PREPARING ROW
|
STA
|
97.000
|
$1,000.000
|
$1,400.000
|
$430.000
|
$778.000
|
$1,500.000
|
$5,230.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
881.000
|
$50.000
|
$35.000
|
$16.000
|
$10.650
|
$30.000
|
$24.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
142.000
|
$24.000
|
$25.000
|
$16.000
|
$16.000
|
$16.000
|
$33.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
209.000
|
$6.320
|
$20.000
|
$44.000
|
$25.300
|
$16.000
|
$11.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
33,097.000
|
$14.000
|
$12.000
|
$19.000
|
$22.500
|
$20.000
|
$18.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,727.000
|
$18.000
|
$14.000
|
$15.000
|
$36.800
|
$20.000
|
$22.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
STA
|
383.000
|
$200.000
|
$200.000
|
$300.000
|
$305.000
|
$220.000
|
$200.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
68,002.000
|
$0.350
|
$0.180
|
$0.250
|
$0.200
|
$0.350
|
$0.180
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
34,001.000
|
$0.250
|
$0.140
|
$0.250
|
$0.160
|
$0.350
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
34,001.000
|
$0.250
|
$0.140
|
$0.250
|
$0.160
|
$0.350
|
$0.140
|
|
|
VEGETATIVE WATERING
|
MG
|
0.680
|
$15.000
|
$1,500.000
|
$210.000
|
$100.000
|
$50.000
|
$100.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
126,238.000
|
$18.000
|
$19.950
|
$25.000
|
$18.790
|
$25.000
|
$25.500
|
|
|
REWORK BS MTL (TY B) (6") (ORD COMP)
|
SY
|
98,973.000
|
$3.750
|
$3.540
|
$3.000
|
$4.150
|
$5.000
|
$3.800
|
|
|
CEMENT
|
TON
|
2,007.000
|
$250.000
|
$260.000
|
$300.000
|
$250.000
|
$300.000
|
$250.000
|
|
|
CEMENT TREAT (EXIST MATL) (10")
|
SY
|
142,744.000
|
$4.750
|
$2.800
|
$4.250
|
$1.130
|
$4.000
|
$2.200
|
|
|
CM TRT(PT MX)(CL L)(TYA)(GR1-2)(FN POS)
|
CY
|
113.000
|
$150.000
|
$222.000
|
$220.000
|
$413.000
|
$300.000
|
$243.000
|
|
|
ASPH (AC-20XP)
|
GAL
|
64,679.000
|
$4.250
|
$6.000
|
$5.250
|
$4.120
|
$4.500
|
$6.000
|
|
|
ASPH (RC-250)
|
GAL
|
32,466.000
|
$6.000
|
$6.500
|
$5.250
|
$4.900
|
$5.500
|
$6.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
962.000
|
$165.000
|
$160.000
|
$150.000
|
$200.000
|
$130.000
|
$200.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
2,070.000
|
$179.000
|
$178.000
|
$180.000
|
$150.000
|
$165.000
|
$180.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
995.000
|
$135.000
|
$200.000
|
$170.000
|
$182.000
|
$200.000
|
$175.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
472.000
|
$20.000
|
$20.000
|
$4.250
|
$30.000
|
$10.000
|
$20.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,138.000
|
$75.000
|
$50.000
|
$25.000
|
$93.000
|
$35.000
|
$40.000
|
|
|
CL C CONC (HEADWALL)
|
CY
|
77.000
|
$2,500.000
|
$2,000.000
|
$1,100.000
|
$1,552.000
|
$1,250.000
|
$2,000.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
63.000
|
$600.000
|
$850.000
|
$580.000
|
$549.000
|
$650.000
|
$900.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
32.000
|
$600.000
|
$950.000
|
$610.000
|
$855.000
|
$700.000
|
$1,000.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
222.000
|
$150.000
|
$165.000
|
$210.000
|
$179.000
|
$150.000
|
$170.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
143.000
|
$673.000
|
$950.000
|
$490.000
|
$752.000
|
$650.000
|
$850.000
|
|
|
RAIL (TY T223)
|
LF
|
541.000
|
$150.000
|
$230.000
|
$200.000
|
$267.600
|
$175.000
|
$200.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
84.000
|
$400.000
|
$625.000
|
$540.000
|
$323.000
|
$440.000
|
$1,100.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
40.000
|
$1,400.000
|
$900.000
|
$1,100.000
|
$789.000
|
$910.000
|
$1,600.000
|
|
|
CONC BOX CULV (10 FT X 6 FT)
|
LF
|
324.000
|
$1,500.000
|
$1,300.000
|
$1,500.000
|
$1,520.000
|
$1,400.000
|
$1,400.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
40.000
|
$1,400.000
|
$900.000
|
$1,400.000
|
$3,083.000
|
$1,150.000
|
$950.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
84.000
|
$550.000
|
$800.000
|
$700.000
|
$482.400
|
$610.000
|
$1,450.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
313.000
|
$100.000
|
$65.000
|
$66.000
|
$75.450
|
$85.000
|
$70.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
152.000
|
$108.080
|
$150.000
|
$78.000
|
$98.850
|
$105.000
|
$150.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
57.000
|
$150.000
|
$185.000
|
$100.000
|
$164.000
|
$180.000
|
