PREPARING ROW
|
STA
|
0.200
|
$2,000.000
|
$15,300.000
|
$20,750.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
619.000
|
$12.000
|
$31.300
|
$85.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
307.000
|
$8.000
|
$28.500
|
$76.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
19.000
|
$15.370
|
$24.000
|
$305.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8")
|
SY
|
79.000
|
$6.000
|
$18.000
|
$87.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
31.000
|
$70.000
|
$52.000
|
$100.000
|
|
|
BLOCK SODDING
|
SY
|
149.000
|
$4.000
|
$9.000
|
$8.500
|
|
|
VEGETATIVE WATERING
|
MG
|
1.500
|
$12.000
|
$40.000
|
$300.000
|
|
|
PLANE ASPH CONC PAV (1 1/4")
|
SY
|
44,671.000
|
$1.050
|
$1.420
|
$2.300
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
5,776.000
|
$4.160
|
$9.700
|
$20.000
|
|
|
CEM STABIL BKFL
|
CY
|
429.000
|
$54.050
|
$133.000
|
$255.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$60,000.000
|
$201,000.000
|
$325,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$10,000.000
|
$8,500.000
|
$2,500.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
300.000
|
$5.000
|
$4.500
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
170.000
|
$3.000
|
$5.600
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
170.000
|
$0.750
|
$2.200
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
40.000
|
$5.000
|
$6.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
40.000
|
$1.000
|
$3.000
|
$2.500
|
|
|
COLORED TEXTURED CONC (5")
|
SY
|
3,469.000
|
$70.000
|
$86.270
|
$129.000
|
|
|
CONC CURB (TY II)
|
LF
|
194.000
|
$30.000
|
$80.830
|
$75.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
300.000
|
$23.000
|
$94.340
|
$89.000
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
6,483.000
|
$20.060
|
$26.460
|
$42.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
57.000
|
$75.000
|
$99.000
|
$150.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$2,106.000
|
$986.000
|
$3,200.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
1.000
|
$2,356.000
|
$1,400.000
|
$3,675.000
|
|
|
CONC MEDIAN
|
SY
|
613.000
|
$75.000
|
$207.000
|
$164.000
|
|
|
CONC MEDIAN(MONO NOSE)
|
SY
|
90.000
|
$130.000
|
$375.000
|
$200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
27.000
|
$600.000
|
$732.000
|
$790.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$900.000
|
$975.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
3.000
|
$1,000.000
|
$850.000
|
$910.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
24.000
|
$88.630
|
$95.000
|
$102.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
2,810.000
|
$0.500
|
$0.670
|
$0.750
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
3,902.000
|
$0.750
|
$1.060
|
$1.150
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
255.000
|
$0.790
|
$1.100
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (W)8"(DOT)
|
LF
|
14.000
|
$2.250
|
$6.700
|
$7.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
2,275.000
|
$1.800
|
$2.250
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
37.000
|
$210.330
|
$106.000
|
$114.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
37.000
|
$235.000
|
$106.000
|
$114.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(DOT)
|
LF
|
22.000
|
$2.000
|
$4.500
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
18,325.000
|
$0.800
|
$0.560
|
$0.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,051.000
|
$0.850
|
$1.000
|
$1.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
36.000
|
$1.000
|
$1.000
|
$1.500
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
25.000
|
$1.500
|
$3.500
|
$4.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
385.000
|
$2.500
|
$2.500
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
4,729.000
|
$0.880
|
$1.100
|
$1.200
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
1,315.000
|
$6.980
|
$8.890
|
$9.500
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
43.000
|
$140.000
|
$139.000
|
$150.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
43.000
|
$160.000
|
$150.000
|
$162.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
|
LF
|
110.000
|
$4.700
|
$4.500
|
$5.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
40.000
|
$0.130
|
$1.150
|
$1.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
445.000
|
$0.300
|
$0.200
|
$0.200
|
|
|
PAVEMENT SEALER 24"
|
LF
|
228.000
|
$1.900
|
$0.400
|
$0.400
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
4.000
|
$25.000
|
$10.000
|
$11.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
4.000
|
$30.000
|
$10.000
|
$11.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
2,771.000
|
$0.410
|
$1.150
|
$1.200
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
610.000
|
$0.410
|
$1.400
|
$1.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
8.000
|
$3.300
|
$12.000
|
$12.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
34.000
|
$4.000
|
$6.000
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
400.000
|
$3.750
|
$6.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
8,040.000
|
$0.300
|
$0.500
|
$0.450
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
2,135.000
|
$0.750
|
$1.000
|
$0.850
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
154.000
|
$2.950
|
$3.000
|
$2.500
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
18.000
|
$61.000
|
$45.000
|
$48.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
11.000
|
$52.800
|
$45.000
|
$48.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
40.000
|
$0.040
|
$2.000
|
$1.200
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
445.000
|
$0.100
|
$0.200
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
228.000
|
$0.750
|
$0.400
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
4.000
|
$10.000
|
$10.000
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
4.000
|
$10.000
|
$10.000
|
$11.000
|
|
|
REMOVAL OF SIGNAL RELATED SIGNS
|
EA
|
1.000
|
$182.540
|
$240.000
|
$180.000
|
|
|
REPLACE OF SIGNAL RELATED SIGNS
|
EA
|
1.000
|
$370.000
|
$450.000
|
$450.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
3,071.000
|
$100.150
|
$147.700
|
$195.000
|
|
|
BONDING COURSE
|
GAL
|
4,467.000
|
$3.200
|
$5.000
|
$4.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$2,700.000
|
$9,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
114.000
|
$175.000
|
$300.000
|
$180.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
33.000
|
$300.000
|
$800.000
|
$180.000
|
|
Totals: |
$1,149,544.570
|
$1,790,660.920
|
$2,441,244.250
|