Show Job Controls
Bid Cobra

BRAZOS VA (0917-00-073)

Items: 42

County: BRAZOS
Length: N/A
Highway: VA
District: BRYAN
Control Number: 0917-00-073
DBE Goal: N/A
Project: F 2023(396)
Guaranty: N/A
Time: 45 WORKING DAYS
Engineer's Estimate: $888,739.00
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
DELMY REYES
MATT HENSARLING
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$888,739.00
$844,757.00
Over/Under Est: -4.95% -$43,982.00
Over/Under Est: 3.35% $29,745.98
Amt Left: 8.73% $73,727.98
Subcontractor Percentage Amount
RAILPROS FIELD SERVICES, INC. 1.89% $15,965.91
Total: 1.89% $15,965.91

Bid Items & Bid Tabulations

42 Total 0 of 42
BRAZOS  |  VA  |  BRYAN  |  0917-00-073  |  05/04/2023  |  $888,739.00  |  F 2023(396)  |  BRIDGE MAINT  |  45 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GARRET SHIELDS INFRASTRUCTURE
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
PREPARING ROW
AC 0.020 $50,000.000 $200,000.000 $50,000.000
REMOVING CONC (RIPRAP)
SY 276.000 $30.000 $50.000 $50.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 348.000 $40.000 $50.000 $45.000
FURNISHING AND PLACING TOPSOIL (4")
SY 2,001.000 $5.000 $3.000 $4.000
BLOCK SODDING
SY 2,001.000 $8.000 $6.000 $7.000
VEGETATIVE WATERING
MG 33.000 $50.000 $50.000 $100.000
FLOWABLE BACKFILL
CY 271.000 $350.000 $400.000 $250.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 209.000 $230.000 $230.000 $280.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 1.300 $4,000.000 $5,000.000 $3,500.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 56.000 $700.000 $500.000 $650.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 161.000 $250.000 $200.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 102.000 $660.000 $500.000 $600.000
RETROFIT RAIL (TY T131RC)
LF 519.000 $220.000 $220.000 $264.000
MOBILIZATION
LS 1.000 $90,500.000 $75,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $7,000.000 $5,000.000 $3,900.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 546.000 $40.000 $1.000 $55.000
CONSTRUCTION EXITS (REMOVE)
SY 546.000 $30.000 $1.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,730.000 $4.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,730.000 $2.000 $1.000 $2.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000 $7,000.000 $8,000.000 $6,000.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 600.000 $80.000 $100.000 $88.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,560.000 $15.000 $10.000 $25.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 600.000 $15.000 $15.000 $20.000
CONC CURB (TY II)
LF 152.000 $35.000 $30.000 $55.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,300.000 $26.000 $35.000 $28.740
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,600.000 $2,000.000 $1,890.000
REMOVE METAL BEAM GUARD FENCE
LF 350.000 $5.000 $2.000 $2.810
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $300.000 $500.000 $281.250
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,600.000 $3,500.000 $3,577.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $300.000 $500.000 $281.250
CRASH CUSH ATTEN (MOVE & RESET)
EA 8.000 $1,000.000 $1,000.000 $2,092.500
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1,000.000 $1,665.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,000.000 $15,000.000 $4,584.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 30.000 $50.000 $15.000 $45.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 730.000 $2.000 $3.000 $1.180
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 96.000 $10.000 $9.000 $23.920
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 8,640.000 $1.000 $2.000 $1.360
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 34.000 $2.000 $2.000 $10.000
REFL PAV MRKR TY II-A-A
EA 144.000 $7.000 $6.000 $15.940
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $5,000.000 $5,000.000 $5,000.000
TMA (STATIONARY)
DAY 46.000 $300.000 $300.000 $250.000
TMA (MOBILE OPERATION)
DAY 4.000 $300.000 $300.000 $250.000
Totals: $888,739.000 $844,757.000 $918,484.980