PREPARING ROW
|
STA
|
12.000
|
$1,000.000
|
$3,000.000
|
$1,550.000
|
$1,800.000
|
$3,500.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
4.000
|
$2,500.000
|
$2,200.000
|
$1,525.000
|
$1,900.000
|
$1,333.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
84.000
|
$10.000
|
$70.000
|
$65.000
|
$85.000
|
$80.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
13,139.000
|
$15.000
|
$27.000
|
$13.000
|
$25.000
|
$29.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
54.000
|
$30.000
|
$10.000
|
$50.000
|
$90.000
|
$88.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
9,514.000
|
$0.250
|
$0.350
|
$0.300
|
$0.280
|
$1.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
4,757.000
|
$0.250
|
$0.300
|
$0.300
|
$0.280
|
$1.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
4,757.000
|
$0.250
|
$0.300
|
$0.300
|
$0.280
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
286.000
|
$25.000
|
$5.000
|
$23.000
|
$25.000
|
$129.000
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$100.000
|
$200.000
|
$100.000
|
$90.000
|
$200.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
2,868.000
|
$50.000
|
$50.000
|
$65.000
|
$80.000
|
$57.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
2,269.000
|
$3.500
|
$5.000
|
$5.000
|
$10.000
|
$6.000
|
|
|
PLANE & TEXT ASPH CONC PAV (0"-9")
|
SY
|
9,745.000
|
$5.000
|
$1.880
|
$4.750
|
$8.000
|
$8.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,232.000
|
$75.000
|
$65.000
|
$168.000
|
$170.000
|
$216.000
|
|
|
CUT & RESTORING PAV
|
SY
|
6.000
|
$90.000
|
$400.000
|
$625.000
|
$360.000
|
$394.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
18.870
|
$150.000
|
$200.000
|
$200.000
|
$390.000
|
$260.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,182.000
|
$8.000
|
$40.000
|
$1.100
|
$17.000
|
$3.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
13,994.000
|
$20.000
|
$5.000
|
$16.000
|
$20.000
|
$26.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
20.000
|
$400.000
|
$800.000
|
$1,980.000
|
$1,000.000
|
$1,300.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
170.800
|
$500.000
|
$600.000
|
$567.000
|
$650.000
|
$751.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
2.700
|
$2,000.000
|
$650.000
|
$660.000
|
$720.000
|
$1,459.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
64.000
|
$500.000
|
$650.000
|
$567.000
|
$720.000
|
$783.000
|
|
|
RAIL (TY T551)
|
LF
|
138.000
|
$100.000
|
$266.000
|
$193.000
|
$180.000
|
$301.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
1,149.000
|
$250.000
|
$285.000
|
$300.000
|
$500.000
|
$441.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
207.000
|
$75.000
|
$56.000
|
$62.000
|
$62.000
|
$142.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
24.000
|
$100.000
|
$150.000
|
$240.000
|
$166.000
|
$169.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
8.000
|
$125.000
|
$300.000
|
$300.000
|
$325.000
|
$250.000
|
|
|
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
|
EA
|
4.000
|
$5,000.000
|
$5,500.000
|
$5,300.000
|
$6,100.000
|
$7,985.000
|
|
|
MANH (COMPL)(TY 2)
|
EA
|
2.000
|
$2,500.000
|
$7,500.000
|
$2,000.000
|
$8,300.000
|
$8,100.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
1.000
|
$5,000.000
|
$7,000.000
|
$9,000.000
|
$7,800.000
|
$10,200.000
|
|
|
WINGWALL (SW - 0) (HW=3 FT)
|
EA
|
1.000
|
$5,000.000
|
$6,500.000
|
$10,000.000
|
$7,200.000
|
$10,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$1,000.000
|
$1,100.000
|
$1,200.000
|
$2,800.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,800.000
|
$12,000.000
|
$1,200.000
|
$1,600.000
|
$3,600.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,000.000
|
$850.000
|
$1,600.000
|
$1,000.000
|
$3,000.000
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$1,000.000
|
$850.000
|
$500.000
|
$1,000.000
|
$2,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,500.000
|
$2,500.000
|
$3,150.000
|
$2,800.000
|
$4,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
112.000
|
$30.000
|
$40.000
|
$32.000
|
$45.000
|
$66.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$250,000.000
|
$125,000.000
|
$250,000.000
|
$350,000.000
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$8,000.000
|
$6,000.000
|
$9,500.000
|
$9,500.000
|
$6,600.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
124.000
|
$30.000
|
$30.000
|
$38.500
|
$39.000
|
$62.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
CY
|
124.000
|
$20.000
|
$25.000
|
$16.500
|
$17.000
|
$8.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
100.000
|
$22.000
|
$30.000
|
$16.500
|
$20.000
|
$44.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
100.000
|
$10.000
|
$10.000
|
$6.000
|
$5.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,307.000
|
$5.000
|
$4.000
|
$4.500
|
$4.300
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,307.000
|
$1.000
|
$2.000
|
$1.250
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,374.000
|
$50.000
|
$35.000
|
$55.000
|
$40.000
|
$65.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
3,180.000
