BRAZOS FM 1179 (1316-01-081)

Items: 73

County: BRAZOS
Length: N/A
Highway: FM 1179
District: BRYAN
Control Number: 1316-01-081
DBE Goal: N/A
Project: STP 2022(731)TAPS
Guaranty: N/A
Time: 223 WORKING DAYS
Engineer's Estimate: $4,124,936.15
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
JAMES ROBBINS
JOSEPH GREIVE
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (9)
E
Engineer's Estimate
$4,124,936.15
$4,034,958.95
Over/Under Est: -2.18% -$89,977.20
Over/Under Est: 11.34% $467,796.97
Amt Left: 13.82% $557,774.17
Over/Under Est: 16.44% $678,032.85
Amt Left: 19.03% $768,010.05
Delta: -4.58% -$210,235.88
$4,881,458.12
Over/Under Est: 18.34% $756,521.97
Amt Left: 20.98% $846,499.17
Delta: -1.63% -$78,489.12
$5,399,603.20
Over/Under Est: 30.9% $1,274,667.05
Amt Left: 33.82% $1,364,644.25
Delta: -10.61% -$518,145.08
$5,473,921.04
Over/Under Est: 32.7% $1,348,984.89
Amt Left: 35.66% $1,438,962.09
Delta: -1.38% -$74,317.84
Over/Under Est: 36.99% $1,525,749.85
Amt Left: 40.04% $1,615,727.05
Delta: -3.23% -$176,764.96
$5,964,743.14
Over/Under Est: 44.6% $1,839,806.99
Amt Left: 47.83% $1,929,784.19
Delta: -5.56% -$314,057.14
$5,994,954.45
Over/Under Est: 45.33% $1,870,018.30
Amt Left: 48.58% $1,959,995.50
Delta: -0.51% -$30,211.31
Subcontractor Percentage Amount
BAYER CONSTRUCTION ELECTRICAL CONTRACTORS, INC. 13.87% $596,109.75
QMF STEEL, INC. 2.23% $95,841.73
CEN-TREE SOLUTIONS LLC 1.38% $59,310.13
CEN TEX HYDROSEED, INC. 1.26% $54,152.72
TRP CONSTRUCTION GROUP, LLC 0.82% $35,242.25
KING GEORGE TRAFFIC SOLUTIONS LLC 0.65% $27,935.93
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.55% $23,638.09
Total: 20.76% $892,230.60

Bid Items & Bid Tabulations

73 Total 0 of 73
BRAZOS  |  FM 1179  |  BRYAN  |  1316-01-081  |  06/27/2023  |  $4,124,936.15  |  STP 2022(731)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  223 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
KNIFE RIVER CORPORATION - SOUTH
HIGHWAY 19 CONSTRUCTION LLC
BRAZOS PAVING, INC.
ENCINO LANDSCAPE, INC.
TI-ZACK CONCRETE, INC.
TEXAS MATERIALS GROUP, INC.
