Show Job Controls
Bid Cobra

BRAZOS VA (0917-29-129)

Items: 94

County: BRAZOS
Length: N/A
Highway: VA
District: BRYAN
Control Number: 0917-29-129
DBE Goal: N/A
Project: STP 2017(099)TAPS
Guaranty: N/A
Time: 140 WORKING DAYS
Engineer's Estimate: $1,875,783.66
Date: 08/08/2017 (8 years ago)
Contract Number: N/A
Type: PEDESTRIAN AND BICYCLE IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,875,783.66
$1,803,581.23
Over/Under Est: -3.85% -$72,202.43
$2,145,570.10
Over/Under Est: 14.38% $269,786.44
Amt Left: 18.96% $341,988.87
$2,431,897.00
Over/Under Est: 29.65% $556,113.34
Amt Left: 34.84% $628,315.77
Delta: -13.35% -$286,326.90
Over/Under Est: 42.43% $795,831.98
Amt Left: 48.13% $868,034.41
Delta: -9.86% -$239,718.64
Over/Under Est: 70.89% $1,329,814.21
Amt Left: 77.74% $1,402,016.64
Delta: -19.99% -$533,982.23

Bid Items & Bid Tabulations

94 Total 0 of 94
BRAZOS  |  VA  |  BRYAN  |  0917-29-129  |  08/08/2017  |  $1,875,783.66  |  STP 2017(099)TAPS  |  PEDESTRIAN AND BICYCLE IMPRVS  |  140 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
TI-ZACK CONCRETE, INC.
FNH CONSTRUCTION, LLC
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
PREPARING ROW
STA 14.000 $2,900.000 $1,200.000 $800.000 $5,000.000 $2,000.000 $2,545.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 4.000 $550.000 $450.000 $500.000 $500.000 $750.000 $600.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 5.000 $900.000 $750.000 $600.000 $1,000.000 $1,250.000 $600.000
REMOVING CONC (PAV)
SY 761.000 $6.000 $10.000 $15.000 $20.000 $20.000 $21.000
REMOVING CONC (DRIVEWAYS)
SY 2,903.000 $15.000 $10.000 $12.000 $20.000 $20.000 $21.000
REMOVING CONC (CURB)
LF 720.000 $5.000 $6.000 $4.000 $12.500 $12.500 $8.650
REMOVING CONC (CURB AND GUTTER)
LF 1,568.000 $6.000 $7.000 $5.000 $15.000 $12.500 $8.000
REMOVING CONC (RETAINING WALLS)
SY 8.000 $50.000 $40.000 $150.000 $25.000 $100.000 $61.000
REMOVING CONC (MISC)
SY 2.000 $30.000 $20.000 $30.000 $25.000 $100.000 $250.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 598.000 $16.000 $10.000 $12.000 $25.000 $15.000 $21.450
REMOVE STAB BASE & ASPH PAV (4"-5")
SY 694.000 $7.700 $10.000 $10.000 $17.500 $10.000 $8.600
EXCAVATION (ROADWAY)
CY 418.000 $8.500 $20.000 $22.000 $20.000 $65.000 $33.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 418.000 $10.000 $20.000 $35.000 $35.000 $65.000 $37.000
FURNISHING AND PLACING TOPSOIL (6")
SY 7,050.000 $1.250 $2.000 $2.000 $3.250 $2.500 $12.500
BLOCK SODDING
SY 7,050.000 $3.250 $4.000 $4.000 $5.500 $6.000 $3.610
CELL FBR MLCH SEED(TEMP)(COOL)
SY 7,050.000 $0.260 $0.410 $0.400 $1.000 $0.300 $0.290
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 7,050.000 $1.200 $0.300 $0.400 $1.000 $0.650 $0.120
VEGETATIVE WATERING
MG 422.900 $15.000 $10.000 $25.000 $35.000 $15.000 $25.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 1,526.000 $13.000 $14.750 $12.000 $30.000 $50.000 $28.330
LIME (HYDRATED LIME (DRY))
TON 115.000 $190.000 $170.000 $200.000 $210.000 $200.000 $225.000
LIME TRT(MIX EXST MATL & NEW BASE)(8")
SY 6,402.000 $2.250 $6.000 $6.000 $3.500 $6.000 $20.000
CEMENT
TON 12.000 $145.000 $300.000 $200.000 $171.000 $200.000 $305.000
CEMENT TREAT (NEW BASE) (6")
SY 1,526.000 $2.100 $9.000 $5.000 $4.000 $10.000 $24.500
CONC PAV (JOINT REINF) (6")
SY 2,823.000 $65.000 $55.000 $85.000 $78.500 $80.000 $56.000
FULL - DEPTH REPAIR CPJR (8")