$175.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
213.000
|
$275.000
|
$340.000
|
$220.000
|
$244.000
|
$350.000
|
$350.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
426.000
|
$137.000
|
$165.000
|
$82.000
|
$113.000
|
$160.000
|
$180.000
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
132.500
|
$170.000
|
$225.000
|
$120.000
|
$165.000
|
$235.000
|
$230.000
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
206.000
|
$250.000
|
$300.000
|
$170.000
|
$227.000
|
$310.000
|
$320.000
|
|
|
HEADWALL (CH - FW - 45) (DIA= 48 IN)
|
EA
|
2.000
|
$15,000.000
|
$25,000.000
|
$22,000.000
|
$48,115.000
|
$16,200.000
|
$26,500.000
|
|
|
WINGWALL (FW - 0) (HW=11 FT)
|
EA
|
1.000
|
$45,000.000
|
$35,000.000
|
$145,000.000
|
$97,765.000
|
$44,500.000
|
$35,000.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$35,000.000
|
$55,000.000
|
$90,000.000
|
$88,500.000
|
$64,500.000
|
$55,000.000
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
1.000
|
$45,000.000
|
$65,000.000
|
$145,000.000
|
$102,250.000
|
$79,500.000
|
$67,500.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$35,000.000
|
$35,000.000
|
$60,000.000
|
$62,750.000
|
$42,500.000
|
$36,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1) (C)
|
EA
|
4.000
|
$7,000.000
|
$6,500.000
|
$8,500.000
|
$17,770.000
|
$5,750.000
|
$7,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 2 FT)(6:1) (C)
|
EA
|
4.000
|
$7,000.000
|
$8,500.000
|
$12,000.000
|
$18,500.000
|
$7,550.000
|
$8,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$1,300.000
|
$1,000.000
|
$1,300.000
|
$1,227.000
|
$1,400.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
22.000
|
$1,500.000
|
$1,500.000
|
$1,300.000
|
$1,426.000
|
$1,700.000
|
$1,700.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,200.000
|
$2,000.000
|
$1,400.000
|
$1,430.000
|
$1,900.000
|
$2,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$2,400.000
|
$3,000.000
|
$2,100.000
|
$2,657.000
|
$2,500.000
|
$3,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$2,700.000
|
$3,500.000
|
$2,300.000
|
$2,356.000
|
$2,600.000
|
$3,600.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
5.000
|
$3,600.000
|
$4,000.000
|
$2,900.000
|
$3,824.000
|
$3,700.000
|
$4,400.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$4,500.000
|
$4,500.000
|
$3,300.000
|
$4,160.000
|
$4,500.000
|
$5,200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$2,500.000
|
$2,000.000
|
$530.000
|
$4,290.000
|
$2,200.000
|
$3,000.000
|
|
|
REMOV STR (SET)
|
EA
|
37.000
|
$800.000
|
$900.000
|
$4,200.000
|
$656.000
|
$450.000
|
$1,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$2,600.000
|
$2,000.000
|
$3,000.000
|
$5,560.000
|
$7,700.000
|
$2,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,780.000
|
$2,000.000
|
$3,000.000
|
$17,600.000
|
$12,000.000
|
$2,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
989.000
|
$30.000
|
$50.000
|
$53.000
|
$50.500
|
$20.000
|
$50.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
96.000
|
$150.000
|
$350.000
|
$150.000
|
$494.000
|
$350.000
|
$400.000
|
|
|
REMOV STR (PIPE)
|
EA
|
11.000
|
$600.000
|
$1,500.000
|
$810.000
|
$900.000
|
$400.000
|
$1,600.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$900,000.000
|
$990,000.000
|
$850,000.000
|
$1,204,000.000
|
$1,133,400.000
|
$1,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
23.000
|
$10,000.000
|
$2,000.000
|
$1,300.000
|
$22,753.000
|
$10,000.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,200.000
|
$40.000
|
$35.000
|
$44.000
|
$38.890
|
$38.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,200.000
|
$11.000
|
$10.000
|
$13.000
|
$11.000
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
14,560.000
|
$4.000
|
$3.500
|
$4.500
|
$3.890
|
$3.500
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
14,560.000
|
$1.000
|
$1.000
|
$1.250
|
$1.100
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
75.000
|
$90.000
|
$250.000
|
$170.000
|
$411.000
|
$300.000
|
$155.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
1.100
|
$5,500.000
|
$6,000.000
|
$8,000.000
|
$9,250.000
|
$5,600.000
|
$15,000.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
60.000
|
$30.000
|
$95.000
|
$98.000
|
$47.400
|
$30.000
|
$140.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
120.000
|
$9.000
|
$25.000
|
$16.000
|
$33.000
|
$22.000
|
$82.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
