BRAZOS FM 158 (0212-03-050)

Items: 227

County: BRAZOS
Length: N/A
Highway: FM 158
District: BRYAN
Control Number: 0212-03-050
DBE Goal: N/A
Project: C 212-3-50
Guaranty: N/A
Time: 442 WORKING DAYS
Engineer's Estimate: $16,078,298.02
Date: 06/02/2022 (4 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
JAMES ROBBINS
JOSEPH GREIVE
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$16,078,298.02
$17,531,349.90
Over/Under Est: 9.04% $1,453,051.88
$20,115,867.00
Over/Under Est: 25.11% $4,037,568.98
Amt Left: 14.74% $2,584,517.10
Over/Under Est: 34.95% $5,619,520.26
Amt Left: 23.77% $4,166,468.38
Delta: -7.86% -$1,581,951.28
Subcontractor Percentage Amount
ENCINO LANDSCAPE, INC. 10.75% $1,911,876.14
THIRD COAST SERVICES LLC 10.51% $1,869,192.39
HIGHWAY 1 LLC 1.99% $353,919.40
TRP CONSTRUCTION GROUP, LLC 1.99% $353,919.40
BRITTEN HYDROSEEDING 0.63% $112,044.83
WATERS CONSTRUCTION COMPANY, INC. 0.60% $106,709.37
DORAN STEEL, INC. 0.11% $19,563.38
CUSTOM FABRICATORS & REPAIRS, INC. 0.00% $0.00
Total: 26.58% $4,727,224.91

Bid Items & Bid Tabulations

227 Total 0 of 227
BRAZOS  |  FM 158  |  BRYAN  |  0212-03-050  |  06/02/2022  |  $16,078,298.02  |  C 212-3-50  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  442 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
ALTUS CONSTRUCTION LLC
KNIFE RIVER CORPORATION - SOUTH
PREPARING ROW
STA 7.000 $500.000 $1,400.000 $21,491.250 $1,936.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 153.000 $650.230 $368.000 $639.280 $733.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 12.000 $1,508.040 $1,500.000 $1,789.680 $2,718.000
REMOVING CONC (PAV)
SY 1,872.000 $6.150 $8.000 $5.240 $19.760
REMOVING CONC (MEDIANS)
SY 287.000 $10.720 $8.000 $22.570 $31.480
REMOVING CONC (DRIVEWAYS)
SY 3,239.000 $12.920 $8.250 $7.670 $42.670
REMOVING CONC (CURB AND GUTTER)
LF 23,380.000 $5.820 $8.000 $2.520 $9.750
REMOVING CONC (SIDEWALK OR RAMP)
SY 9,796.000 $15.360 $8.000 $10.240 $10.300
REMOVING CONC (FLUME)
SY 3.000 $15.970 $7.750 $56.410 $94.680
REMOVING STAB BASE AND ASPH PAV(8")
SY 4,611.000 $2.910 $4.750 $11.280 $11.000
REMOVING STAB BASE & ASPH PAV (18")
SY 22,648.000 $8.020 $8.000 $11.320 $15.830
EXCAVATION (ROADWAY)
CY 3,451.000 $8.230 $23.000 $18.400 $22.520
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,511.000 $8.860 $17.000 $15.800 $34.680
FURNISHING AND PLACING TOPSOIL (4")
SY 19,046.000 $0.390 $4.000 $0.990 $2.660
BLOCK SODDING
SY 19,046.000 $4.100 $4.750 $6.680 $5.760
CELL FBR MLCH SEED(TEMP)(WARM)
SY 31,510.000 $0.310 $0.500 $0.990 $0.420
CELL FBR MLCH SEED(TEMP)(COOL)
SY 31,510.000 $0.290 $0.500 $1.000 $0.420
VEGETATIVE WATERING
MG 7,715.000 $13.320 $25.000 $1.130 $42.000
IRRIGATION SYSTEM (TY I)
LS 1.000 $957,788.620 $910,000.000 $1,184,707.900 $1,030,000.000
PLANT MATERIAL (4" CNTR)
EA 3,283.000 $6.000 $6.000 $7.230 $8.610
PLANT MATERIAL (1-GAL)
EA 17,980.000 $12.810 $14.500 $24.310 $11.450
PLANT MATERIAL (3-GAL)
EA 4,151.000 $25.000 $42.500 $43.610 $28.380
PLANT MATERIAL (5-GAL)
EA 285.000 $29.960 $48.500 $100.770 $46.510
MULCH
CY 684.000 $50.000 $84.500 $105.200 $63.260
PLANT SOIL MIX
CY 7,114.000 $62.860 $42.500 $103.980 $54.800
LANDSCAPE EDGE
