BRAZOS SH OSR (0475-01-056)

Items: 181

County: BRAZOS
Length: N/A
Highway: SH OSR
District: BRYAN
Control Number: 0475-01-056
DBE Goal: N/A
Project: STP 1902(024)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $55,205,435.12
Date: 06/04/2019 (7 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$55,205,435.12
$64,767,701.28
Over/Under Est: 17.32% $9,562,266.16
$65,605,481.09
Over/Under Est: 18.84% $10,400,045.97
Amt Left: 1.29% $837,779.81
Over/Under Est: 27.63% $15,251,596.44
Amt Left: 8.78% $5,689,330.28
Delta: -7.40% -$4,851,550.47

Bid Items & Bid Tabulations

181 Total 0 of 181
BRAZOS  |  SH OSR  |  BRYAN  |  0475-01-056  |  06/04/2019  |  $55,205,435.12  |  STP 1902(024)  |  REHAB OF EXIST ROAD  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
A. L. HELMCAMP, INC.
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 1,365.870 $300.000 $2,000.000 $490.000 $2,550.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 97.000 $300.000 $500.000 $300.000 $228.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 56.000 $1,000.000 $1,500.000 $500.000 $455.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 28.000 $2,000.000 $2,500.000 $2,200.000 $2,100.000
REMOVING CONC (RIPRAP)
SY 749.000 $50.000 $15.000 $21.000 $5.000
REMOVING CONC (DRIVEWAYS)
SY 269.000 $15.000 $30.000 $42.000 $34.000
EXCAVATION (ROADWAY)
CY 183,767.000 $8.000 $10.000 $18.000 $16.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 52,964.000 $12.000 $10.000 $10.000 $11.500
FURNISHING AND PLACING TOPSOIL (4")
SY 819,910.000 $0.600 $0.500 $0.900 $0.800
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 819,910.000 $0.300 $0.300 $0.350 $0.400
CELL FBR MLCH SEED(TEMP)(WARM)
SY 409,971.000 $0.270 $0.280 $0.330 $0.370
CELL FBR MLCH SEED(TEMP)(COOL)
SY 409,971.000 $0.270 $0.280 $0.330 $0.370
VEGETATIVE WATERING
MG 8,199.000 $15.000 $5.000 $15.000 $20.000
FL BS (CMP IN PLC)(TY D GR1-2)(8")
SY 476,091.000 $11.000 $15.000 $15.750 $16.000
FL BS(RDWY DEL)(TY D GR 1-2)(FNAL POS)
CY 70,624.000 $64.000 $49.000 $53.000 $55.750
REWRK BSE MATL (TY B)(7")(ORD COMP)
SY 413,405.000 $1.270 $2.500 $2.750 $3.000
ASPH (AC-20-5TR)
GAL 332,196.000 $4.200 $3.870 $4.000 $4.000
ASPH (RC-250)
GAL 128,409.000 $3.800 $4.000 $4.700 $4.700
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 4,110.000 $98.000 $90.000 $135.000 $140.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 6,994.000 $95.000 $120.000 $140.000 $142.000
SUPERPAVE MIXTURES SP-C SAC-A PG64-22
TON 3,814.000 $75.000 $85.000 $118.000 $106.000
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
TON 4,006.000 $80.000 $75.000 $114.000 $108.000
STRUCT EXCAV
CY 11,274.000 $8.000 $5.000 $6.000 $4.600
CEM STABIL BKFL
CY 3,413.200 $125.000 $100.000 $100.000 $86.000
TRENCH EXCAVATION PROTECTION
LF 1,785.000 $11.000 $5.000 $12.000 $13.500
TEMPORARY SPL SHORING
SF 16,013.000 $10.000 $30.000 $35.000 $28.000
DRILL SHAFT (36 IN)
LF 2,040.000 $200.000 $300.000 $260.000 $365.000
DRILL SHAFT (42 IN)
LF 984.000 $257.000 $400.000 $300.000 $486.000
CL C CONC (ABUT)(HPC)
CY 337.400 $1,000.000 $2,500.000 $1,400.000 $2,950.000
CL C CONC (CAP)(HPC)
CY 357.600 $1,020.000 $2,500.000 $1,300.000 $2,700.000
CL C CONC (COLUMN)(HPC)
CY 102.700 $791.000 $1,500.000 $1,300.000 $980.000
CL C CONC (RAIL FOUNDATION)
CY 5.000 $800.000 $600.000 $1,000.000 $460.000
REINF CONC SLAB (HPC)
SF 51,891.000 $25.000 $75.000 $100.000 $92.000
APPROACH SLAB (HPC)
CY 533.400 $557.000 $1,000.000 $940.000 $1,315.000
PRESTR CONC GIRDER (TX34)
LF 7,356.000 $160.000 $160.000 $140.000 $360.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 49.000 $210.000 $200.000 $170.000 $300.000
RIPRAP (CONC)(4 IN)
CY 54.000 $470.000 $400.000 $500.000 $515.000
RIPRAP (CONC)(5 IN)
CY 13.300 $500.000 $450.000 $750.000 $570.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 608.800 $150.000 $150.000 $220.000 $190.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 108.300 $180.000 $250.000 $300.000 $137.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 5,438.100 $115.000 $100.000 $130.000 $142.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 1,846.600 $186.000 $100.000 $140.000 $165.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,334.000 $475.000 $450.000 $475.000 $515.000
