Show Job Controls
Bid Cobra

BROWN CR (0923-06-083)

Items: 43

County: BROWN
Length: N/A
Highway: CR
District: BROWNWOOD
Control Number: 0923-06-083
DBE Goal: N/A
Project: BR 2020(924)
Guaranty: N/A
Time: 102 WORKING DAYS
Engineer's Estimate: $417,194.10
Date: 06/03/2021 (5 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$417,194.10
$498,498.80
Over/Under Est: 19.49% $81,304.70
Over/Under Est: 32.82% $136,925.10
Amt Left: 11.16% $55,620.40
Over/Under Est: 45.85% $191,271.02
Amt Left: 22.06% $109,966.32
Delta: -9.81% -$54,345.92
$711,013.00
Over/Under Est: 70.43% $293,818.90
Amt Left: 42.63% $212,514.20
Delta: -16.85% -$102,547.88
Over/Under Est: 71.82% $299,620.90
Amt Left: 43.79% $218,316.20
Delta: -0.82% -$5,802.00

Bid Items & Bid Tabulations

43 Total 0 of 43
BROWN  |  CR  |  BROWNWOOD  |  0923-06-083  |  06/03/2021  |  $417,194.10  |  BR 2020(924)  |  BRIDGE REPL  |  102 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PIERCE R & B LLC
EARTH BUILDERS, L.P.
INTEGRITY SERVICES, LLC
3LW CIVIL LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 3.100 $2,500.000 $3,000.000 $25,000.000 $2,000.000 $2,500.000 $5,000.000
PREP ROW (TREE)(GREATER THAN 8 IN DIA)
EA 9.000 $1,000.000 $1,500.000 $100.000 $450.000 $1,300.000 $500.000
EXCAVATION (ROADWAY)
CY 91.000 $15.000 $40.000 $25.000 $25.000 $32.000 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 67.000 $25.000 $50.000 $25.000 $25.000 $29.000 $75.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 1,805.000 $0.100 $1.000 $1.200 $1.120 $2.000 $4.000
BROADCAST SEED (TEMP) (WARM)
SY 903.000 $0.100 $1.000 $1.200 $1.120 $2.000 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 903.000 $0.100 $1.000 $1.200 $1.120 $2.000 $1.000
VEGETATIVE WATERING
MG 42.000 $15.000 $30.000 $50.000 $30.000 $150.000 $1.000
SOIL RETENTION BLANKETS (CL 2) (TY G)
SY 1,000.000 $6.000 $3.250 $3.500 $3.360 $6.000 $4.000
FL BS (CMP IN PLC)(TY D GR 3)(FNAL POS)
CY 136.000 $130.000 $75.000 $80.000 $51.890 $95.000 $75.000
PRIME COAT (RC-250)
GAL 204.000 $15.000 $13.000 $12.000 $13.200 $45.000 $30.000
ASPH (AC-20-5TR)
GAL 343.000 $20.000 $37.000 $12.000 $8.800 $45.000 $30.000
AGGR(TY-B GR-5 SAC-B)
CY 7.000 $1,000.000 $1,300.000 $1,200.000 $1,430.000 $300.000 $1,800.000
AGGR(TY-PB GR-3 SAC-B)
CY 9.000 $1,000.000 $1,100.000 $1,000.000 $1,210.000 $300.000 $1,800.000
CEM STABIL BKFL
CY 171.000 $150.000 $195.000 $180.000 $220.000 $195.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 52.000 $10.000 $35.000 $1.000 $30.000 $65.000 $10.000
CL C CONC (CULV)
CY 56.000 $1,100.000 $1,125.000 $1,200.000 $2,032.430 $1,310.000 $2,100.000
REINF CONC SLAB
SF 1,131.000 $18.000 $28.000 $28.000 $26.070 $26.000 $22.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 87.000 $130.000 $130.000 $100.000 $151.860 $185.000 $250.000
RAIL (TY T631LS)
LF 157.000 $70.000 $75.000 $65.000 $66.000 $140.000 $80.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $27,000.000 $27,000.000 $60,000.000 $33,000.000 $29,000.000 $72,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $15,000.000 $15,000.000 $10,000.000 $24,640.000 $16,000.000 $20,000.000
REMOV STR (SMALL FENCE)
LF 345.000 $5.000 $10.000 $2.000 $10.000 $5.000 $5.000
MOBILIZATION
LS 1.000 $40,000.000 $45,000.000 $50,000.000 $69,809.050 $83,000.000 $65,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $2,500.000 $2,500.000 $1,500.000 $2,500.000 $16,000.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $35.000 $43.000 $50.000 $44.800 $30.000 $1.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $10.000 $10.000 $15.000 $5.000 $10.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,060.000 $5.000 $2.700 $3.000 $2.800 $4.000 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,060.000 $1.000 $1.000 $1.500 $1.008 $2.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 110.000 $10.000 $6.000 $7.000 $5.544 $8.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 110.000 $1.000 $1.700 $2.000 $1.120 $3.000 $2.000
CONSTRUCTING DETOURS
SY 485.000 $39.000 $125.000 $45.000 $180.520 $230.000 $160.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 5.000 $6,000.000 $5,000.200 $4,500.000 $4,050.000 $5,000.000 $4,000.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $25.000 $33.000 $35.000 $33.000 $35.000 $26.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,500.000 $3,100.000 $3,500.000 $3,245.000 $1,300.000 $2,800.000
WIRE FENCE (TY C)
LF 640.000 $15.000 $12.000 $10.000 $22.000 $24.000 $20.000
WIRE FENCE (WATER GAP)
LF 45.000 $40.000 $50.000 $45.000 $40.000 $65.000 $60.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $25.000 $1.000 $20.000 $8.960 $45.000 $5.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $50.000 $38.000 $30.000 $27.500 $35.000 $30.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 164.000 $5.000 $2.700 $8.000 $6.720 $10.000 $10.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 485.000 $1.000 $10.200 $5.000 $3.080 $5.000 $5.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 22.000 $10.000 $20.000 $20.000 $28.000 $25.000 $25.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 6,000.000 $1.000 $1.000 $0.800 $2.750 $2.500 $3.500
Totals: $417,194.100 $498,498.800 $554,119.200 $608,465.120 $711,013.000 $716,815.000