60.000
|
$15.000
|
$44.000
|
$16.000
|
$40.000
|
$29.000
|
$140.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
124.000
|
$116.530
|
$156.000
|
$92.000
|
$104.000
|
$120.000
|
$170.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
312.000
|
$55.330
|
$110.000
|
$100.000
|
$114.000
|
$60.000
|
$95.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
2,957.000
|
$50.000
|
$34.000
|
$47.000
|
$74.600
|
$45.000
|
$62.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
290.000
|
$140.000
|
$55.000
|
$50.000
|
$74.200
|
$35.000
|
$62.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,075.000
|
$27.950
|
$26.000
|
$31.000
|
$24.440
|
$35.000
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,300.000
|
$1,880.000
|
$2,300.000
|
$2,633.000
|
$2,300.000
|
$2,400.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,800.000
|
$2.600
|
$3.000
|
$4.500
|
$2.200
|
$3.250
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
18.000
|
$3,250.000
|
$3,575.000
|
$3,500.000
|
$3,167.000
|
$4,000.000
|
$2,900.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
20.000
|
$277.500
|
$366.000
|
$310.000
|
$167.000
|
$400.000
|
$150.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$1,200.000
|
$1,515.000
|
$600.000
|
$3,165.000
|
$1,650.000
|
$2,900.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,500.000
|
$1,467.000
|
$700.000
|
$1,000.000
|
$1,600.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$6,000.000
|
$8,985.000
|
$9,200.000
|
$9,389.000
|
$9,800.000
|
$8,500.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
9.000
|
$370.000
|
$325.450
|
$410.000
|
$317.000
|
$400.000
|
$290.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
7.000
|
$380.000
|
$327.750
|
$410.000
|
$389.000
|
$550.000
|
$350.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
8.000
|
$700.000
|
$718.750
|
$900.000
|
$883.000
|
$1,100.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
77.000
|
$800.000
|
$581.900
|
$730.000
|
$500.000
|
$700.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
3.000
|
$800.000
|
$656.650
|
$820.000
|
$539.000
|
$700.000
|
$490.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
65.000
|
$120.000
|
$99.000
|
$120.000
|
$110.000
|
$90.000
|
$110.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
11.000
|
$22.000
|
$55.000
|
$69.000
|
$45.000
|
$20.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
37.000
|
$42.000
|
$21.850
|
$71.000
|
$40.000
|
$45.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
58.000
|
$160.000
|
$92.000
|
$120.000
|
$195.000
|
$75.000
|
$175.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
11,718.000
|
$1.300
|
$1.750
|
$2.000
|
$1.750
|
$1.500
|
$1.200
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(060MIL)
|
LF
|
76,502.000
|
$1.000
|
$0.800
|
$1.000
|
$0.760
|
$1.000
|
$0.700
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
|
LF
|
37,457.000
|
$0.750
|
$0.830
|
$1.000
|
$1.100
|
$1.250
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(090MIL)
|
LF
|
6,640.000
|
$0.790
|
$0.880
|
$1.000
|
$1.100
|
$1.250
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
66.000
|
$15.000
|
$19.000
|
$25.000
|
$20.000
|
$25.000
|
$18.500
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
2.000
|
$690.000
|
$475.000
|
$630.000
|
$800.000
|
$750.000
|
$720.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
798.000
|
$4.000
|
$6.450
|
$8.000
|
$5.750
|
$7.500
|
$5.300
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
167.000
|
$150.000
|
$350.000
|
$150.000
|
$175.000
|
$140.000
|
$270.000
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
52.000
|
$120.000
|
$350.000
|
$230.000
|
$353.000
|
$175.000
|
$310.000
|
|
|
BONDING COURSE
|
GAL
|
47.000
|
$4.500
|
$35.000
|
$17.000
|
$4.500
|
$8.000
|
$30.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
5.000
|
$10,000.000
|
$12,000.000
|
$6,000.000
|
$21,500.000
|
$11,000.000
|
$14,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
1,582.000
|
$4.200
|
$9.000
|
$11.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
TMA (STATIONARY)
|
DAY
|
202.000
|
$300.000
|
$275.000
|
$200.000
|
$500.000
|
$200.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
66.000
|
$500.000
|
$250.000
|
$300.000
|
$900.000
|
$400.000
|
$300.000
|
|
Totals: |
$9,875,683.520
|
$9,980,813.570
|
$10,869,225.050
|
$11,203,481.310
|
$11,368,074.650
|
$12,025,849.240
|