BROWN VA (0923-00-066)

Items: 44

County: BROWN
Length: N/A
Highway: VA
District: BROWNWOOD
Control Number: 0923-00-066
DBE Goal: N/A
Project: C 923-00-66
Guaranty: N/A
Time: 176 WORKING DAYS
Engineer's Estimate: $2,795,355.34
Date: 10/06/2023 (2 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,795,355.34
$2,616,921.75
Over/Under Est: -6.38% -$178,433.59
Over/Under Est: -5.35% -$149,636.44
Amt Left: 1.1% $28,797.15
Over/Under Est: 2.42% $67,530.28
Amt Left: 9.4% $245,963.87
Delta: -8.21% -$217,166.72
Subcontractor Percentage Amount
S & S BRIDGE PAINTING, INC. 12.62% $338,757.18
CHEROKEE SERVICES 6.04% $162,131.01
BARRICADES UNLIMITED 0.50% $13,421.44
Total: 19.16% $514,309.63

Bid Items & Bid Tabulations

44 Total 0 of 44
BROWN  |  VA  |  BROWNWOOD  |  0923-00-066  |  10/06/2023  |  $2,795,355.34  |  C 923-00-66  |  PREVENT MAINT  |  176 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STRUCTURAL INTEGRITY GROUP LLC
BLACKSMITH VENTURES LLC
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
EXCAVATION (CHANNEL)
CY 846.000 $100.000 $80.000 $44.000 $68.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 29.500 $94.800 $170.000 $44.000 $205.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 10,800.000 $1.000 $0.500 $5.500 $0.700
BROADCAST SEED (TEMP) (WARM)
SY 5,400.000 $1.000 $0.500 $5.500 $0.700
BROADCAST SEED (TEMP) (COOL)
SY 5,400.000 $1.000 $0.500 $5.500 $0.700
FLOWABLE BACKFILL
CY 142.750 $373.230 $640.000 $550.000 $942.500
TEMPORARY SPL SHORING
SF 348.000 $94.000 $70.000 $110.000 $133.000
CL C CONC (CULV)
CY 0.300 $2,500.000 $22,000.000 $11,000.000 $11,517.000
CL C CONC (WINGWALLS)
CY 28.800 $3,000.000 $5,200.000 $1,650.000 $2,990.000
CL C CONC (WEBWALL)
CY 34.000 $3,000.000 $3,000.000 $1,100.000 $3,816.000
EPOXY WATERPROOF FINISH
SF 6,387.000 $34.000 $43.750 $49.500 $35.100
PENETRATING CONCRETE SURFACE TREATMENT
SY 457.000 $5.000 $22.500 $33.000 $91.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 301.500 $215.000 $105.000 $55.000 $245.300
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 12.000 $500.000 $390.000 $550.000 $466.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 2,444.000 $225.000 $175.000 $192.500 $202.000
CONC STR REPAIR (PAN GIRDER HOLE REPR)
EA 601.000 $136.000 $75.000 $110.000 $117.000
RIPRAP (CONC)(5 IN)
CY 29.100 $250.000 $1,400.000 $550.000 $1,182.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 211.000 $260.000 $300.000 $275.000 $393.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 421.000 $284.000 $280.000 $275.000 $335.000
RIPRAP (STONE PROTECTION) (36 IN)
CY 897.000 $300.000 $270.000 $330.000 $226.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 2,580.100 $45.000 $55.000 $44.000 $33.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 855.000 $60.000 $60.000 $82.500 $44.000
CLEAN/SEAL EXIST JTS(CL3)(PAN GIRDER)
LF 96.000 $60.000 $97.500 $82.500 $94.000
CLEAN AND PAINT EXIST STR (REF NO.1)
LS 1.000 $52.830 $29,375.000 $27,500.000 $30,874.000
CLEAN AND PAINT EXIST STR (REF NO.2)
LS 1.000 $53.830 $29,375.000 $18,150.000 $29,099.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
EA 5.000 $13,000.000 $2,900.000 $4,400.000 $2,704.000
MOBILIZATION
LS 1.000 $214,822.000 $260,000.000 $275,000.000 $286,278.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $15,500.000 $10,500.000 $8,250.000 $16,245.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,200.000 $7.000 $2.000 $3.300 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,200.000 $2.000 $2.000 $1.100 $1.600
ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG)
DAY 4.000 $790.000 $1,500.000 $5,500.000 $1,266.000
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $45.000 $38.750 $49.500 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $3,000.000 $2,937.500 $4,400.000 $3,627.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $2,500.000 $33.750 $49.500 $53.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $15.000 $2.500 $5.500 $11.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,800.000 $3,750.000 $4,400.000 $3,639.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 11.000 $50.000 $30.000 $55.000 $53.000
TREE REMOVAL (4" - 12" DIA)
EA 5.000 $50.000 $500.000 $275.000 $972.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 29.000 $750.000 $225.000 $1,100.000 $548.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 268.000 $114.000 $80.000 $55.000 $157.000
STEEL BRIDGE ZONE PAINTING REF STR #1
EA 1.000 $25,000.000 $37,500.000 $22,000.000 $38,296.000
STEEL BRIDGE ZONE PAINTING REF STR #2
EA 1.000 $25,000.000 $37,500.000 $22,000.000 $34,400.000
TMA (STATIONARY)
DAY 130.000 $290.000 $200.000 $330.000 $422.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 287.500 $151.000 $150.000 $165.000 $270.000
Totals: $2,795,355.342 $2,616,921.750 $2,645,718.900 $2,862,885.625