LF 1,907.000 $10.420 $12.000 $14.420 $23.860
PLANT BED PREPARATION
SY 7,203.000 $2.240 $8.500 $15.710 $22.420
PLANT MATERIAL (45 GAL) (TREE)
EA 93.000 $750.000 $544.000 $914.820 $713.410
PLANT MATERIAL (65 GAL) (TREE)
EA 230.000 $1,000.000 $635.000 $1,751.500 $1,259.120
PLANT MATERIAL (10-GAL)
EA 37.000 $80.440 $181.000 $340.370 $181.070
PLANT MATERIAL (7-GAL)
EA 496.000 $70.000 $90.500 $114.100 $78.900
PLANT MATERIAL (200 GAL) (TREE)
EA 70.000 $2,500.000 $2,400.000 $3,606.510 $4,068.270
VEGETATION BARRIER (TREE ROOT)
SY 1,753.000 $6.850 $36.500 $77.340 $25.910
PLANT MATERIAL (300 GAL) (TREE)
EA 2.000 $2,500.000 $3,600.000 $13,704.600 $6,461.620
LIME (COMMERCIAL LIME SLURRY)
TON 542.000 $200.000 $225.000 $203.090 $299.000
LIME TRT (EXST MATL) (6")
SY 32,067.000 $2.850 $10.000 $7.490 $10.290
LIME TRT (EXST MATL)(8")
SY 6,055.000 $2.860 $12.000 $13.540 $6.960
CEM TRT(PLNT MX)(CL L)(TY A)(GR 5)(6")
SY 7,836.000 $56.500 $29.500 $32.090 $21.420
ASPH (HFRS-2P)
GAL 13,345.000 $3.990 $5.750 $7.550 $5.140
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 353.000 $121.310 $140.000 $214.370 $278.000
PLANE ASPH CONC PAV (2")
SY 37,704.000 $2.000 $1.750 $2.220 $1.960
CONC PVMT (CONT REINF - CRCP) (10")
SY 4,759.000 $60.850 $105.000 $94.960 $91.270
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 381.000 $114.450 $102.000 $175.370 $293.340
CONC PVMT (JC) (TRANSITION SLAB)
SY 1,055.000 $211.540 $75.000 $210.450 $228.510
CEM STABIL BKFL
CY 2,131.000 $69.650 $122.000 $86.840 $113.280
CUT & RESTORING PAV
SY 421.000 $91.780 $104.000 $69.730 $136.080
CEMENT STAB BACKFILL (INLET OR MH)
CY 1,019.000 $56.980 $122.000 $53.860 $113.000
TRENCH EXCAVATION PROTECTION
LF 2,508.000 $2.840 $0.500 $2.550 $13.300
DRILL SHAFT (24 IN)
LF 384.000 $156.150 $181.000 $219.960 $163.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 90.000 $175.000 $181.000 $219.950 $163.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 121.000 $275.000 $317.000 $254.870 $285.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 65.000 $300.000 $366.000 $293.820 $330.000
CL A CONC (COLLAR)
EA 28.000 $648.190 $569.000 $583.610 $1,093.000
CL C CONC (HEADWALL)
CY 56.200 $1,500.000 $976.000 $628.770 $1,569.000
CL C CONC (WINGWALLS)
CY 14.700 $1,500.000 $1,300.000 $817.400 $1,515.000
CL C CONC (INLET)
CY 3.800 $900.000 $1,100.000 $789.810 $1,225.000
CL C CONC (RETAINING WALL)
CY 563.000 $1,033.370 $788.000 $684.740 $981.000
RIPRAP (CONC)(6 IN)
CY 14.200 $400.950 $548.000 $602.780 $592.000
RIPRAP (STONE COMMON)(GROUT)(8 IN)
CY 10.000 $207.410 $393.000 $187.220 $344.000
RAIL (HANDRAIL)(TY E)
LF 2,626.000 $119.630 $121.000 $131.810 $112.000
CONC BOX CULV (4 FT X 3 FT)
LF 12.000 $239.960 $470.000 $1,128.290 $537.000
CONC BOX CULV (5 FT X 2 FT)
LF 13.000 $286.190 $536.000 $1,128.290 $632.000
RC PIPE (CL III)(18 IN)
LF 1,451.000 $60.550 $124.000 $78.140 $82.600
RC PIPE (CL III)(21 IN)
LF 31.000 $72.490 $136.000 $141.040 $116.000
RC PIPE (CL III)(24 IN)
LF 849.000 $80.790 $137.000 $102.850 $109.000
RC PIPE (CL III)(30 IN)
LF 64.000 $97.870 $177.000 $197.450 $133.000
RC PIPE (CL III)(42 IN)
LF 23.000 $153.620 $351.000 $293.180 $236.000
RC PIPE (CL IV)(24 IN)
