BROWN US 67 (0079-01-038)

Items: 93

County: BROWN
Length: N/A
Highway: US 67
District: BROWNWOOD
Control Number: 0079-01-038
DBE Goal: N/A
Project: C 79-1-38
Guaranty: N/A
Time: 131 WORKING DAYS
Engineer's Estimate: $2,775,459.00
Date: 01/06/2022 (4 years ago)
Contract Number: N/A
Type: RAILROAD CROSSING IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$2,775,459.00
$3,046,555.05
Over/Under Est: 9.77% $271,096.05
Over/Under Est: 20.07% $556,919.73
Amt Left: 9.38% $285,823.68
$4,066,967.84
Over/Under Est: 46.53% $1,291,508.84
Amt Left: 33.49% $1,020,412.79
Delta: -22.04% -$734,589.11
$4,646,454.80
Over/Under Est: 67.41% $1,870,995.80
Amt Left: 52.52% $1,599,899.75
Delta: -14.25% -$579,486.96

Bid Items & Bid Tabulations

93 Total 0 of 93
BROWN  |  US 67  |  BROWNWOOD  |  0079-01-038  |  01/06/2022  |  $2,775,459.00  |  C 79-1-38  |  RAILROAD CROSSING IMPRVS  |  131 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PRATER DIRT WORK LLC
JAY MILLS CONTRACTING, INCORPORATED
A. L. HELMCAMP, INC.
DIGG COMMERCIAL, LLC
PREPARING ROW
STA 12.000 $1,000.000 $3,000.000 $1,550.000 $1,800.000 $3,500.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 4.000 $2,500.000 $2,200.000 $1,525.000 $1,900.000 $1,333.000
REMOVING CONC (CTB)
LF 84.000 $10.000 $70.000 $65.000 $85.000 $80.000
EXCAVATION (ROADWAY)
CY 13,139.000 $15.000 $27.000 $13.000 $25.000 $29.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 54.000 $30.000 $10.000 $50.000 $90.000 $88.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 9,514.000 $0.250 $0.350 $0.300 $0.280 $1.000
DRILL SEEDING (TEMP) (WARM)
SY 4,757.000 $0.250 $0.300 $0.300 $0.280 $1.000
DRILL SEEDING (TEMP) (COOL)
SY 4,757.000 $0.250 $0.300 $0.300 $0.280 $1.000
VEGETATIVE WATERING
MG 286.000 $25.000 $5.000 $23.000 $25.000 $129.000
PROOF ROLLING
HR 20.000 $100.000 $200.000 $100.000 $90.000 $200.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 2,868.000 $50.000 $50.000 $65.000 $80.000 $57.000
PRIME COAT(MC-30 OR AE-P)
GAL 2,269.000 $3.500 $5.000 $5.000 $10.000 $6.000
PLANE & TEXT ASPH CONC PAV (0"-9")
SY 9,745.000 $5.000 $1.880 $4.750 $8.000 $8.000
CEM STABIL BKFL
CY 1,232.000 $75.000 $65.000 $168.000 $170.000 $216.000
CUT & RESTORING PAV
SY 6.000 $90.000 $400.000 $625.000 $360.000 $394.000
FLOWABLE BACKFILL
CY 18.870 $150.000 $200.000 $200.000 $390.000 $260.000
TRENCH EXCAVATION PROTECTION
LF 1,182.000 $8.000 $40.000 $1.100 $17.000 $3.000
TEMPORARY SPL SHORING
SF 13,994.000 $20.000 $5.000 $16.000 $20.000 $26.000
CL C CONC (RAIL FOUNDATION)
CY 20.000 $400.000 $800.000 $1,980.000 $1,000.000 $1,300.000
RIPRAP (CONC)(4 IN)
CY 170.800 $500.000 $600.000 $567.000 $650.000 $751.000
RIPRAP (CONC)(5 IN)
CY 2.700 $2,000.000 $650.000 $660.000 $720.000 $1,459.000
RIPRAP (MOW STRIP)(4 IN)
CY 64.000 $500.000 $650.000 $567.000 $720.000 $783.000
RAIL (TY T551)
LF 138.000 $100.000 $266.000 $193.000 $180.000 $301.000
CONC BOX CULV (4 FT X 2 FT)
LF 1,149.000 $250.000 $285.000 $300.000 $500.000 $441.000
RC PIPE (CL III)(18 IN)
LF 207.000 $75.000 $56.000 $62.000 $62.000 $142.000
RC PIPE (CL III)(24 IN)
LF 24.000 $100.000 $150.000 $240.000 $166.000 $169.000
RC PIPE (CL III)(36 IN)
LF 8.000 $125.000 $300.000 $300.000 $325.000 $250.000
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
EA 4.000 $5,000.000 $5,500.000 $5,300.000 $6,100.000 $7,985.000
MANH (COMPL)(TY 2)
EA 2.000 $2,500.000 $7,500.000 $2,000.000 $8,300.000 $8,100.000
WINGWALL (FW - 0) (HW=3 FT)
EA 1.000 $5,000.000 $7,000.000 $9,000.000 $7,800.000 $10,200.000
WINGWALL (SW - 0) (HW=3 FT)
EA 1.000 $5,000.000 $6,500.000 $10,000.000 $7,200.000 $10,500.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,500.000 $1,000.000 $1,100.000 $1,200.000 $2,800.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $1,800.000 $12,000.000 $1,200.000 $1,600.000 $3,600.000
REMOV STR (INLET)
EA 1.000 $1,000.000 $850.000 $1,600.000 $1,000.000 $3,000.000
REMOV STR (SET)
EA 1.000 $1,000.000 $850.000 $500.000 $1,000.000 $2,000.000
REMOV STR (WINGWALL)
EA 1.000 $1,500.000 $2,500.000 $3,150.000 $2,800.000 $4,000.000
REMOV STR (PIPE)
LF 112.000 $30.000 $40.000 $32.000 $45.000 $66.000
MOBILIZATION
LS 1.000 $250,000.000 $125,000.000 $250,000.000 $350,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $8,000.000 $6,000.000 $9,500.000 $9,500.000 $6,600.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 124.000 $30.000 $30.000 $38.500 $39.000 $62.000
ROCK FILTER DAMS (REMOVE)
CY 124.000 $20.000 $25.000 $16.500 $17.000 $8.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 100.000 $22.000 $30.000 $16.500 $20.000 $44.000
CONSTRUCTION EXITS (REMOVE)