|
$35.000
|
$78.000
|
$87.000
|
$100.000
|
$67.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,210.000
|
$5.000
|
$10.000
|
$12.150
|
$5.000
|
$11.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
3,180.000
|
$10.000
|
$10.000
|
$11.500
|
$12.000
|
$10.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
415.000
|
$200.000
|
$131.000
|
$100.000
|
$200.000
|
$136.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
155.000
|
$200.000
|
$399.000
|
$300.000
|
$500.000
|
$440.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
338.000
|
$35.000
|
$16.000
|
$51.000
|
$35.000
|
$52.000
|
|
|
TURNOUTS (ACP)
|
SY
|
485.000
|
$70.000
|
$16.000
|
$51.500
|
$65.000
|
$50.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
9,390.000
|
$0.250
|
$0.300
|
$0.530
|
$0.650
|
$1.400
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
9,390.000
|
$0.250
|
$0.300
|
$0.530
|
$0.650
|
$2.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$2,000.000
|
$2,900.000
|
$3,000.000
|
$2,200.000
|
$2,700.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,200.000
|
$1,900.000
|
$2,000.000
|
$1,500.000
|
$3,800.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
12.500
|
$70.000
|
$105.000
|
$110.000
|
$120.000
|
$114.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
10.000
|
$200.000
|
$315.000
|
$350.000
|
$230.000
|
$700.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$250.000
|
$315.000
|
$350.000
|
$230.000
|
$850.000
|
|
|
MTL BM GD FEN (REMOVE & REINSTALL)
|
LF
|
1,050.000
|
$30.000
|
$21.000
|
$22.000
|
$17.000
|
$32.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
3.000
|
$1,200.000
|
$2,100.000
|
$2,200.000
|
$1,000.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
3.000
|
$1,800.000
|
$2,650.000
|
$3,225.000
|
$1,200.000
|
$4,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$2,000.000
|
$1,100.000
|
$2,300.000
|
$1,000.000
|
$3,300.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
2.000
|
$15,000.000
|
$26,500.000
|
$33,200.000
|
$26,000.000
|
$18,280.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,000.000
|
$7,000.000
|
$14,000.000
|
$10,000.000
|
$28,730.000
|
|
|
PIPE UNDERDRAINS (TY 7) (6")
|
LF
|
100.000
|
$35.000
|
$25.000
|
$50.000
|
$36.000
|
$125.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
3.000
|
$200.000
|
$315.000
|
$330.000
|
$335.000
|
$980.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$600.000
|
$1,250.000
|
$1,250.000
|
$1,000.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UA(P)
|
EA
|
2.000
|
$500.000
|
$900.000
|
$925.000
|
$650.000
|
$880.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$2,025.000
|
$4,000.000
|
$4,400.000
|
$2,800.000
|
$4,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$100.000
|
$110.000
|
$125.000
|
$25.000
|
$440.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
2.000
|
$25.000
|
$33.000
|
$40.000
|
$21.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$50.000
|
$49.000
|
$50.000
|
$26.000
|
$48.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$30.000
|
$38.000
|
$40.000
|
$21.000
|
$52.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
3.000
|
$30.000
|
$958.000
|
$1,100.000
|
$100.000
|
$150.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
7.000
|
$3.500
|
$11.000
|
$12.000
|
$11.000
|
$36.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
130.000
|
$1.000
|
$2.100
|
$2.500
|
$2.200
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
16,845.000
|
$1.000
|
$0.800
|
$0.790
|
$0.800
|
$1.160
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
23,295.000
|
$1.000
|
$0.800
|
$0.790
|
$0.800
|
$1.150
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,115.000
|
$0.500
|
$0.780
|
$0.770
|
$0.800
|
$1.300
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
8,455.000
|
$0.500
|
$0.780
|
$0.770
|
$0.800
|
$1.330
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
8,455.000
|
$0.500
|
$0.750
|
$0.750
|
$0.800
|
$1.880
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
107.000
|
$3.500
|
$7.000
|
$8.000
|
$7.600
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
19,025.000
|
$0.500
|
$1.000
|
$3.000
|
$0.600
|
$0.800
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
3,899.000
|
$95.000
|
$114.000
|
$104.500
|
$120.000
|
$180.000
|
|
|
TACK COAT
|
GAL
|
1,013.000
|
$2.000
|
$5.000
|
$0.010
|
$4.800
|
$6.000
|
|
|
SP MIXES SP-D SAC-B PG76-22
|
TON
|
819.000
|
$110.000
|
$149.000
|
$123.000
|
$130.000
|
$170.000
|
|
|
TACK COAT
|
GAL
|
975.000
|
$2.000
|
$5.000
|
$0.010
|
$4.800
|
$6.000
|
|
|
FILLING MILLED ASPHALT RUMBLE STRIPS
|
LF
|
3,174.000
|
$3.000
|
$3.000
|
$4.500
|
$9.000
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
30.000
|
$150.000
|
$150.000
|
$110.000
|
$350.000
|
$444.000
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$200.000
|
$300.000
|
$220.000
|
$200.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
48.000
|
$50.000
|
$70.000
|
$70.000
|
$65.000
|
$500.000
|
|
Totals: |
$2,775,459.000
|
$3,046,555.050
|
$3,332,378.730
|
$4,066,967.840
|
$4,646,454.800
|