3LW CIVIL LLC
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 137.330 $500.000 $380.000 $340.000 $1,000.000 $65.000 $1,000.000 $1,100.000 $2,140.000 $1,500.000 $3,065.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 1.000 $575.000 $490.000 $450.000 $500.000 $365.000 $400.000 $440.000 $850.000 $795.000 $2,500.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 9.000 $750.000 $1,100.000 $990.000 $1,500.000 $1,250.000 $1,000.000 $990.000 $2,300.000 $2,222.000 $3,500.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 4.000 $1,900.000 $2,300.000 $2,100.000 $3,000.000 $2,000.000 $3,000.000 $2,200.000 $6,500.000 $2,406.250 $5,000.000
PREPARING ROW (HAND CLEARING)
AC 0.239 $20,000.000 $6,200.000 $5,600.000 $5,000.000 $28,970.000 $10,000.000 $5,500.000 $23,000.000 $22,500.000 $8,500.000
REMOVING CONC (DRIVEWAYS)
SY 2,089.000 $16.500 $12.000 $17.950 $25.000 $25.100 $30.000 $43.220 $26.000 $24.210 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 1,310.000 $6.250 $9.000 $11.500 $10.000 $12.750 $20.000 $13.780 $20.000 $19.700 $20.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 2,207.000 $14.500 $12.000 $17.000 $25.000 $25.000 $30.000 $20.450 $22.000 $38.880 $20.000
REMOVING STAB BASE & ASPH PAV (5" - 6")
SY 1,337.000 $6.500 $17.000 $15.400 $15.000 $16.000 $30.000 $33.770 $25.000 $18.450 $20.000
EXCAVATION (ROADWAY)
CY 1,842.000 $9.000 $20.000 $9.900 $25.000 $16.000 $30.000 $49.020 $25.000 $29.380 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 4,750.000 $21.000 $34.000 $32.000 $35.000 $35.600 $80.000 $55.770 $46.000 $47.230 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 34,998.000 $1.500 $1.500 $1.090 $3.000 $5.850 $4.000 $4.580 $3.500 $4.350 $10.000
BROADCAST SEED (TEMP) (WARM)
SY 17,502.000 $0.250 $0.250 $0.280 $1.000 $0.350 $0.100 $0.550 $0.250 $0.250 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 17,502.000 $0.250 $0.250 $0.280 $1.000 $0.350 $0.100 $0.550 $0.250 $0.250 $1.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 34,998.000 $4.250 $0.500 $0.500 $1.000 $0.600 $0.100 $3.300 $0.450 $0.450 $1.000
VEGETATIVE WATERING
MG 2,100.000 $17.500 $19.000 $41.800 $10.000 $50.000 $4.000 $27.500 $2.000 $75.000 $35.000
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 46.000 $18.000 $25.000 $20.000 $10.000 $23.500 $10.000 $5.500 $18.000 $18.000 $50.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,323.000 $58.000 $84.000 $47.740 $250.000 $53.300 $100.000 $104.500 $120.000 $90.000 $100.000
DRILL SHAFT (24 IN)
LF 312.000 $215.000 $300.000 $225.500 $350.000 $320.000 $225.000 $275.000 $200.000 $225.000 $300.000
RETAINING WALL (SPREAD FOOTING)
SF 6,530.000 $60.000 $71.000 $58.000 $75.000 $43.250 $80.000 $74.640 $120.000 $90.440 $65.000
RIPRAP (CONC)(5 IN)
CY 3.280 $750.000 $1,700.000 $1,200.000 $1,000.000 $684.250 $1,000.000 $1,100.000 $1,200.000 $675.470 $650.000
RAIL (HANDRAIL)(TY E)
LF 1,043.000 $155.000 $130.000 $126.500 $180.000 $120.000 $200.000 $150.300 $125.000 $168.650 $165.000
CONC BOX CULV (4 FT X 3 FT)
LF 48.000 $350.000 $450.000 $890.000 $700.000 $904.750 $600.000 $973.500 $550.000 $551.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 73.000 $80.000 $110.000 $72.200 $65.000 $144.000 $110.000 $313.500 $140.000 $100.000 $125.000
RC PIPE (CL III)(24 IN)
