Show Job Controls
Bid Cobra

BRAZOS FM1179 (6394-30-001)

Items: 46

County: BRAZOS
Length: N/A
Highway: FM1179
District: BRYAN
Control Number: 6394-30-001
DBE Goal: N/A
Project: RMC - 639430001
Guaranty: N/A
Time: 30 W
Engineer's Estimate: $1,426,554.03
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: ASPHALT PAVEMENT REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$1,426,554.03
$1,299,946.94
Over/Under Est: -8.88% -$126,607.09
$1,355,757.52
Over/Under Est: -4.96% -$70,796.51
Amt Left: 4.29% $55,810.58
Over/Under Est: 6.17% $88,048.57
Amt Left: 16.51% $214,655.66
Delta: -11.72% -$158,845.08

Bid Items & Bid Tabulations

46 Total 0 of 46
BRAZOS  |  FM1179  |  BRYAN  |  6394-30-001  |  02/04/2022  |  $1,426,554.03  |  RMC - 639430001  |  ASPH PAVMT REPAIR  |  30 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
BRAZOS PAVING, INC.
TEXAS MATERIALS GROUP, INC.
BACKFILL (TY A OR B)
STA 96.000 $140.000 $99.000 $125.000 $172.000
PLANE ASPH CONC PAV(0" TO 2")
SY 56,173.000 $1.650 $0.600 $1.000 $1.880
MOBILIZATION
LS 1.000 $67,931.000 $33,000.000 $55,400.000 $77,250.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $5,500.000 $10,000.000 $8,000.000 $4,300.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 500.000 $1.500 $2.000 $4.250 $1.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000 $2.000 $2.000 $4.250 $1.500
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 500.000 $5.000 $6.000 $20.000 $3.500
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 500.000 $3.500 $6.000 $4.250 $2.000
INTERSECTIONS (ACP)
SY 3,704.000 $30.000 $31.700 $21.150 $22.000
DRIVEWAYS (ACP)
SY 999.000 $35.000 $70.300 $25.250 $33.500
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 2,049.000 $0.400 $0.370 $0.340 $0.350
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,410.000 $0.650 $0.640 $0.610 $0.600
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,014.000 $0.400 $0.370 $0.340 $0.350
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 5,349.000 $0.450 $0.370 $0.340 $0.350
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,488.000 $1.000 $1.000 $1.050 $2.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,532.000 $1.000 $1.000 $0.700 $2.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,353.000 $1.900 $0.940 $0.700 $0.900
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 4,550.000 $0.500 $0.540 $0.470 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 19,273.000 $0.550 $0.540 $0.470 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 4,490.000 $0.500 $0.540 $0.470 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 23,770.000 $0.550 $0.540 $0.470 $0.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 1,842.000 $13.250 $13.000 $12.800 $12.250
PREFAB PAV MRK TY C (W) (ARROW)
EA 39.000 $215.000 $200.000 $215.250 $190.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 2.000 $375.000 $380.000 $316.130 $365.000
PREFAB PAV MRK TY C (W) (WORD)
EA 41.000 $250.000 $265.000 $250.950 $250.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 40.000 $15.000 $13.000 $17.850 $12.250
REFL PAV MRKR TY I-C
EA 498.000 $3.600 $5.000 $4.460 $4.500
REFL PAV MRKR TY II-A-A
EA 665.000 $4.600 $5.000 $4.460 $4.500
ELIM EXT PAV MRK & MRKS (4")
LF 2,474.000 $0.570 $0.270 $0.370 $0.250
ELIM EXT PAV MRK & MRKS (8")
LF 4,156.000 $1.450 $0.320 $0.610 $0.300
ELIM EXT PAV MRK & MRKS (12")
LF 1,428.000 $1.900 $0.500 $1.580 $0.500
ELIM EXT PAV MRK & MRKS (24")
LF 476.000 $3.750 $0.800 $2.890 $0.750
ELIM EXT PAV MRK & MRKS (ARROW)
EA 35.000 $80.000 $37.000 $31.500 $35.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 35.000 $70.000 $37.000 $36.750 $35.000
PAV SURF PREP FOR MRK (4")
LF 2,474.000 $0.350 $0.010 $0.010 $0.010
PAV SURF PREP FOR MRK (8")
LF 4,706.000 $0.400 $0.020 $0.010 $0.020
PAV SURF PREP FOR MRK (24")
LF 1,202.000 $0.450 $0.050 $0.010 $0.050
PAV SURF PREP FOR MRK (ARROW)
EA 33.000 $16.300 $21.000 $0.010 $20.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 2.000 $17.200 $21.000 $0.010 $20.000
PAV SURF PREP FOR MRK (WORD)
EA 35.000 $18.000 $21.000 $0.010 $20.000
PAV SURF PREP FOR MRK (RPM)
EA 330.000 $0.270 $0.050 $0.010 $0.050
SP MIXES SP-C SAC-A PG70-22
TON 9,073.000 $100.000 $92.000 $103.600 $113.500
BONDING COURSE
GAL 9,107.000 $3.000 $3.000 $3.250 $3.600
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $5,000.000 $2,600.000 $2,500.000 $2,710.000
TMA (STATIONARY)
DAY 22.000 $200.000 $500.000 $225.000 $159.000
TMA (MOBILE OPERATION)
DAY 28.000 $300.000 $800.000 $500.000 $159.000
Totals: $1,426,554.030 $1,299,946.940 $1,355,757.520 $1,514,602.600