BROWN VA (0923-06-095)

Items: 60

County: BROWN
Length: N/A
Highway: VA
District: BROWNWOOD
Control Number: 0923-06-095
DBE Goal: 350.0%
Project: STP 2023(213)TAPS
Guaranty: N/A
Time: 93 WORKING DAYS
Engineer's Estimate: $1,247,284.42
Date: 12/06/2023 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,247,284.42
1
$1,054,719.19
Over/Under Est: -15.44% -$192,565.23
$1,199,247.87
Over/Under Est: -3.85% -$48,036.55
Amt Left: 13.7% $144,528.68
$1,226,571.38
Over/Under Est: -1.66% -$20,713.04
Amt Left: 16.29% $171,852.19
Delta: -2.28% -$27,323.51
$1,270,591.20
Over/Under Est: 1.87% $23,306.78
Amt Left: 20.47% $215,872.01
Delta: -3.59% -$44,019.82
$1,509,837.60
Over/Under Est: 21.05% $262,553.18
Amt Left: 43.15% $455,118.41
Delta: -18.83% -$239,246.40
Subcontractor Percentage Amount
VACA UNDERGROUND UTILITIES INC 6.19% $65,287.12
D. I. J. CONSTRUCTION, INC. 1.51% $15,926.26
AWP SAFETY 0.58% $6,117.37
Total: 8.28% $87,330.75