RAIL (TY T223)(HPC)
LF 2,783.000 $115.000 $150.000 $150.000 $95.000
RETROFIT RAIL (TY SSTR)
LF 362.000 $280.000 $200.000 $225.000 $110.000
HEADER TYPE EXPANSION JOINT
LF 576.800 $108.000 $200.000 $180.000 $250.000
CONC BOX CULV (4 FT X 2 FT)
LF 448.000 $220.000 $300.000 $240.000 $342.000
CONC BOX CULV (5 FT X 5 FT)
LF 52.000 $350.000 $400.000 $390.000 $456.000
CONC BOX CULV (6 FT X 5 FT)
LF 192.000 $500.000 $450.000 $530.000 $536.000
CONC BOX CULV (6 FT X 6 FT)
LF 344.000 $550.000 $475.000 $590.000 $565.480
CONC BOX CULV (7 FT X 5 FT)
LF 110.000 $800.000 $500.000 $590.000 $713.000
CONC BOX CULV (7 FT X 7 FT)
LF 55.000 $575.000 $675.000 $780.000 $730.000
CONC BOX CULV (8 FT X 7 FT)
LF 120.000 $800.000 $700.000 $700.000 $825.000
CONC BOX CULV (9 FT X 9 FT)
LF 510.000 $970.000 $850.000 $940.000 $1,312.000
CONC BOX CULV (10 FT X 7 FT)
LF 435.000 $980.000 $950.000 $1,100.000 $1,400.000
CONC BOX CULV (10 FT X 8 FT)
LF 432.000 $940.000 $1,000.000 $1,200.000 $1,500.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 72.000 $610.000 $550.000 $875.000 $799.670
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 25.000 $2,050.000 $600.000 $850.000 $860.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 102.000 $660.000 $650.000 $730.000 $970.000
CONC BOX CULV (10 FT X 7 FT)(EXTEND)
LF 18.000 $1,500.000 $1,400.000 $1,800.000 $1,713.000
RC PIPE (CL III)(18 IN)
LF 4,235.000 $52.000 $60.000 $55.000 $51.000
RC PIPE (CL III)(24 IN)
LF 1,025.000 $100.000 $70.000 $65.000 $102.000
RC PIPE (CL III)(30 IN)
LF 253.000 $180.000 $125.000 $115.000 $149.000
RC PIPE (CL III)(36 IN)
LF 461.000 $240.000 $150.000 $120.000 $177.000
RC PIPE (CL III)(48 IN)
LF 137.000 $180.000 $200.000 $160.000 $257.000
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $3,800.000 $6,000.000 $5,000.000 $3,425.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $4,000.000 $7,300.000 $7,000.000 $4,560.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000 $4,800.000 $5,800.000 $7,500.000 $4,560.000
WINGWALL (FW - 0) (HW=4 FT)
EA 2.000 $8,200.000 $6,000.000 $8,500.000 $5,700.000
WINGWALL (FW - 0) (HW=7 FT)
EA 2.000 $12,000.000 $16,500.000 $16,000.000 $14,800.000
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $33,000.000 $76,000.000 $85,000.000 $70,800.000
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $40,000.000 $120,000.000 $110,000.000 $109,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 6.000 $8,300.000 $15,000.000 $25,000.000 $18,200.000
WINGWALL (PW - 1) (HW=6 FT)
EA 3.000 $12,000.000 $26,000.000 $35,000.000 $26,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 4.000 $18,000.000 $39,000.000 $60,000.000 $36,500.000
WINGWALL (PW - 1) (HW=8 FT)
EA 6.000 $22,000.000 $40,000.000 $40,000.000 $37,700.000
WINGWALL (PW - 1) (HW=9 FT)
EA 8.000 $25,000.000 $53,000.000 $55,000.000 $52,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $6,500.000 $5,500.000 $8,000.000 $6,900.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $6,400.000 $7,500.000 $8,300.000 $8,600.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 3.000 $766.000 $825.000 $750.000 $799.590
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 11.000 $1,000.000 $900.000 $750.000 $825.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 196.000 $820.000 $1,200.000 $850.000 $856.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 6.000 $1,200.000 $950.000 $850.000 $910.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 5.000 $1,200.000 $1,375.000 $900.000 $942.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 28.000 $1,180.000 $1,425.000 $1,000.000 $970.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 8.000 $1,400.000 $1,600.000 $1,100.000 $2,300.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,200.000 $1,800.000 $1,800.000 $2,800.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 14.000 $2,500.000 $2,500.000 $2,600.000 $3,400.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $4,500.000 $3,000.000 $3,500.000 $4,000.000
