|
$550.000
|
$850.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
31.800
|
$650.000
|
$770.000
|
$655.000
|
$550.000
|
$950.000
|
|
|
CMP AR (GAL STL DES 2)
|
LF
|
54.000
|
$100.000
|
$88.000
|
$170.000
|
$150.000
|
$125.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
66.000
|
$100.000
|
$104.500
|
$185.000
|
$180.000
|
$150.000
|
|
|
CMP AR (GAL STL DES 6)
|
LF
|
87.000
|
$300.000
|
$231.000
|
$305.000
|
$225.000
|
$325.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
34.000
|
$2,000.000
|
$1,045.000
|
$1,055.000
|
$1,000.000
|
$1,500.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
9.000
|
$2,500.000
|
$1,650.000
|
$2,100.000
|
$2,000.000
|
$3,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
4.000
|
$15,000.000
|
$6,710.000
|
$16,850.000
|
$15,000.000
|
$25,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
2.000
|
$15,000.000
|
$10,230.000
|
$11,500.000
|
$17,500.000
|
$30,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
4.000
|
$20,000.000
|
$11,220.000
|
$17,500.000
|
$35,000.000
|
$27,000.000
|
|
|
SET (TY II) (DES 2) (CMP) (6: 1) (P)
|
EA
|
6.000
|
$6,000.000
|
$1,710.500
|
$2,800.000
|
$3,500.000
|
$3,250.000
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (C)
|
EA
|
2.000
|
$7,500.000
|
$2,230.000
|
$3,855.000
|
$3,850.000
|
$4,000.000
|
|
|
SET (TY II) (DES 6) (CMP) (4: 1) (C)
|
EA
|
12.000
|
$5,000.000
|
$8,800.000
|
$10,500.000
|
$6,500.000
|
$4,500.000
|
|
|
SET (TY II) (DES 6) (CMP) (6: 1) (C)
|
EA
|
4.000
|
$5,000.000
|
$11,000.000
|
$11,250.000
|
$7,500.000
|
$5,500.000
|
|
|
REMOV STR (PIPE)
|
EA
|
1.000
|
$500.000
|
$550.000
|
$3,100.000
|
$500.000
|
$5,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$270,000.000
|
$250,000.000
|
$260,000.000
|
$300,000.000
|
$375,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$7,500.000
|
$16,000.000
|
$15,000.000
|
$8,500.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
420.000
|
$20.000
|
$22.000
|
$25.000
|
$15.000
|
$25.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,430.000
|
$7.000
|
$6.180
|
$3.000
|
$4.000
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,430.000
|
$2.000
|
$1.100
|
$1.000
|
$2.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,220.000
|
$7.000
|
$6.080
|
$10.000
|
$18.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,220.000
|
$2.000
|
$1.100
|
$4.000
|
$9.000
|
$2.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
|
LF
|
420.000
|
$75.000
|
$90.000
|
$52.000
|
$40.000
|
$100.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
215.000
|
$50.000
|
$66.000
|
$48.000
|
$55.000
|
$75.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
75.000
|
$50.000
|
$66.000
|
$49.000
|
$65.000
|
$60.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,359.000
|
$60.000
|
$45.000
|
$54.000
|
$45.000
|
$150.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
17.000
|
$250.000
|
$190.000
|
$145.000
|
$85.000
|
$125.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,244.000
|
$40.000
|
$32.000
|
$46.000
|
$45.000
|
$60.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
312.000
|
$40.000
|
$32.000
|
$48.000
|
$45.000
|
$60.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
2,800.000
|
$1.250
|
$0.550
|
$1.100
|
$0.500
|
$0.750
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
5,600.000
|
$1.250
|
$0.550
|
$1.250
|
$0.500
|
$1.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,725.000
|
$42.000
|
$33.550
|
$27.000
|
$40.000
|
$40.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
50.000
|
$50.000
|
$28.050
|
$30.000
|
$45.000
|
$35.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,558.000
|
$5.000
|
$2.750
|
$2.000
|
$3.000
|
$10.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,500.000
|
$3,190.000
|
$3,300.000
|
$2,850.000
|
$4,500.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
13.000
|
$800.000
|
$26.400
|
$550.000
|
$850.000
|
$800.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
11.000
|
$300.000
|
$341.000
|
$280.000
|
$850.000
|
$500.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
130.000
|
$20.000
|
$33.000
|
$30.000
|
$40.000
|
$40.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
165.000
|
$35.000
|
$71.500
|
$65.000
|