LF 54.000 $95.170 $137.000 $141.040 $109.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 4.000 $3,948.790 $3,600.000 $4,052.830 $4,597.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 2.000 $5,059.000 $4,500.000 $6,769.760 $5,141.000
JCTBOX(COMPL)(PJB)(5FTX6FT)
EA 1.000 $7,446.320 $9,700.000 $16,924.400 $6,604.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 3.000 $4,980.120 $3,800.000 $4,368.750 $7,635.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 5.000 $4,745.550 $5,500.000 $7,212.050 $7,635.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 5.000 $4,724.990 $5,600.000 $7,257.180 $7,635.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 17.000 $5,539.680 $6,100.000 $7,523.720 $9,764.000
INLET (COMPL)(PCO)(6FT)(NONE)
EA 1.000 $6,260.000 $4,900.000 $6,110.840 $11,320.000
INLET (COMPL)(TY A)
EA 4.000 $4,763.710 $4,600.000 $5,650.490 $6,228.000
INLET (COMPL)(CURB)(TY 1)(10')
EA 6.000 $5,116.210 $8,200.000 $10,797.770 $9,720.000
INLET (COMPL)(CURB)(TY 1)(15'X3')
EA 5.000 $5,190.510 $14,000.000 $15,231.960 $9,828.000
INLET (COMPL)(CURB)(TY 1)(15'X5')
EA 1.000 $6,000.000 $18,000.000 $33,848.800 $9,828.000
INLET (COMPL)(CURB)(TY I)(20'X3')
EA 1.000 $7,000.000 $18,000.000 $33,848.800 $12,709.000
INLET EXT
EA 1.000 $1,531.770 $1,500.000 $3,384.880 $2,970.000
CL C CONC (INLET) (TOP)
SY 3.900 $2,500.000 $571.000 $564.150 $3,969.000
INLET (COMPL)(CU)(15 FT)(FTW)
EA 1.000 $20,200.000 $18,000.000 $28,207.330 $11,656.000
INLET (COMPL)(COB)(5 FT)(FTW)
EA 1.000 $7,000.000 $6,900.000 $8,462.200 $11,363.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $11,471.960 $14,000.000 $16,924.400 $11,960.000
CAST-IN-PLACE TRENCH DRAIN
LF 254.000 $335.110 $568.000 $451.320 $529.000
ADJUSTING MANHOLES
EA 24.000 $756.630 $1,300.000 $338.490 $622.000
ADJUSTING INLETS
EA 3.000 $2,804.050 $1,900.000 $3,008.780 $1,231.000
ADJUSTING MANHOLES (SANITARY)
EA 25.000 $1,588.690 $1,300.000 $1,376.130 $616.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 29.000 $521.560 $350.000 $479.520 $583.000
ADJUSTING INLET (CAP)
EA 4.000 $2,956.960 $850.000 $2,560.080 $1,231.000
ADJUSTING MANHOLES (WATER METER)
EA 2.000 $400.000 $450.000 $846.220 $615.000
ADJUSTING MANHOLES (IRRIGATION BOX)
EA 1.000 $400.000 $450.000 $1,128.290 $615.000
ADJUSTING MANHOLES (TELEPHONE BOX)
EA 14.000 $3,500.000 $850.000 $3,949.030 $1,000.000
PIPE (PVC) (SCH 40) (10 IN)
LF 6.000 $120.000 $65.000 $270.790 $184.000
REMOV STR (INLET)
EA 31.000 $612.960 $771.000 $489.530 $1,513.000
REMOV STR (WINGWALL)
EA 5.000 $1,610.160 $771.000 $2,322.030 $2,429.000
REMOV STR (PIPE)
LF 1,540.000 $17.480 $20.500 $16.440 $23.350
REMOVE STR (JUNCTION BOX)
EA 2.000 $819.580 $771.000 $882.370 $1,789.000
REMOVE STR (RAIL)
LF 125.000 $21.290 $5.000 $26.280 $19.580
MOBILIZATION
LS 1.000 $1,473,710.000 $1,830,000.000 $1,974,513.170 $1,664,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $5,830.650 $6,100.000 $9,026.350 $9,450.000
FURN ADDITIONAL TRUCKMOUNT ATTENUATOR
HR 312.000 $75.000 $38.000 $56.410 $49.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $28.270 $54.500 $33.880 $48.910
ROCK FILTER DAMS (REMOVE)
LF 50.000 $7.120 $18.000 $15.210 $16.300
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,722.000 $2.720 $2.750 $2.030 $4.890
