BRAZOS FM 2347 (3138-01-038)

Items: 92

County: BRAZOS
Length: N/A
Highway: FM 2347
District: BRYAN
Control Number: 3138-01-038
DBE Goal: 400.0%
Project: STP 2023(312)TAPS
Guaranty: N/A
Time: 68 WORKING DAYS
Engineer's Estimate: $1,284,315.95
Date: 07/09/2024 (1 year ago)
Contract Number: N/A
Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Mail/Deliver Bids To: N/A
JAMES ROBBINS
JOSEPH GREIVE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,284,315.95
$1,020,976.25
Over/Under Est: -20.5% -$263,339.70
$1,162,054.00
Over/Under Est: -9.52% -$122,261.95
Amt Left: 13.82% $141,077.75
$1,202,338.69
Over/Under Est: -6.38% -$81,977.26
Amt Left: 17.76% $181,362.44
Delta: -3.47% -$40,284.69
Over/Under Est: 7.22% $92,712.43
Amt Left: 34.87% $356,052.13
Delta: -14.53% -$174,689.69
Subcontractor Percentage Amount
TRAFFIC SIGNS & LINES, LLC 7.86% $80,271.57
CEN TEX HYDROSEED, INC. 0.32% $3,268.05
Total: 8.18% $83,539.62

Bid Items & Bid Tabulations

92 Total 0 of 92
BRAZOS  |  FM 2347  |  BRYAN  |  3138-01-038  |  07/09/2024  |  $1,284,315.95  |  STP 2023(312)TAPS  |  BICYCLE AND PEDESTRIAN IMPRVS  |  68 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
STX CIVIL
BRAZOS PAVING, INC.
KNIFE RIVER CORPORATION - SOUTH
REMOVING CONC (PAV)
SY 89.000 $13.000 $36.000 $25.000 $60.000 $70.900
REMOVING CONC (MEDIANS)
SY 14.000 $20.000 $37.000 $25.000 $100.000 $110.000
REMOVING CONC (DRIVEWAYS)
SY 141.000 $20.000 $40.000 $25.000 $63.150 $45.300
REMOVING CONC (CURB AND GUTTER)
LF 398.000 $10.000 $25.000 $7.500 $20.000 $46.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 340.000 $12.500 $18.000 $30.000 $30.000 $47.000
REMOVING CONC (PAVERS)
SY 39.000 $15.000 $23.000 $11.000 $67.500 $81.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 70.000 $4.500 $36.000 $10.000 $36.500 $59.000
EXCAVATION (ROADWAY)
CY 25.000 $35.000 $120.000 $25.000 $140.000 $194.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 25.000 $60.000 $220.000 $25.000 $165.000 $440.000
FURNISHING AND PLACING TOPSOIL (4")
SY 143.000 $3.000 $40.000 $5.000 $26.200 $44.000
BLOCK SODDING
SY 143.000 $10.000 $11.000 $10.000 $11.000 $29.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 143.000 $2.000 $5.500 $0.750 $5.500 $6.000
CELL FBR MLCH SEED(TEMP)(COOL)
SY 143.000 $2.000 $5.500 $0.750 $5.500 $6.000
VEGETATIVE WATERING
MG 5.000 $30.000 $280.000 $50.000 $320.000 $365.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 20.000 $50.000 $110.000 $100.000 $162.000 $128.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 5.000 $130.000 $580.000 $500.000 $756.000 $1,439.000
DRILL SHAFT (30 IN)
LF 8.000 $300.000 $870.000 $631.500 $682.500 $1,034.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 3.000 $750.000 $570.000 $1,000.000 $1,800.000 $790.000
ADJUSTING MANHOLES (WATER METER)
EA 1.000 $900.000 $760.000 $1,000.000 $2,100.000 $800.000
MOBILIZATION
LS 1.000 $115,000.000 $75,000.000 $80,000.000 $145,320.000 $149,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $15,000.000 $3,300.000 $5,000.000 $16,500.000 $19,200.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 95.000 $15.000 $11.000 $10.000 $11.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 95.000 $2.000 $2.750 $1.000 $2.750 $2.350