SET (TY II) (48 IN) (RCP) (3: 1) (C)
EA 2.000 $3,300.000 $3,500.000 $4,500.000 $4,500.000
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 2.000 $8,500.000 $6,000.000 $7,500.000 $5,700.000
CLEAN EXIST CULVERTS
EA 12.000 $2,300.000 $6,000.000 $1,800.000 $2,200.000
DIAMOND GRINDING SLAB (ABC)
SY 321.000 $6.000 $20.000 $50.000 $266.000
REMOV STR (INLET)
EA 1.000 $875.000 $600.000 $1,000.000 $510.000
REMOV STR (SET)
EA 84.000 $520.000 $225.000 $300.000 $510.000
REMOV STR (WINGWALL)
EA 19.000 $2,000.000 $1,750.000 $1,000.000 $1,141.000
REMOV STR (HEADWALL)
EA 2.000 $3,500.000 $1,500.000 $1,000.000 $1,141.000
REMOV STR (PIPE)
LF 1,739.000 $16.000 $15.000 $30.000 $28.000
REMOV STR (BOX CULVERT)
LF 727.000 $200.000 $55.000 $75.000 $142.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 4.000 $25,000.000 $25,000.000 $32,000.000 $16,700.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 3.000 $70,000.000 $100,000.000 $54,000.000 $155,000.000
REMOV STR (PIPE)
EA 115.000 $500.000 $400.000 $750.000 $850.000
MOBILIZATION
LS 1.000 $4,300,000.000 $5,750,000.000 $5,400,000.000 $4,600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 37.000 $8,000.000 $50,000.000 $7,000.000 $2,250.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 5,180.000 $28.000 $38.000 $32.000 $28.000
ROCK FILTER DAMS (REMOVE)
LF 5,180.000 $7.000 $5.000 $10.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 560.000 $18.000 $18.000 $22.000 $20.000
CONSTRUCTION EXITS (REMOVE)
SY 560.000 $6.000 $5.000 $5.000 $8.000
CONSTRUCTION PERIMETER FENCE
LF 520.000 $2.950 $3.000 $8.000 $2.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 83,010.000 $2.450 $3.000 $2.500 $2.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 83,010.000 $0.850 $0.500 $0.700 $0.750
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 4,280.000 $5.800 $8.000 $4.800 $6.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,280.000 $1.200 $0.500 $0.500 $1.150
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 40.000 $3,000.000 $5,000.000 $6,000.000 $6,900.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 9,420.000 $22.000 $50.000 $74.000 $42.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 41,170.000 $16.000 $11.000 $22.000 $20.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 9,420.000 $12.000 $11.000 $22.000 $18.000
INTERSECTIONS (ACP)
SY 9,907.000 $30.000 $30.000 $28.000 $24.750
INTERSECTIONS (SURF TREAT)
SY 457.000 $12.000 $25.000 $29.000 $20.500
DRIVEWAYS (CONC)
SY 433.000 $87.000 $100.000 $110.000 $102.000
DRIVEWAYS (ACP)
SY 11,479.000 $34.000 $25.000 $22.000 $26.000
DRIVEWAYS (SURF TREAT)
SY 7,605.000 $20.000 $22.000 $23.000 $21.750
TURNOUTS (SURF TREAT)
SY 1,803.000 $15.000 $22.000 $24.000 $23.000
MTL W-BEAM GD FEN (TIM POST)
LF 17,720.000 $25.000 $27.000 $21.000 $21.500
MTL THRIE-BEAM GD FEN (TIM POST)
EA 32.000 $2,200.000 $1,800.000 $1,600.000 $1,670.000
REMOVE METAL BEAM GUARD FENCE
LF 6,750.000 $2.500 $3.000 $2.500 $2.250
RM MTL BM GD FEN TRANS (T101)
EA 40.000 $300.000 $150.000 $135.000 $142.000
GUARDRAIL END TREATMENT (INSTALL)
EA 98.000 $2,700.000 $2,500.000 $2,500.000 $2,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 60.000 $250.000 $200.000 $160.000 $172.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 174.000 $3,000.000 $1,500.000 $1,100.000 $650.000
CRASH CUSH ATTEN (REMOVE)