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,722.000 $0.580 $1.250 $0.690 $1.090
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,389.000 $4.420 $2.500 $3.560 $4.350
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,389.000 $0.950 $1.250 $1.050 $1.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 4,640.000 $38.610 $26.000 $70.660 $68.840
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 820.000 $50.660 $26.500 $70.660 $65.670
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 3,840.000 $7.880 $5.500 $7.660 $11.500
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 740.000 $9.190 $5.500 $7.660 $11.500
LANDSCAPE PAVERS
SY 1,938.000 $63.820 $150.000 $154.860 $179.000
COLORED TEXTURED CONC (10")
SY 716.000 $252.120 $117.000 $122.410 $293.470
CONC CURB (TY I)
LF 2,050.000 $12.470 $6.750 $16.260 $4.600
CONC CURB (MONO) (TY I)
LF 617.000 $21.080 $6.750 $24.390 $3.950
CONC CURB & GUTTER (TY II)
LF 15,750.000 $21.310 $20.500 $24.840 $23.300
CONCRETE CURB (SPECIAL)
LF 2,819.000 $25.000 $15.000 $36.130 $23.500
INTERSECTIONS (CONC)
SY 8,653.000 $97.910 $95.500 $72.620 $173.140
DRIVEWAYS (CONC)
SY 2,246.000 $75.600 $67.000 $67.200 $197.820
CONC SIDEWALKS (6")
SY 16,820.000 $61.120 $57.500 $60.500 $87.160
CURB RAMPS (TY 1)
EA 1.000 $1,679.990 $1,500.000 $4,602.020 $935.000
CURB RAMPS (TY 2)
EA 2.000 $1,999.190 $2,300.000 $2,964.010 $935.000
CURB RAMPS (TY 7)
EA 82.000 $1,980.740 $1,500.000 $1,354.120 $985.000
CURB RAMPS (TY 10)
EA 12.000 $1,482.030 $1,500.000 $1,611.740 $1,047.000
CURB RAMPS (TY 21)
EA 3.000 $2,231.580 $1,500.000 $2,235.420 $1,256.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 799.000 $140.610 $134.000 $251.530 $257.000
CURB RAMPS (SPECIAL)
SY 349.000 $698.450 $111.000 $225.660 $305.000
CONCRETE SIDEWALK (STEPS)
SY 6.000 $671.650 $694.000 $1,694.640 $2,130.000
CONC MEDIAN
SY 2,889.000 $66.340 $85.500 $73.420 $206.000
CONCRETE MEDIAN (NOSE)
SY 40.000 $55.650 $136.000 $146.840 $436.000
REMOVE METAL BEAM GUARD FENCE
LF 128.000 $2.330 $7.250 $9.030 $10.000
CHAIN LINK FENCE (REMOVE)
LF 35.000 $5.930 $7.250 $28.210 $10.000
REMOVE RD IL ASM (TRANS-BASE)
EA 44.000 $1,073.220 $235.000 $564.150 $210.860
REPLACE LUMINAIRE W/HPS (250W)
EA 5.000 $1,800.000 $493.000 $896.990 $443.460
CONDT (HDPE) (4")
LF 2,605.000 $18.000 $29.000 $31.980 $26.090
CONDT (HDPE) (4") BORE
LF 555.000 $28.500 $36.500 $36.250 $32.610
CONDT (PVC) (SCH 40) (2")
LF 8,827.000 $10.000 $12.000 $14.810 $11.100
CONDT (PVC) (SCH 40) (2") (BORE)
LF 260.000 $20.000 $24.500 $19.230 $22.350
CONDT (PVC) (SCH 40) (4")
LF 478.000 $21.240 $25.000 $30.010 $22.560
CONDT (PVC) (SCH 40) (4") (BORE)
LF 985.000 $25.000 $35.500 $31.050 $32.200
CONDT (PVC) (SCH 80) (2") (BORE)
LF 6,317.000 $27.490 $28.000 $20.700 $25.340
ELEC CONDR (NO.12) INSULATED
LF 1,100.000 $1.500 $1.500 $1.370 $1.280
ELEC CONDR (NO.8) INSULATED
LF 19,501.000 $1.570 $2.000 $1.730 $1.850
ELEC CONDR (NO.6) BARE
LF 8,670.000 $1.750 $2.500 $1.910 $2.290
ELEC CONDR (NO.4) BARE
LF 1,135.000 $2.000 $3.750 $3.220 $3.420
ELEC CONDR (NO.4) INSULATED
LF 2,700.000 $2.000 $15.000 $3.590 $13.470
ELEC CONDR (NO.2) INSULATED
LF 28,402.000 $3.620 $5.250 $5.240 $4.830