COLORED TEXTURED CONC (4")
SY 7.000 $150.000 $290.000 $130.000 $354.000 $1,216.000
COLORED TEXTURED CONC (8")
SY 54.000 $225.000 $200.000 $200.000 $265.000 $557.000
CONC CURB & GUTTER (TY II)
LF 36.000 $50.000 $56.000 $50.000 $62.400 $489.000
DRIVEWAYS (CONC) (HES)
SY 140.000 $125.000 $250.000 $130.000 $210.000 $212.000
CONC SIDEWALKS (4")
SY 114.000 $70.000 $140.000 $90.000 $150.000 $161.000
CURB RAMPS (TY 1)
EA 2.000 $2,500.000 $2,400.000 $2,000.000 $2,540.000 $1,720.000
CURB RAMPS (TY 2)
EA 3.000 $3,000.000 $6,000.000 $2,000.000 $2,865.000 $2,075.000
CURB RAMPS (TY 5)
EA 2.000 $3,800.000 $6,500.000 $2,000.000 $3,150.000 $2,135.000
CURB RAMPS (TY 7)
EA 2.000 $2,500.000 $6,200.000 $2,000.000 $3,612.000 $3,380.000
CURB RAMPS (TY 10)
EA 1.000 $2,500.000 $6,100.000 $2,000.000 $2,950.000 $3,320.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 90.000 $500.000 $400.000 $500.000 $325.000 $745.000
CURB RAMPS (SPECIAL)
SY 50.000 $350.000 $290.000 $230.000 $162.500 $450.000
CONC MEDIAN
SY 10.000 $150.000 $340.000 $150.000 $377.200 $850.000
RELOCATE RD IL ASM (SHOE-BASE)
EA 1.000 $8,000.000 $3,200.000 $3,565.000 $7,510.000 $9,710.000
CONDT (PVC) (SCH 40) (2")
LF 20.000 $70.000 $29.000 $29.000 $28.500 $159.000
CONDT (PVC) (SCH 40) (3")
LF 20.000 $17.000 $33.000 $46.000 $44.750 $195.000
CONDT (PVC) (SCH 40) (4")
LF 10.000 $40.000 $35.000 $53.500 $51.800 $218.000
ELEC CONDR (NO.6) BARE
LF 10.000 $2.300 $4.750 $8.500 $8.250 $37.000
ELEC CONDR (NO.2) BARE
LF 20.000 $4.500 $6.750 $9.000 $8.600 $47.000
ELEC CONDR (NO.2) INSULATED
LF 40.000 $5.000 $8.750 $15.000 $14.500 $53.000
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,500.000 $2,300.000 $1,923.000 $1,910.000 $5,000.000
GROUND BOX TY C (162911)
EA 2.000 $1,200.000 $1,900.000 $2,330.000 $2,265.000 $5,600.000
GROUND BOX TY C (162911)W/APRON
EA 1.000 $1,400.000 $2,400.000 $2,340.500 $2,275.000 $6,185.000
REMOVE GROUND BOX
EA 3.000 $250.000 $910.000 $341.000 $331.500 $1,177.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $800.000 $960.000 $650.000 $1,060.000 $883.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $800.000 $920.000 $725.000 $1,060.000 $942.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $600.000 $970.000 $400.000 $1,060.000 $765.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
EA 315.000 $120.000 $91.000 $75.000 $165.000 $64.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 750.000 $1.500 $4.500 $5.000 $2.750 $2.380
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,112.000 $1.800 $5.000 $5.000 $1.500 $2.650
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 998.000 $10.000 $12.000 $15.500 $14.500 $6.470
REFL PAV MRK TY II (W) 4" (DOT)
LF 750.000 $2.000 $3.000 $0.500 $1.050 $1.590
REFL PAV MRK TY II (W) 4" (SLD)
LF 1,531.000 $1.000 $3.000 $0.500 $1.050 $1.590
REFL PAV MRK TY II (W) 6" (DOT)
LF 1,112.000 $1.650 $3.750 $0.500 $1.050 $2.020
REFL PAV MRK TY II (W) 24" (SLD)
LF 998.000 $8.000 $6.750 $5.000 $7.090 $3.570
