Show Job Controls
Bid Cobra

BRAZOS SH 21 (0116-04-111)

Items: 106

County: BRAZOS
Length: N/A
Highway: SH 21
District: BRYAN
Control Number: 0116-04-111
DBE Goal: 500.0%
Project: F 2B24(470 )
Guaranty: N/A
Time: 249 WORKING DAYS
Engineer's Estimate: $8,295,614.08
Date: 07/10/2024 (1 year ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENT INSTALLING R-CUTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$8,295,614.08
$6,969,516.70
Over/Under Est: -15.99% -$1,326,097.38
Over/Under Est: -9.32% -$773,329.24
Amt Left: 7.93% $552,768.14
$7,648,129.80
Over/Under Est: -7.81% -$647,484.28
Amt Left: 9.74% $678,613.10
Delta: -1.67% -$125,844.96
Over/Under Est: -7.09% -$588,510.03
Amt Left: 10.58% $737,587.35
Delta: -0.77% -$58,974.25
Over/Under Est: -5.96% -$494,047.10
Amt Left: 11.94% $832,050.28
Delta: -1.23% -$94,462.93
Subcontractor Percentage Amount
KLP COMMERCIAL, L.L.C. 11.52% $803,344.80
TRAFFIC SIGNS & LINES, LLC 4.73% $329,845.57
TRP CONSTRUCTION GROUP, LLC 2.52% $175,731.68
MASSANA CONSTRUCTION INC. 1.58% $110,180.97
CEN TEX HYDROSEED, INC. 0.60% $41,840.88
PROFESSIONAL TRAFFIC CONTROL LLC 0.35% $24,407.18
Total: 21.30% $1,485,351.08