GROUND BOX TY D (162922)
EA 6.000 $1,000.000 $1,500.000 $998.540 $1,326.000
GROUND BOX TY D (162922)W/APRON
EA 22.000 $1,100.000 $1,800.000 $1,308.820 $1,596.000
REMOVE GROUND BOX
EA 2.000 $210.050 $470.000 $84.620 $422.810
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 7.000 $6,000.000 $8,100.000 $7,364.370 $7,246.360
ALUMINUM SIGNS (TY A)
SF 400.000 $30.000 $46.000 $48.310 $41.790
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 124.000 $515.500 $733.000 $684.260 $659.160
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 26.000 $582.470 $893.000 $830.220 $802.700
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $729.470 $1,400.000 $1,331.390 $1,282.540
IN SM RD SN SUP&AM TYTWT(1)UA(T)
EA 2.000 $250.000 $450.000 $573.170 $552.150
REMOVE SM RD SN SUP&AM
EA 160.000 $104.120 $115.000 $107.190 $103.260
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 48.000 $21.840 $302.000 $22.530 $27.170
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,184.000 $0.850 $1.000 $0.750 $1.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 4,110.000 $0.130 $0.750 $0.730 $0.710
REFL PAV MRK TY II (W) 4" (DOT)
LF 24.000 $0.480 $2.500 $2.260 $2.170
REFL PAV MRK TY II (W) 4" (SLD)
LF 21,121.000 $0.110 $0.750 $0.730 $0.710
REFL PAV MRK TY II (W) 8" (DOT)
LF 82.000 $0.480 $2.750 $2.540 $2.450
REFL PAV MRK TY II (W) 8" (SLD)
LF 4,937.000 $0.320 $1.500 $1.470 $1.410
REFL PAV MRK TY II (W) 24" (SLD)
LF 3,443.000 $2.940 $5.500 $5.080 $4.890
REFL PAV MRK TY II (W) (ARROW)
EA 29.000 $61.340 $152.000 $142.200 $137.000
REFL PAV MRK TY II (W) (WORD)
EA 29.000 $72.320 $175.000 $163.600 $158.000
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 111.000 $22.130 $26.500 $24.820 $23.910
REFL PAV MRK TY II (Y) 4" (SLD)
LF 24,273.000 $0.120 $0.750 $0.730 $0.710
REFL PAV MRKR TY II-C-R
EA 322.000 $3.850 $7.750 $7.330 $7.060
ELIM EXT PAV MRK & MRKS (4")
LF 44,915.000 $0.230 $0.500 $0.450 $0.430
ELIM EXT PAV MRK & MRKS (8")
LF 80.000 $0.820 $1.250 $1.130 $1.090
ELIM EXT PAV MRK & MRKS (24")
LF 71.000 $3.510 $2.750 $2.540 $2.450
ELIM EXT PAV MRK & MRKS (ARROW)
EA 6.000 $60.600 $42.500 $39.490 $38.040
ELIM EXT PAV MRK & MRKS (WORD)
EA 7.000 $71.320 $42.500 $39.490 $38.040
ELIM EXT PAV MRK & MRKS (18")(YLD TRI)
EA 48.000 $26.060 $12.000 $11.280 $10.870
PAV SURF PREP FOR MRK (4")
LF 2,652.000 $0.040 $0.100 $0.090 $0.090
PAV SURF PREP FOR MRK (8")
LF 1,534.000 $0.130 $0.250 $0.180 $0.170
PAV SURF PREP FOR MRK (24")
LF 2,479.000 $0.770 $0.500 $0.540 $0.520
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $17.410 $24.000 $22.570 $21.740
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $18.840 $24.000 $22.570 $21.740
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 56.000 $9.220 $6.000 $5.640 $5.430
INSTALL HWY TRF SIG (SYSTEM)
EA 9.000 $40,000.000 $37,000.000 $44,449.990 $33,678.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $5,000.000 $2,600.000 $3,949.030 $2,365.090
VEH SIG SEC (12")LED(GRN)
EA 21.000 $250.000 $278.000 $259.510 $250.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $250.000 $278.000 $259.510 $250.000
VEH SIG SEC (12")LED(YEL)
EA 21.000 $250.000 $278.000 $259.510 $250.000