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 1,531.000 $0.750 $4.500 $4.000 $13.750 $2.380
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $250.000 $600.000 $415.500 $375.250 $324.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $300.000 $770.000 $415.500 $465.000 $412.000
PREFAB PAV MRK TY C (W)(BIKE ARROW)
EA 4.000 $140.000 $550.000 $234.000 $243.000 $295.000
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
EA 4.000 $200.000 $820.000 $364.000 $241.000 $442.000
TRAFFIC BUTTON TY W
EA 602.000 $50.000 $8.750 $4.500 $9.540 $4.710
ELIM EXT PAV MRK & MRKS (4")
LF 4,455.000 $0.500 $0.750 $1.500 $0.850 $0.420
ELIM EXT PAV MRK & MRKS (12")
LF 1,168.000 $1.750 $1.000 $4.000 $1.450 $0.500
ELIM EXT PAV MRK & MRKS (24")
LF 448.000 $3.250 $1.250 $8.000 $3.400 $0.650
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $60.000 $66.000 $104.000 $71.000 $36.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $65.000 $77.000 $104.000 $71.000 $42.000
ELIM EXT PAV MRK & MARKS (BIKE ARROW)
EA 1.000 $65.000 $66.000 $104.000 $71.000 $36.000
ELIM EXT PAV MRK & MARKS (BIKE SYMBOL)
EA 1.000 $70.000 $77.000 $104.000 $71.000 $42.000
PAV SURF PREP FOR MRK (4")
LF 2,361.000 $0.200 $0.750 $0.500 $0.340 $0.380
PAV SURF PREP FOR MRK (6")
LF 1,112.000 $0.800 $0.750 $0.500 $0.340 $0.400
PAV SURF PREP FOR MRK (24")
LF 998.000 $1.000 $1.000 $1.500 $2.790 $0.600
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $25.000 $44.000 $13.000 $34.100 $24.000
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $20.000 $55.000 $13.000 $34.100 $30.000
PAV SURF PREP FOR MRK (BIKE ARROW)
EA 4.000 $25.000 $44.000 $13.000 $34.100 $24.000
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 4.000 $30.000 $55.000 $13.000 $34.100 $30.000
PAV SURF PREP FOR MRK (RPM)
EA 602.000 $6.500 $1.000 $1.500 $0.100 $0.600
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $16,355.000 $9,100.000 $15,528.500 $15,085.000 $8,944.000
PED SIG SEC (LED)(COUNTDOWN)
EA 2.000 $815.000 $1,200.000 $1,134.500 $1,102.000 $2,006.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 1,270.000 $3.500 $3.750 $13.500 $12.900 $11.770
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 400.000 $4.000 $4.750 $15.500 $14.900 $17.650
PED POLE ASSEMBLY
EA 1.000 $3,000.000 $5,200.000 $3,235.000 $3,150.000 $5,130.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $1,025.000 $1,200.000 $2,042.000 $1,985.000 $3,201.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,500.000 $5,700.000 $6,063.000 $5,900.000 $6,146.000
D-GR HMA TY-B PG64-22
TON 6.000 $160.000 $750.000 $250.000 $400.000 $1,321.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $125.000 $64.000 $1.000 $150.000 $130.000
CONDUIT (PREPARE)
LF 570.000 $2.500 $2.250 $17.500 $17.000 $5.880
GROUND BOX (PREPARE)
EA 2.000 $700.000 $450.000 $51.500 $49.900 $2,060.000
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 7,404.000 $100.000 $68.000 $95.000 $68.500 $76.500
TMA (MOBILE OPERATION)
DAY 30.000 $450.000 $700.000 $325.000 $700.000 $900.000
Totals: $1,284,315.950 $1,020,976.250 $1,162,054.000 $1,202,338.690 $1,377,028.380