$85.000
|
$80.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
4.000
|
$2,500.000
|
$1,980.000
|
$1,800.000
|
$1,100.000
|
$3,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
112.000
|
$50.000
|
$32.000
|
$140.000
|
$40.000
|
$40.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
17.000
|
$750.000
|
$880.000
|
$1,400.000
|
$1,150.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$1,000.000
|
$935.000
|
$2,900.000
|
$1,150.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$1,155.000
|
$2,240.000
|
$1,150.000
|
$1,500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$600.000
|
$660.000
|
$1,200.000
|
$8,500.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
25.000
|
$200.000
|
$110.000
|
$650.000
|
$100.000
|
$300.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
30.000
|
$30.000
|
$22.000
|
$45.000
|
$100.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
2.000
|
$90.000
|
$146.300
|
$110.000
|
$100.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
36,040.000
|
$0.500
|
$0.400
|
$0.600
|
$0.750
|
$1.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,408.000
|
$1.500
|
$2.000
|
$2.500
|
$6.000
|
$3.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
187.000
|
$1.500
|
$1.930
|
$2.420
|
$6.000
|
$1.250
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
63.000
|
$1.500
|
$2.200
|
$2.710
|
$8.000
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,203.000
|
$1.500
|
$0.880
|
$1.350
|
$8.000
|
$1.750
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
92.000
|
$5.000
|
$20.900
|
$9.840
|
$20.000
|
$10.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
253.000
|
$1.250
|
$1.050
|
$0.930
|
$1.600
|
$2.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
6,168.000
|
$1.250
|
$0.670
|
$0.930
|
$1.600
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
505.000
|
$1.250
|
$0.670
|
$0.930
|
$1.600
|
$2.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
10,232.000
|
$1.250
|
$0.670
|
$0.930
|
$1.600
|
$2.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
36,040.000
|
$1.500
|
$1.020
|
$1.520
|
$1.600
|
$2.500
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
3,144.000
|
$1.500
|
$1.100
|
$1.750
|
$1.600
|
$2.500
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
16,068.000
|
$1.500
|
$1.020
|
$1.430
|
$1.600
|
$2.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$230.000
|
$330.000
|
$339.000
|
$250.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
2.000
|
$500.000
|
$924.000
|
$701.000
|
$250.000
|
$500.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
4.000
|
$230.000
|
$396.000
|
$448.000
|
$250.000
|
$400.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
80.000
|
$7.000
|
$5.500
|
$5.220
|
$5.000
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
912.000
|
$7.000
|
$5.500
|
$5.240
|
$5.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
187.000
|
$2.000
|
$1.650
|
$21.000
|
$2.000
|
$10.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
14.000
|
$300.000
|
$269.500
|
$245.000
|
$350.000
|
$400.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
510.000
|
$3.000
|
$2.920
|
$2.650
|
$4.000
|
$3.250
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
4.000
|
$7,500.000
|
$7,700.000
|
$7,000.000
|
$10,000.000
|
$12,000.000
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$1,500.000
|
$1,023.000
|
$930.000
|
$2,500.000
|
$1,200.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
3.000
|
$12,500.000
|
$8,360.000
|
$22,800.000
|
$12,500.000
|
$15,000.000
|
|
|
SP MIXES SP-D SAC-B PG76-22
|
TON
|
813.000
|
$160.000
|
$170.000
|
$205.000
|
$140.000
|
$200.000
|
|
|
BONDING COURSE
|
GAL
|
1,380.000
|
$5.000
|
$6.000
|
$3.900
|
$8.000
|
$10.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
400.000
|
$25.000
|
$16.500
|
$8.000
|
$10.000
|
$22.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
550.000
|
$5.000
|
$10.250
|
$8.000
|
$10.000
|
$10.000
|
|
|
TMA (STATIONARY)
|
DAY
|
216.000
|
$300.000
|
$205.000
|
$60.000
|
$250.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
240.000
|
$70.000
|
$21.000
|
$75.000
|
$55.000
|
$30.000
|
|
Totals: |
$3,043,466.050
|
$2,672,280.790
|
$3,189,248.210
|
$3,262,773.000
|
$3,942,414.850
|