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000 $250.000 $278.000 $259.510 $250.000
VEH SIG SEC (12")LED(RED)
EA 45.000 $250.000 $278.000 $259.510 $250.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $250.000 $278.000 $259.510 $250.000
PED SIG SEC (LED)(COUNTDOWN)
EA 34.000 $550.000 $838.000 $725.490 $753.220
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 33.000 $125.000 $237.000 $201.960 $213.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 4.000 $150.000 $202.000 $225.660 $181.510
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 170.000 $1.750 $2.250 $1.930 $2.040
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 1,690.000 $2.000 $3.500 $2.700 $3.180
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 5,740.000 $2.500 $4.000 $3.140 $3.540
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
LF 575.000 $2.500 $4.250 $4.120 $3.820
INS TRF SIG PL AM(S)1 ARM(24')LUM
EA 2.000 $8,000.000 $16,000.000 $11,516.490 $13,940.000
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 3.000 $8,500.000 $16,000.000 $11,764.710 $14,400.000
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 6.000 $9,000.000 $17,000.000 $12,808.380 $15,445.000
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $9,500.000 $19,000.000 $13,873.490 $17,228.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 3.000 $10,000.000 $17,000.000 $15,527.570 $14,840.000
INS TRF SIG PL AM(S)1 ARM(48')LUM
EA 1.000 $10,500.000 $22,000.000 $17,076.720 $20,000.000
PED POLE ASSEMBLY
EA 15.000 $1,500.000 $1,700.000 $1,293.020 $1,520.000
PED DETECT PUSH BUTTON (APS)
EA 34.000 $750.000 $1,000.000 $981.620 $922.000
PED DETECTOR CONTROLLER UNIT
EA 10.000 $3,000.000 $3,900.000 $755.960 $3,521.000
REPLACE OF GROUND BOXES
EA 3.000 $964.120 $1,600.000 $1,748.850 $1,459.000
INSTL VID IMAGE VEH DET SYS (VIVDS)
EA 3.000 $6,000.000 $19,000.000 $23,586.970 $17,500.000
STUMP REMOVAL
EA 12.000 $750.000 $237.000 $7,085.680 $1,350.000
LANDSCAPE AMENITY (TRAILHEAD SIGN)
EA 28.000 $5,000.000 $1,800.000 $5,340.210 $1,790.000
TREE PROTECTION
EA 255.000 $338.640 $151.000 $248.220 $2,175.000
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 23.000 $74.200 $181.000 $1,068.210 $127.000
D-GR HMA TY-B PG64-22
TON 233.000 $68.840 $174.000 $243.940 $181.250
D-GR HMA TY-C PG64-22
TON 117.000 $82.260 $174.000 $373.620 $230.000
SP MIXES SP-C PG64-22
TON 1,372.000 $91.530 $164.000 $157.700 $257.860
SP MIXES SP-C SAC-A PG70-22
TON 12,977.000 $96.030 $130.000 $139.160 $113.490
SP MIXES SP-D PG64-22
TON 262.000 $150.000 $176.000 $219.750 $337.000
BONDING COURSE
GAL 4,872.000 $2.840 $4.250 $2.630 $4.350
FIXED BOLLARD
EA 7.000 $1,000.000 $1,200.000 $744.450 $2,174.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $5,837.970 $6,000.000 $3,384.880 $2,720.000
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 288.000 $63.510 $121.000 $112.830 $109.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 3.000 $8,500.000 $8,600.000 $7,784.880 $7,725.000
TMA (MOBILE OPERATION)
HR 312.000 $67.890 $38.000 $45.130 $89.000
IN RD IL (TY ST) 30T-15 (250W EQ) LED
EA 64.000 $7,100.000 $6,000.000 $10,831.620 $6,195.330
Totals: $16,078,298.020 $17,531,349.900 $20,115,867.023 $21,697,818.280