LF 225.000 $97.500 $110.000 $167.000 $90.000 $162.150 $140.000 $401.500 $180.000 $115.000 $250.000
RC PIPE (CL III)(30 IN)
LF 122.000 $132.500 $140.000 $250.000 $150.000 $216.600 $180.000 $489.500 $280.000 $145.000 $300.000
INLET (COMPL)(PAZD)(SL)(4FTX4FT)
EA 1.000 $7,500.000 $6,100.000 $7,330.000 $7,500.000 $6,260.000 $10,000.000 $10,175.000 $8,000.000 $8,000.000 $12,500.000
INLET (COMPL)(PAZD)(SL)(5FTX5FT)
EA 2.000 $9,000.000 $6,200.000 $10,550.000 $7,500.000 $6,430.000 $14,000.000 $11,550.000 $11,000.000 $10,000.000 $15,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 2.000 $1,400.000 $1,200.000 $1,200.000 $900.000 $2,500.000 $1,800.000 $4,950.000 $2,400.000 $2,550.000 $1,850.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 7.000 $4,500.000 $1,800.000 $1,660.000 $1,450.000 $3,200.000 $2,500.000 $6,110.500 $3,300.000 $2,700.000 $3,500.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 3.000 $2,800.000 $2,200.000 $2,770.000 $3,500.000 $3,800.000 $3,200.000 $9,350.000 $4,000.000 $4,600.000 $4,500.000
SET (TY II) (DES 2) (RCP) (4: 1) (C)
EA 2.000 $4,000.000 $4,500.000 $2,220.000 $3,000.000 $11,035.000 $3,000.000 $9,350.000 $5,600.000 $16,000.000 $3,500.000
CAST-IN-PLACE TRENCH DRAIN
LF 80.000 $525.000 $1,100.000 $944.400 $250.000 $500.000 $110.000 $621.740 $500.000 $700.000 $1,000.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 19.000 $600.000 $84.000 $850.000 $500.000 $850.000 $800.000 $475.200 $1,000.000 $1,100.000 $1,100.000
REMOV STR (SET)
EA 1.000 $575.000 $400.000 $833.000 $1,000.000 $500.000 $800.000 $1,705.000 $400.000 $1,100.000 $500.000
REMOV STR (PIPE)
LF 11.000 $30.000 $48.000 $67.000 $50.000 $60.500 $120.000 $55.000 $100.000 $1,100.000 $100.000
MOBILIZATION
LS 1.000 $232,500.000 $345,000.000 $575,400.000 $436,633.000 $410,000.000 $500,000.000 $473,220.000 $500,000.000 $607,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $9,500.000 $1,600.000 $5,752.000 $5,000.000 $11,081.000 $8,000.000 $4,400.000 $11,000.000 $20,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 90.000 $65.000 $49.000 $42.200 $100.000 $49.500 $80.000 $5.500 $38.000 $38.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 90.000 $12.000 $15.000 $11.000 $20.000 $13.000 $20.000 $5.500 $10.000 $10.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,180.000 $3.500 $6.250 $5.000 $5.000 $5.850 $5.000 $3.300 $4.500 $4.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,180.000 $1.150 $1.750 $1.100 $2.000 $1.300 $1.000 $1.100 $1.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 200.000 $6.500 $6.250 $5.000 $10.000 $5.850 $10.000 $5.500 $4.500 $4.500 $18.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 200.000 $1.800 $6.250 $5.000 $1.000 $5.850 $1.000 $1.100 $4.500 $4.500 $9.000
CONC CURB (MONO) (TY II)
LF 722.000 $5.000 $2.750 $5.000 $35.000 $18.400 $20.000 $44.060 $25.000 $20.000 $55.000
CONC CURB (SPECIAL) (TYPE II)
LF 95.000 $25.000 $59.000 $210.000 $100.000 $65.850 $60.000 $52.690 $125.000 $74.000 $100.000
CONCRETE CURB (SPECIAL)
LF 212.000 $35.000 $31.000 $45.000 $100.000 $63.000 $80.000 $52.690 $93.000 $105.000 $100.000
DRIVEWAYS (CONC) (HES)
SY 2,381.000 $95.000 $85.000 $96.950 $120.000 $115.300 $160.000 $108.500 $140.000 $145.000 $165.000
CONC SIDEWALKS (6")
SY 16,390.000 $75.000 $71.000 $85.700 $85.000 $86.100 $80.000 $96.000 $89.000 $98.000 $85.000
