Show Job Controls
Bid Cobra

BREWSTER US0090 (6451-77-001)

Items: 29

County: BREWSTER
Length: N/A
Highway: US0090
District: EL PASO
Control Number: 6451-77-001
DBE Goal: 0.0%
Project: RMC - 645177001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,423,930.00
Date: 01/04/2024 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,423,930.00
$1,194,460.00
Over/Under Est: -16.12% -$229,470.00
Over/Under Est: 9.24% $131,615.00
Amt Left: 30.23% $361,085.00
Over/Under Est: 14.62% $208,245.00
Amt Left: 36.65% $437,715.00
Delta: -4.93% -$76,630.00
$1,682,010.00
Over/Under Est: 18.12% $258,080.00
Amt Left: 40.82% $487,550.00
Delta: -3.05% -$49,835.00

Bid Items & Bid Tabulations

29 Total 0 of 29
BREWSTER  |  US0090  |  EL PASO  |  6451-77-001  |  01/04/2024  |  $1,423,930.00  |  RMC - 645177001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DIGG COMMERCIAL, LLC
APACHE BARRICADE & SIGN
B & MS CONSTRUCTION, INC.
HJC FARMS, INC.
RIPRAP (CONC)(CL B)
CY 130.000 $800.000 $300.000 $1,892.000 $700.000 $1,500.000
MOBILIZATION
LS 1.000 $150,000.000 $200,000.000 $200,000.000 $140,000.000 $300,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $85.000 $16.000 $79.000 $85.000 $40.000
MTL W-BEAM GD FEN (STEEL POST)
LF 700.000 $120.000 $22.000 $79.000 $92.000 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $7,000.000 $800.000 $2,900.000 $7,000.000 $3,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $3,300.000 $1,000.000 $3,120.000 $3,750.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT
EA 4.000 $600.000 $150.000 $845.000 $450.000 $1,500.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 4.000 $3,300.000 $1,000.000 $1,817.000 $3,250.000 $3,000.000
REMOVE METAL BEAM GUARD FENCE
LF 3,000.000 $33.000 $1.000 $39.000 $69.000 $25.000
REMOVE TERMINAL ANCHOR SECTION
EA 40.000 $800.000 $364.000 $1,400.000 $800.000 $500.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $900.000 $500.000 $1,113.000 $850.000 $500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 100.000 $60.000 $30.000 $59.000 $300.000 $50.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $100.000 $57.000 $103.000 $100.000 $50.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $90.000 $50.000 $175.000 $94.000 $100.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $110.000 $50.000 $107.000 $95.000 $100.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 25.000 $90.000 $50.000 $84.000 $96.000 $100.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 400.000 $325.000 $100.000 $294.000 $350.000 $250.000
REALIGN POSTS
EA 30.000 $250.000 $200.000 $88.000 $245.000 $25.000
REMOVE & REPLACE BLOCKOUT
EA 500.000 $75.000 $15.000 $49.000 $85.000 $45.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,000.000 $75.000 $20.000 $84.000 $225.000 $100.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 150.000 $200.000 $122.000 $99.000 $200.000 $500.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 10.000 $1,400.000 $500.000 $99.000 $1,250.000 $1.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 25.000 $8,000.000 $2,300.000 $5,750.000 $6,990.000 $15,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 4.000 $2,750.000 $1,000.000 $3,300.000 $3,250.000 $2,000.000
REPLACE SGT CABLE ANCHOR
EA 30.000 $330.000 $60.000 $900.000 $290.000 $75.000
REPLACE SGT OBJECT MARKER
EA 30.000 $96.000 $30.000 $60.000 $180.000 $75.000
REM & RESET SGT IMPACT HEAD (FURNISHED)
EA 25.000 $3,000.000 $250.000 $2,300.000 $2,400.000 $750.000
REPLACE SINGLE GDRAIL TERM POST (FURN)
EA 20.000 $450.000 $250.000 $90.000 $350.000 $200.000
TMA (STATIONARY)
DAY 125.000 $500.000 $4,900.000 $925.000 $450.000 $1,500.000
Totals: $1,423,930.000 $1,194,460.000 $1,555,545.000 $1,632,175.000 $1,682,010.000