SY 100.000 $10.000 $10.000 $6.000 $5.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,307.000 $5.000 $4.000 $4.500 $4.300 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,307.000 $1.000 $2.000 $1.250 $1.000 $1.000
CONSTRUCTING DETOURS
SY 2,374.000 $50.000 $35.000 $55.000 $40.000 $65.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 3,180.000 $35.000 $78.000 $87.000 $100.000 $67.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,210.000 $5.000 $10.000 $12.150 $5.000 $11.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 3,180.000 $10.000 $10.000 $11.500 $12.000 $10.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 415.000 $200.000 $131.000 $100.000 $200.000 $136.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 155.000 $200.000 $399.000 $300.000 $500.000 $440.000
DRIVEWAYS (ACP)
SY 338.000 $35.000 $16.000 $51.000 $35.000 $52.000
TURNOUTS (ACP)
SY 485.000 $70.000 $16.000 $51.500 $65.000 $50.000
RUMBLE STRIPS (SHOULDER)
LF 9,390.000 $0.250 $0.300 $0.530 $0.650 $1.400
RUMBLE STRIPS (CENTERLINE)
LF 9,390.000 $0.250 $0.300 $0.530 $0.650 $2.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $2,000.000 $2,900.000 $3,000.000 $2,200.000 $2,700.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,200.000 $1,900.000 $2,000.000 $1,500.000 $3,800.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 12.500 $70.000 $105.000 $110.000 $120.000 $114.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $200.000 $315.000 $350.000 $230.000 $700.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $250.000 $315.000 $350.000 $230.000 $850.000
MTL BM GD FEN (REMOVE & REINSTALL)
LF 1,050.000 $30.000 $21.000 $22.000 $17.000 $32.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 3.000 $1,200.000 $2,100.000 $2,200.000 $1,000.000 $1,200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $1,800.000 $2,650.000 $3,225.000 $1,200.000 $4,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $2,000.000 $1,100.000 $2,300.000 $1,000.000 $3,300.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $15,000.000 $26,500.000 $33,200.000 $26,000.000 $18,280.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,000.000 $7,000.000 $14,000.000 $10,000.000 $28,730.000
PIPE UNDERDRAINS (TY 7) (6")
LF 100.000 $35.000 $25.000 $50.000 $36.000 $125.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 3.000 $200.000 $315.000 $330.000 $335.000 $980.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $600.000 $1,250.000 $1,250.000 $1,000.000 $850.000
IN SM RD SN SUP&AM TYTWT(1)UA(P)
EA 2.000 $500.000 $900.000 $925.000 $650.000 $880.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $2,025.000 $4,000.000 $4,400.000 $2,800.000 $4,000.000
REMOVE SM RD SN SUP&AM
EA 6.000 $100.000 $110.000 $125.000 $25.000 $440.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 2.000 $25.000 $33.000 $40.000 $21.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $50.000 $49.000 $50.000 $26.000 $48.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 6.000 $30.000 $38.000 $40.000 $21.000 $52.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 3.000 $30.000 $958.000 $1,100.000 $100.000 $150.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 7.000 $3.500 $11.000 $12.000 $11.000 $36.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 130.000 $1.000 $2.100 $2.500 $2.200 $6.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 16,845.000 $1.000 $0.800 $0.790 $0.800 $1.160
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 23,295.000 $1.000 $0.800 $0.790 $0.800 $1.150
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,115.000 $0.500 $0.780 $0.770 $0.800 $1.300
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 8,455.000 $0.500 $0.780 $0.770 $0.800 $1.330
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 8,455.000 $0.500 $0.750 $0.750 $0.800 $1.880
REFL PAV MRKR TY II-C-R
EA 107.000 $3.500 $7.000 $8.000 $7.600 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 19,025.000 $0.500 $1.000 $3.000 $0.600 $0.800
D-GR HMA TY-B SAC-B PG64-22
TON 3,899.000 $95.000 $114.000 $104.500 $120.000 $180.000
TACK COAT
GAL 1,013.000 $2.000 $5.000 $0.010 $4.800 $6.000
SP MIXES SP-D SAC-B PG76-22
TON 819.000 $110.000 $149.000 $123.000 $130.000 $170.000
TACK COAT
GAL 975.000 $2.000 $5.000 $0.010 $4.800 $6.000
FILLING MILLED ASPHALT RUMBLE STRIPS
LF 3,174.000 $3.000 $3.000 $4.500 $9.000 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 30.000 $150.000 $150.000 $110.000 $350.000 $444.000
TMA (STATIONARY)
DAY 90.000 $200.000 $300.000 $220.000 $200.000 $350.000
TMA (MOBILE OPERATION)
HR 48.000 $50.000 $70.000 $70.000 $65.000 $500.000
Totals: $2,775,459.000 $3,046,555.050 $3,332,378.730 $4,066,967.840 $4,646,454.800