Bid Items & Bid Tabulations

60 Total 0 of 60
BROWN  |  VA  |  BROWNWOOD  |  0923-06-095  |  12/06/2023  |  $1,247,284.42  |  STP 2023(213)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  93 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
3LW CIVIL LLC
DUNN SERVICES, INC.
TI-ZACK CONCRETE, INC.
ENCINO LANDSCAPE, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
AC 1.250 $42,222.400 $2,560.000 $30,000.000 $16,500.000 $10,000.000 $100,000.000
REMOVING CONC (MEDIANS)
SY 55.000 $33.000 $25.000 $35.790 $15.000 $25.000 $100.000
REMOVING CONC (MISC)
SY 27.500 $37.700 $25.000 $45.000 $30.000 $25.000 $100.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 238.500 $11.650 $11.650 $9.630 $35.000 $20.000 $20.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
CY 70.000 $77.830 $40.000 $60.000 $100.000 $50.000 $100.000
SPEC EXCAV WORK (VEHICLE)
CY 1,000.000 $58.330 $1.000 $200.000 $6.000 $25.000 $100.000
BLOCK SODDING
SY 680.000 $10.670 $1.000 $6.000 $11.000 $10.000 $20.000
VEGETATIVE WATERING
MG 303.000 $79.540 $10.000 $30.000 $1.000 $1.000 $50.000
HMCL ACP TY-D SAC-B AC-1.5
TON 20.000 $150.000 $300.000 $225.000 $400.000 $400.000 $1,000.000
RIPRAP (CONC)(4 IN)
CY 8.400 $947.500 $785.710 $751.710 $900.000 $1,000.000 $650.000
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 9.100 $203.000 $850.000 $220.000 $80.000 $1,000.000 $185.000
RIPRAP (CONC)(FLUME)
CY 20.410 $1,092.500 $688.000 $772.670 $1,000.000 $1,000.000 $650.000
RAIL (HANDRAIL)(TY E)
LF 77.000 $180.000 $245.000 $200.000 $165.000 $200.000 $250.000
RC PIPE (CL III)(12 IN)
LF 64.000 $76.310 $72.340 $68.000 $165.000 $125.000 $155.000
RC PIPE (CL III)(18 IN)
LF 96.000 $107.130 $75.530 $100.000 $220.000 $150.000 $200.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 1.000 $13,000.000 $7,600.000 $4,600.000 $16,500.000 $4,000.000 $12,500.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 2.000 $537.580 $1,525.000 $1,200.000 $3,000.000 $1,500.000 $2,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $2,933.570 $1,755.000 $1,700.000 $4,000.000 $2,500.000 $2,200.000
MOBILIZATION
LS 1.000 $106,715.640 $105,000.000 $112,371.270 $150,000.000 $200,000.000 $146,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $9,545.190 $30,000.000 $11,000.000 $4,400.000 $7,500.000 $20,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,262.400 $6.180 $0.100 $4.850 $0.010 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,262.400 $2.350 $0.100 $1.620 $0.010 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 452.100 $8.180 $0.010 $6.900 $0.010 $10.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 452.100 $2.270 $0.010 $2.110 $0.010 $1.000 $9.000
COLORED TEXTURED CONC (4")
SY 150.000 $190.000 $100.000 $125.050 $150.000 $200.000 $250.000
CONC CURB (TY II)
LF 350.000 $61.000 $43.430 $45.610 $55.000 $30.000 $55.000
CONC CURB & GUTTER (TY II)
LF 770.000 $62.900 $47.000 $60.160 $55.000 $40.000 $65.000
DRIVEWAYS (CONC)
SY 9.000 $144.430 $250.000 $115.000 $150.000 $200.000 $125.000
DRIVEWAYS (ACP)
SY 959.200 $69.080 $135.000 $87.070 $90.000 $100.000 $75.000
CONC SIDEWALKS (4")
SY 3,720.000 $108.400 $82.000 $85.000 $135.000 $120.000 $100.000
CONC SIDEWALKS (6")
SY 425.300 $114.830 $106.030 $119.280 $170.000 $150.000 $95.000
CURB RAMPS (TY 1)
EA 8.000 $2,825.000 $1,800.000 $2,425.150 $2,400.000 $2,000.000 $3,250.000
CURB RAMPS (TY 2)
EA 3.000 $3,925.000 $1,920.000 $2,202.500 $2,400.000 $2,000.000 $3,250.000
CURB RAMPS (TY 5)
EA 3.000 $3,484.300 $1,950.000 $3,200.000 $2,400.000 $2,000.000 $3,250.000
CURB RAMPS (TY 7)
EA 8.000 $2,613.330 $1,950.000 $2,693.220 $2,400.000 $2,000.000 $3,250.000
CURB RAMPS (TY 10)
EA 6.000 $3,620.000 $1,870.000 $2,054.160 $2,400.000 $2,000.000 $3,250.000
RELOCATE EXISTING MAILBOX
EA 1.000 $368.900 $360.000 $350.000 $500.000 $500.000 $1,150.000
CONDT (PVC) (SCH 80) (2")
LF 2.000 $44.790 $55.000 $15.750 $44.000 $25.000 $1,000.000
CONDT (PVC) (SCH 80) (3")
LF 2.000 $121.000 $55.000 $33.040 $60.000 $40.000 $1,000.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 100.000 $104.500 $192.000 $37.480 $200.000 $100.000 $250.000
ELEC CONDR (NO.12) INSULATED
LF 158.000 $1.790 $5.500 $1.570 $4.600 $10.000 $3.000
ELEC CONDR (NO.6) BARE
LF 128.000 $2.850 $5.500 $2.520 $3.500 $10.000 $3.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 6.000 $483.750 $555.000 $806.700 $500.000 $500.000 $1,150.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 4.000 $676.500 $643.000 $680.000 $500.000 $500.000 $1,150.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 1.000 $598.750 $550.000 $1,150.000 $500.000 $300.000 $850.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 742.000 $14.600 $12.100 $11.010 $12.000 $20.000 $20.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 742.000 $3.380 $3.850 $7.000 $4.000 $25.000 $20.000
REFL PAV MRK TY II (Y) 6" (SLD)
LF 826.000 $0.550 $0.830 $1.100 $0.800 $7.000 $6.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 826.000 $0.740 $3.630 $1.130 $3.500 $10.000 $6.000
REFL PAV MRKR TY II-A-A
EA 24.000 $7.980 $8.800 $7.020 $9.000 $500.000 $8.000
ELIM EXT PAV MRK & MRKS (24")
LF 70.000 $491.000 $2.750 $5.780 $3.000 $5.000 $20.000
PAV SURF PREP FOR MRK (6")
LF 826.000 $0.040 $0.440 $0.980 $0.500 $2.000 $6.000
PAV SURF PREP FOR MRK (24")
LF 742.000 $2.380 $1.760 $2.700 $2.000 $2.000 $20.000
PED SIG SEC (LED)(COUNTDOWN)
EA 2.000 $742.500 $1,100.000 $220.000 $1,600.000 $2,000.000 $2,850.000
PED POLE ASSEMBLY
EA 1.000 $4,120.000 $7,700.000 $3,101.760 $4,000.000 $4,000.000 $2,850.000
PED DETECT PUSH BUTTON (APS)
EA 2.000 $1,479.750 $1,320.000 $1,426.010 $2,000.000 $2,500.000 $1,850.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,708.330 $7,150.000 $3,603.930 $6,000.000 $7,000.000 $6,500.000
INSTALL OF GROUND BOXES
EA 1.000 $937.000 $3,080.000 $2,500.000 $2,500.000 $1,000.000 $1,500.000
INSTALL OF PEDESTRIAN PUSH BUTTONS
EA 1.000 $475.000 $550.000 $832.000 $750.000 $1,000.000 $850.000
TMA (STATIONARY)
DAY 10.000 $235.880 $50.000 $324.080 $1.000 $500.000 $350.000
Totals: $1,247,284.422 $1,054,719.210 $1,199,247.901 $1,226,571.390 $1,270,591.200 $1,509,837.600