CURB RAMPS (TY 7)
SY 285.000 $85.000 $140.000 $250.000 $150.000 $850.000 $180.000 $125.290 $440.000 $105.000 $350.000
WIRE FENCE (TY A)
LF 110.000 $20.000 $8.000 $25.500 $25.000 $50.750 $40.000 $22.000 $25.000 $32.000 $30.000
RELOCATE EXISTING MAILBOX
EA 1.000 $250.000 $150.000 $550.000 $350.000 $403.000 $500.000 $363.000 $330.000 $389.000 $850.000
RELOCATE RD IL ASM (U/P)
EA 3.000 $850.000 $1,300.000 $2,770.000 $350.000 $1,335.000 $3,000.000 $256.300 $2,500.000 $650.000 $1,500.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 4.000 $750.000 $570.000 $833.000 $7,500.000 $600.000 $3,000.000 $482.900 $750.000 $1,500.000 $1,500.000
CONDT (PVC) (SCH 40) (2")
LF 9,285.000 $17.250 $9.500 $13.330 $7.000 $10.150 $10.000 $9.680 $12.000 $12.000 $12.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 795.000 $35.000 $26.000 $41.000 $25.000 $27.800 $40.000 $24.310 $37.000 $20.000 $40.000
ELEC CONDR (NO.10) INSULATED
LF 1,440.000 $2.250 $2.000 $1.700 $5.000 $2.000 $2.000 $1.730 $1.500 $1.650 $3.000
ELEC CONDR (NO.8) INSULATED
LF 2,880.000 $2.150 $2.250 $2.220 $6.000 $2.400 $2.500 $2.010 $2.000 $2.000 $3.000
ELEC CONDR (NO.6) INSULATED
LF 8,165.000 $2.550 $2.500 $2.780 $4.000 $2.680 $3.000 $2.390 $2.500 $2.250 $3.000
ELEC CONDR (NO.2/0) INSULATED
LF 16,330.000 $7.750 $7.250 $6.110 $5.000 $7.550 $8.000 $8.580 $5.500 $6.000 $10.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $665.000 $930.000 $921.300 $1,100.000 $988.000 $800.000 $880.000 $710.000 $792.000 $1,150.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 29.000 $475.000 $330.000 $493.500 $850.000 $345.000 $600.000 $495.000 $430.000 $350.000 $1,150.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 2.000 $425.000 $92.000 $165.000 $350.000 $97.650 $600.000 $176.000 $160.000 $75.000 $850.000
REMOVE SM RD SN SUP&AM
EA 40.000 $125.000 $97.000 $145.000 $100.000 $102.850 $200.000 $55.000 $150.000 $100.000 $50.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 953.000 $8.000 $8.500 $11.110 $15.000 $9.050 $15.000 $13.200 $10.000 $10.000 $20.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 953.000 $4.000 $0.750 $2.220 $15.000 $0.900 $10.000 $4.400 $2.000 $4.000 $20.000
ELIM EXT PAV MRK & MRKS (24")
LF 171.000 $3.850 $5.250 $2.940 $10.000 $5.550 $5.000 $4.950 $2.700 $5.140 $20.000
PAV SURF PREP FOR MRK (24")
LF 953.000 $1.100 $0.750 $0.560 $25.000 $0.750 $2.000 $0.330 $0.500 $0.800 $20.000
RELOCATE PED POLE ASSEMBLY
EA 1.000 $2,500.000 $1,800.000 $5,550.000 $5,000.000 $1,923.000 $3,200.000 $2,157.100 $5,000.000 $2,500.000 $3,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $6,100.000 $24,880.000 $20,000.000 $12,683.000 $15,000.000 $1.100 $15,000.000 $10,000.000 $16,500.000
TMA (STATIONARY)
DAY 90.000 $325.000 $260.000 $580.000 $500.000 $162.750 $500.000 $1.100 $200.000 $200.000 $250.000
IN RD IL AM (TY ST) 35T-15(250W)S
EA 49.000 $7,500.000 $7,700.000 $6,100.000 $850.000 $8,135.000 $9,000.000 $6,019.200 $6,500.000 $8,500.000 $8,000.000
REMOVE AND RELOCATE FIRE HYDRANT
EA 1.000 $4,250.000 $2,400.000 $3,890.000 $5,000.000 $6,040.000 $4,500.000 $20,350.000 $5,000.000 $5,000.000 $7,500.000
Totals: $4,124,936.150 $4,034,958.950 $4,592,733.120 $4,802,969.000 $4,881,458.120 $5,399,603.200 $5,473,921.040 $5,650,686.000 $5,964,743.142 $5,994,954.450