EA 38.000 $1,100.000 $1,000.000 $1,100.000 $740.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $30,000.000 $30,000.000 $36,000.000 $26,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 38.000 $9,000.000 $8,000.000 $11,000.000 $7,900.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 11.000 $390.000 $600.000 $580.000 $448.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 81.000 $220.000 $250.000 $240.000 $216.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 14.000 $300.000 $300.000 $270.000 $255.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 118.000 $800.000 $500.000 $480.000 $524.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $600.000 $500.000 $480.000 $667.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 42.000 $500.000 $600.000 $620.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $600.000 $700.000 $700.000 $1,060.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 4.000 $585.000 $600.000 $750.000 $610.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 8.000 $585.000 $700.000 $830.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $900.000 $700.000 $1,100.000 $950.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 2.000 $1,100.000 $700.000 $1,100.000 $1,070.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 6.000 $800.000 $800.000 $1,400.000 $1,075.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 13.000 $425.000 $300.000 $400.000 $419.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 22.000 $340.000 $300.000 $55.000 $270.000
REMOVE SM RD SN SUP&AM
EA 226.000 $86.000 $125.000 $70.000 $104.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 60.000 $24.000 $22.000 $20.000 $26.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 335.000 $26.600 $20.000 $20.000 $26.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 100.000 $85.000 $90.000 $70.000 $78.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 170.000 $30.000 $20.000 $11.000 $23.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 7,440.000 $3.500 $5.000 $3.580 $4.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 16,946.000 $0.850 $1.000 $0.860 $10.400
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 1,826.000 $10.640 $10.000 $8.030 $34.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 297,600.000 $0.860 $1.000 $0.800 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 25,518.000 $0.500 $1.000 $0.610 $1.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 465.000 $6.000 $10.000 $5.890 $20.500
REF PROF PAV MRK TY I(W)4"(SLD)(060MIL)
LF 266,779.000 $0.560 $0.800 $0.750 $0.700
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 81,205.000 $0.650 $0.900 $0.750 $0.800
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
LF 108,646.000 $0.780 $0.900 $0.750 $0.200
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,905.000 $0.300 $3.000 $2.140 $0.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 706.000 $0.300 $3.000 $2.140 $0.700
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $203.000 $375.000 $240.000 $565.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $600.000 $750.000 $600.000 $1,135.000
REFL PAV MRKR TY II-A-A
EA 3,589.000 $3.000 $5.000 $3.750 $17.000
PAV SURF PREP FOR MRK (4")
LF 3,901.000 $0.500 $0.400 $0.270 $21.000
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 3.000 $2,500.000 $5,000.000 $3,200.000 $3,310.000
REPLACE OF SPAN CABLE ASSM
LF 150.000 $3.000 $10.000 $60.000 $62.000
REPLACE OF SIGNAL HEAD ASSM
EA 2.000 $500.000 $2,500.000 $1,100.000 $1,141.000
NO. OF WORKING DAYS
$/D 10,100.000 $701.000 $701.000 $692.000 $675.000
ASPHALT BINDER (PG64-22)
GAL 761,070.000 $2.500 $3.000 $3.100 $3.100
CEMENT
TON 4,006.500 $150.000 $170.000 $180.000 $185.000
FOAMED ASPHALT TREAT (10")(DC)
SY 513,632.000 $9.760 $3.000 $5.100 $5.400
FOAMED ASPHALT TREAT (12")(DC)
SY 24,991.000 $11.800 $5.000 $7.000 $6.900
TEMP CONSTRUCTION ACCESS
LS 1.000 $750,000.000 $795,000.000 $250,000.000 $668,000.000
ULTRA-HIGH PERFORMANCE CONCRETE (UPHC)
CY 129.000 $4,500.000 $10,000.000 $5,400.000 $1,260.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 9.000 $7,000.000 $15,000.000 $20,000.000 $5,400.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 10,449.000 $4.000 $7.000 $5.500 $9.710
TMA (STATIONARY)
EA 6.000 $5,000.000 $10,000.000 $20,000.000 $22,700.000
TMA (MOBILE OPERATION)
DAY 40.000 $200.000 $250.000 $600.000 $400.000
Totals: $55,205,435.120 $64,767,701.280 $65,605,481.090 $70,457,031.560