SY 24.000 $400.000 $100.000 $150.000 $500.000 $500.000 $300.000
TRENCH EXCAVATION PROTECTION
LF 47.000 $127.000 $1.000 $10.000 $3.500 $25.000 $15.350
DRILL SHAFT (24 IN)
LF 48.000 $135.000 $130.000 $220.000 $150.000 $200.000 $350.000
RIPRAP (CONC)(6 IN)
CY 12.000 $525.000 $350.000 $600.000 $650.000 $625.000 $280.000
RAIL (HANDRAIL)(TY F)
LF 62.000 $90.000 $245.000 $125.000 $250.000 $300.000 $130.000
RC PIPE (CL III)(15 IN)
LF 5.000 $50.000 $100.000 $70.000 $75.000 $125.000 $195.000
RC PIPE (CL III)(18 IN)
LF 46.000 $55.000 $100.000 $80.000 $85.000 $150.000 $45.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $3,300.000 $5,500.000 $3,500.000 $5,000.000 $3,500.000 $6,900.000
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 2.000 $5,200.000 $7,500.000 $4,000.000 $5,000.000 $5,750.000 $5,900.000
INLET (COMPL)(PCO)(5FT)(NONE)
EA 1.000 $6,700.000 $5,500.000 $7,500.000 $5,000.000 $6,500.000 $7,300.000
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 1.000 $6,500.000 $5,500.000 $7,500.000 $5,000.000 $7,000.000 $7,900.000
INLET (COMPL)(PCU)(5FT)(NONE)
EA 1.000 $5,600.000 $6,500.000 $7,500.000 $5,000.000 $6,000.000 $7,200.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 1.000 $1,000.000 $1,500.000 $2,000.000 $1,850.000 $850.000 $800.000
ADJUSTING MANHOLES (SANITARY)
EA 2.000 $2,000.000 $1,250.000 $550.000 $1,500.000 $1,250.000 $905.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 11.000 $350.000 $100.000 $200.000 $1,500.000 $500.000 $375.000
ADJUSTING MANHOLES (WATER METER)
EA 8.000 $100.000 $135.000 $200.000 $1,500.000 $500.000 $445.000
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 1.000 $550.000 $350.000 $200.000 $1,500.000 $1,500.000 $415.000
REMOV STR (INLET)
EA 1.000 $620.000 $1,500.000 $550.000 $1,500.000 $1,500.000 $1,600.000
REMOV STR (SET)
EA 1.000 $380.000 $650.000 $550.000 $1,500.000 $500.000 $1,100.000
MOBILIZATION
LS 1.000 $200,000.000 $165,000.000 $325,000.000 $200,000.000 $265,000.000 $320,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,500.000 $1,000.000 $1,000.000 $8,500.000 $2,500.000 $8,790.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,533.000 $3.500 $4.250 $0.100 $12.000 $5.000 $4.950
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,533.000 $1.000 $1.200 $0.100 $8.000 $1.000 $0.400
LANDSCAPE PAVERS
SY 559.000 $64.000 $64.000 $75.000 $180.000 $90.000 $198.660
CONC CURB (TY II)
LF 49.000 $12.500 $10.000 $30.000 $30.000 $40.000 $31.250
CONC CURB (MONO) (TY II)
LF 1,226.000 $5.000 $10.000 $25.000 $10.000 $25.000 $31.400
CONC CURB & GUTTER (TY I)
LF 30.000 $23.500 $29.500 $40.000 $35.000 $50.000 $43.600
CONC CURB & GUTTER (TY II)
LF 3,052.000 $24.000 $29.500 $32.000 $42.500 $30.000 $36.600
INTERSECTIONS (CONC)
SY 692.000 $100.000 $65.000 $85.000 $85.000 $130.000 $208.000
INTERSECTIONS (ACP)
SY 158.000 $30.000 $100.000 $45.000 $42.000 $135.000 $270.000
DRIVEWAYS (CONC) (HES)
SY 1,657.000 $80.000 $50.000 $70.000 $115.000 $130.000 $89.550
CONC SIDEWALKS (6")
SY 2,368.000 $54.000 $50.000 $71.000 $62.000 $102.080 $113.550
CURB RAMPS (TY 1)
EA 6.000 $1,600.000 $750.000 $1,500.000 $1,850.000 $1,850.000 $1,800.000
CURB RAMPS (TY 3)
EA 3.000 $1,400.000 $1,100.000 $1,500.000 $1,850.000 $1,700.000 $2,400.000
CURB RAMPS (TY 7)
EA 14.000 $1,500.000 $750.000 $1,500.000 $1,850.000 $1,750.000 $1,800.000
CURB RAMPS (TY 10)
