BRAZOS HOLLEMAN DR (0917-29-148)

Items: 43

County: BRAZOS
Length: 0.0000 MILES
Highway: HOLLEMAN DR
District: BRYAN
Control Number: 0917-29-148
DBE Goal: 0.0%
Project: STP 2025(890)VRUG
Guaranty: $2,000.00
Time: 39 WORKING DAYS
Engineer's Estimate: $100,612.19
Date: 07/01/2025 (11 months ago)
Contract Number: 7253037
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00209975
Contract Type: Federal Waived
Project Description: INSTALL PEDESTRIAN CROSSWALK
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JAMES ROBBINS
JOSEPH GREIVE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$100,612.19
Over/Under Est: -10.7% -$10,764.48
$129,882.94
Over/Under Est: 29.09% $29,270.75
Amt Left: 44.56% $40,035.23
Over/Under Est: 40.66% $40,906.81
Amt Left: 57.51% $51,671.29
Delta: -8.96% -$11,636.06
Over/Under Est: 41.05% $41,304.81
Amt Left: 57.95% $52,069.29
Delta: -0.28% -$398.00
Subcontractor Percentage Amount
TRAFFIC SIGNS & LINES, LLC 28.70% $25,786.29
THIRD COAST SERVICES LLC 27.82% $24,995.63
Total: 56.52% $50,781.92

Bid Items & Bid Tabulations

43 Total 0 of 43
BRAZOS  |  HOLLEMAN DR  |  BRYAN  |  0917-29-148  |  07/01/2025  |  $100,612.19  |  STP 2025(890)VRUG  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  39 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MB WESTERN INDUSTRIAL CONTRACTING CO.
BRAZOS PAVING, INC.
LARRY YOUNG PAVING, INC.
CROSS PLUS CONSTRUCTION, LLC
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 37.000 $39.340 $31.000 $150.000 $20.000 $20.000
REMOV CONC (CURB & GUTTER)
LF 40.000 $27.590 $25.000 $43.600 $28.000 $50.000
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
SY 33.000 $16.280 $18.500 $56.800 $100.000 $50.000
FURN & PLACE TOPSOIL (4")
SY 15.000 $5.680 $6.200 $57.400 $5.000 $150.000
BLOCK SODDING
SY 15.000 $12.000 $12.300 $75.000 $76.000 $15.000
VEGETATIVE WATERING
TGL 0.150 $150.000 $123.000 $3,112.000 $5,800.000 $5,000.000
DRILL SHAFT (12 IN)
LF 12.000 $500.000 $560.000 $590.000 $650.000 $150.000
MOBILIZATION
LS 1.000 $10,010.200 $12,500.000 $24,000.000 $24,400.000 $10,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $3,500.000 $2,460.000 $4,700.000 $6,900.000 $1,000.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 71.000 $8.400 $12.300 $13.000 $15.000 $1.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 71.000 $3.030 $6.200 $6.500 $7.500 $1.000
CONC SIDEWALKS (6")
SY 19.000 $85.000 $184.500 $151.900 $340.000 $300.000
CURB RAMPS (TY 2)
EA 2.000 $4,250.000 $4,305.000 $2,800.000 $4,200.000 $1,800.000
CURB RAMPS (TY 21)
EA 1.000 $4,250.000 $4,920.000 $2,070.000 $6,000.000 $2,000.000
CONC MEDIAN
SY 12.000 $248.630 $246.000 $835.000 $700.000 $600.000
ALUMINUM SIGNS (TY A)
SF 40.000 $45.670 $27.000 $35.000 $52.000 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000 $839.200 $658.000 $1,280.000 $810.000 $1,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $495.030 $535.000 $1,275.000 $660.000 $2,000.000
REMOVE SM RD SN SUP&AM
EA 1.000 $111.680 $123.000 $170.000 $150.000 $100.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 785.000 $1.250 $1.250 $1.750 $1.500 $5.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 80.000 $2.700 $3.690 $3.500 $4.500 $8.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 1,395.000 $1.250 $1.230 $1.750 $1.500 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 66.000 $2.000 $3.690 $2.600 $4.500 $10.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 76.000 $11.400 $14.150 $13.000 $17.000 $30.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 1.000 $260.000 $246.000 $385.000 $300.000 $10.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 $270.000 $252.000 $360.000 $310.000 $10.000
PAVEMENT SLER 4"
LF 998.000 $0.570 $0.620 $0.150 $0.750 $14.000
PAVEMENT SLER 8"
LF 66.000 $1.310 $1.230 $0.300 $1.500 $14.000
PAVEMENT SLER 24"
LF 76.000 $4.100 $3.690 $0.950 $4.500 $14.000
PAVEMENT SLER (ARROW)
EA 1.000 $64.120 $23.400 $19.500 $29.000 $800.000
PAVEMENT SLER (WORD)
EA 1.000 $64.120 $23.400 $19.500 $29.000 $500.000
REFL PAV MRK TY I (W)4"(SLD)(100MIL)
LF 448.000 $3.500 $1.540 $1.750 $2.000 $10.000
REFL PAV MRK TY I (Y)4"(BRK)(100MIL)
LF 60.000 $1.500 $2.460 $1.750 $3.000 $10.000
REFL PAV MRK TY I (Y)4"(SLD)(100MIL)
LF 490.000 $1.740 $1.540 $1.750 $2.000 $10.000
REFL PAV MRKR TY I-C
EA 4.000 $6.700 $12.300 $7.800 $15.000 $500.000
REFL PAV MRKR TY II-A-A
EA 12.000 $12.070 $12.300 $7.800 $15.000 $400.000
ELIM EXT PM & MRKS (4")
LF 1,040.000 $2.300 $1.230 $5.600 $1.500 $6.000
PAV SURF PREP FOR MRK (4")
LF 998.000 $0.750 $0.120 $0.080 $0.250 $10.000
PAV SURF PREP FOR MRK (8")
LF 66.000 $1.200 $0.250 $0.150 $0.250 $10.000
PAV SURF PREP FOR MRK (24")
LF 76.000 $2.390 $0.740 $0.300 $1.000 $20.000
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $50.520 $8.610 $6.500 $11.000 $400.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $56.180 $8.610 $6.500 $11.000 $500.000
REC RAPID FLASH BEACON (2-WAY SOLAR)
EA 2.000 $16,000.000 $11,450.000 $11,970.000 $15,000.000 $11,000.000
Totals: $100,612.190 $89,847.710 $129,882.940 $141,519.000 $141,917.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $5,000.00