EA 11.000 $1,800.000 $750.000 $1,500.000 $1,850.000 $1,850.000 $1,800.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 1,325.000 $75.000 $52.000 $100.000 $75.000 $105.000 $217.000
CONDT (PVC) (SCH 40) (2")
LF 6,680.000 $10.000 $15.000 $12.000 $12.000 $20.000 $20.600
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,125.000 $22.000 $32.000 $25.000 $30.000 $35.000 $24.070
ELEC CONDR (NO.8) INSULATED
LF 8,805.000 $1.150 $3.000 $3.000 $2.000 $3.500 $2.110
ELEC CONDR (NO.2) INSULATED
LF 17,610.000 $2.350 $4.000 $4.000 $2.000 $4.500 $3.920
GROUND BOX TY D (162922)
EA 3.000 $750.000 $1,200.000 $850.000 $650.000 $1,200.000 $1,102.480
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 43.000 $460.000 $1,000.000 $250.000 $650.000 $350.000 $421.720
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $475.000 $370.000 $250.000 $500.000 $325.000 $391.590
REMOVE SM RD SN SUP&AM
EA 26.000 $90.000 $350.000 $250.000 $50.000 $75.000 $90.370
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 12,810.000 $0.600 $0.350 $0.600 $0.500 $0.600 $1.600
REFL PAV MRK TY I (W)4"(LNDP)(100MIL)
LF 459.000 $1.100 $2.500 $2.400 $1.000 $2.200 $3.010
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 745.000 $5.400 $7.000 $7.500 $8.000 $6.800 $8.430
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 51.000 $220.000 $255.000 $300.000 $250.000 $280.000 $307.250
REFL PAV MRK TY I (Y)8"(SLD)(060MIL)
LF 12.000 $1.700 $5.000 $3.500 $10.000 $3.200 $6.020
REFL PAV MRK TY II (W) 4" (SLD)
LF 459.000 $0.150 $0.320 $0.600 $2.000 $0.600 $0.390
REFL PAV MRK TY II (W) 24" (SLD)
LF 745.000 $2.400 $1.700 $2.500 $10.000 $2.200 $2.050
REFL PAV MRK TY II (W) (BIKE SYMBOL)
EA 51.000 $90.000 $35.000 $35.000 $250.000 $30.000 $42.170
REFL PAV MRK TY II (Y) 8" (SLD)
LF 12.000 $0.450 $0.750 $0.600 $3.000 $0.600 $0.900
ELIM EXT PAV MRK & MRKS (4")
LF 12.000 $0.380 $12.000 $2.000 $1.000 $1.600 $14.460
ELIM EXT PAV MRK & MRKS (24")
LF 33.000 $3.000 $24.000 $8.000 $20.000 $6.800 $28.920
PAV SURF PREP FOR MRK (4")
LF 459.000 $0.100 $1.000 $0.100 $1.000 $0.100 $1.200
PAV SURF PREP FOR MRK (8")
LF 12.000 $0.250 $2.000 $0.200 $5.000 $0.200 $2.410
PAV SURF PREP FOR MRK (24")
LF 745.000 $1.200 $3.000 $1.100 $10.000 $1.000 $3.610
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 51.000 $10.000 $50.000 $11.000 $150.000 $10.000 $60.250
PED SIG SEC (LED)(COUNTDOWN)
EA 14.000 $710.000 $1,000.000 $1,000.000 $1,850.000 $1,500.000 $1,150.680
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 616.000 $2.000 $3.000 $6.000 $2.000 $3.500 $3.610
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 296.000 $2.250 $4.000 $12.000 $2.000 $4.500 $6.020
PED POLE ASSEMBLY
EA 6.000 $1,900.000 $2,500.000 $3,000.000 $1,850.000 $3,000.000 $2,288.110
PED DETECT PUSH BUTTON (APS)
EA 14.000 $1,000.000 $900.000 $1,250.000 $1,350.000 $950.000 $2,383.290
TREE PROTECTION
EA 35.000 $400.000 $175.000 $250.000 $500.000 $150.000 $2,525.000
WHEEL STOPS
EA 3.000 $145.000 $125.000 $450.000 $200.000 $150.000 $320.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $4,500.000 $2,500.000 $16,500.000 $5,000.000 $3,000.000
IN RD IL AM (TY ST) 35T-15(250W)S
EA 48.000 $4,150.000 $4,565.000 $3,500.000 $3,500.000 $4,500.000 $5,560.610
REMOVE AND RELOCATE ILLUMINATED SIGNS
EA 1.000 $7,500.000 $3,855.000 $5,000.000 $2,500.000 $4,000.000 $9,337.980
Totals: $1,875,783.660 $1,803,581.230 $2,145,570.100 $2,431,897.000 $2,671,615.640 $3,205,597.870