Bid Items & Bid Tabulations

106 Total 0 of 106
BRAZOS  |  SH 21  |  BRYAN  |  0116-04-111  |  07/10/2024  |  $8,295,614.08  |  F 2B24(470 )  |  INTERS IMPRV INSTLING R-CUTS  |  249 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
KNIFE RIVER CORPORATION - SOUTH
BRAZOS PAVING, INC.
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
REMOVING CONCRETE(MOW STRIP)
LF 931.000 $9.000 $8.500 $4.000 $6.000 $40.000 $11.000
OBLITERATING ABANDONED ROAD
SY 1,138.000 $20.000 $6.000 $10.000 $22.600 $18.000 $30.000
EXCAVATION (ROADWAY)
CY 18,936.000 $27.000 $15.000 $11.750 $19.500 $22.000 $27.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,714.000 $27.000 $15.000 $8.000 $30.000 $22.000 $27.000
FURNISHING AND PLACING TOPSOIL (4")
SY 90,168.000 $2.400 $0.750 $1.000 $6.800 $1.000 $0.600
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 90,168.000 $0.500 $0.250 $0.170 $0.340 $0.200 $0.280
BROADCAST SEED (TEMP) (WARM)
SY 45,084.000 $0.500 $0.250 $0.140 $0.300 $0.150 $0.250
BROADCAST SEED (TEMP) (COOL)
SY 45,084.000 $0.500 $0.250 $0.140 $0.300 $0.150 $0.250
VEGETATIVE WATERING
MG 901.500 $60.000 $46.000 $70.000 $60.700 $25.000 $32.000
PROOF ROLLING
HR 10.000 $130.000 $120.000 $85.000 $142.850 $100.000 $100.000
FL BS (CMP IN PLC)(TY A GR 1-2)(9")
SY 15,181.000 $26.000 $24.000 $25.000 $16.500 $25.000 $24.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
SY 5,899.000 $34.000 $28.000 $29.000 $23.800 $29.000 $26.000
FL BS (CMP IN PLC) (TY A GR 1-2) (15")
SY 13,739.000 $50.000 $40.000 $40.000 $35.800 $40.000 $39.000
CEMENT
TON 399.400 $310.000 $270.000 $350.000 $261.500 $300.000 $230.000
CEMENT TREAT (EXIST MATL) (6")
SY 5,899.000 $3.000 $3.750 $4.600 $6.800 $4.500 $5.800
CEMENT TREAT(EXIST MATL)(8")
SY 28,920.000 $4.500 $5.000 $2.150 $8.050 $5.000 $3.400
PRIME COAT (MC-30 OR EC-30)
GAL 6,966.000 $10.000 $6.000 $10.000 $5.850 $6.250 $5.000
PLANE ASPH CONC PAV(6" TO 8")
SY 2,741.000 $35.000 $7.750 $16.000 $5.350 $5.500 $23.000
PLANE ASPH CONC PAV (2")
SY 56,206.000 $3.000 $1.000 $2.600 $3.300 $2.500 $3.500
CEM STABIL BKFL
CY 42.000 $160.000 $110.000 $300.000 $85.150 $250.000 $300.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 32.000 $700.000 $320.000 $250.000 $304.000 $300.000 $250.000
CL A CONC (MEDIAN)
CY 209.800 $600.000 $430.000 $680.000 $390.650 $825.000 $460.000
CL A CONC (COLLAR)
EA 1.000 $1,200.000 $1,000.000 $2,500.000 $1,250.000 $1,400.000 $2,500.000
RIPRAP (CONC)(4 IN)
CY 1.000 $650.000 $1,500.000 $1,500.000 $1,340.000 $1,600.000 $1,500.000
RIPRAP (CONC) (CL B) (4")
CY 1.400 $1,500.000 $1,500.000 $1,500.000 $1,920.000 $1,600.000 $1,500.000
RIPRAP (MOW STRIP)(4 IN)
CY 14.000 $750.000 $3,500.000 $1,100.000 $4,250.000 $1,500.000 $1,000.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 4.700 $650.000 $1,300.000 $1,500.000 $2,481.000 $1,800.000 $1,500.000
RC PIPE (CL III)(18 IN)
LF 475.000 $95.000 $73.000 $70.000 $85.000 $70.000 $70.000
RC PIPE (CL III)(24 IN)
LF 3.000 $150.000 $130.000 $3,550.000 $581.600 $120.000 $350.000
INLET (COMPL)(PMBD)(5FT)
EA 1.000 $7,600.000 $7,500.000 $8,000.000 $6,730.000 $7,600.000 $8,000.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $6,500.000 $6,700.000 $4,500.000 $6,630.000 $7,300.000 $4,500.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 1.000 $6,500.000 $7,200.000 $6,500.000 $7,730.000 $8,000.000 $6,500.000
SET (TY II) (18 IN) (RCP) (3: 1) (P)
EA 1.000 $1,500.000 $1,100.000 $1,000.000 $3,554.000 $1,500.000 $1,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $1,300.000 $1,500.000 $4,035.000 $1,625.000 $1,500.000
REMOV STR (INLET)
EA 2.000 $1,400.000 $1,200.000 $1,500.000 $1,345.000 $1,700.000 $1,500.000
REMOV STR (SET)
EA 6.000 $800.000 $280.000 $1,000.000 $1,055.000 $550.000 $1,000.000
REMOV STR (PIPE)
LF 205.000 $53.000 $23.000 $65.000 $23.250 $15.000 $65.000
REMOV STR (BOX CULVERT)
LF 4.700 $115.000 $500.000 $350.000 $611.000 $500.000 $350.000
MOBILIZATION
LS 1.000 $754,097.600 $700,000.000 $615,000.000 $278,000.000 $770,000.000 $690,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $10,000.000 $9,500.000 $12,000.000 $5,160.000 $4,500.000 $12,850.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 55.000 $40.000 $84.000 $70.000 $46.150 $45.000 $38.000
ROCK FILTER DAMS (REMOVE)
LF 55.000 $13.000 $26.000 $19.300 $18.200 $8.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,159.000 $4.000 $5.500 $7.900 $5.500 $4.000 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,159.000 $1.000 $1.250 $1.650 $1.800 $1.000 $1.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 320.000 $7.000 $7.750 $9.000 $6.100 $8.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 320.000 $5.000 $1.250 $2.000 $1.800 $1.000 $1.500
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 5,150.000 $85.000 $76.000 $106.000 $131.000 $110.000 $100.000
CONC CURB (TY I)
LF 2,547.700 $35.000 $25.000 $56.000 $38.500 $35.000 $55.000
INTERSECTIONS (ACP)
SY 311.000 $65.000 $100.000 $62.000 $65.300 $62.000 $110.000
DRIVEWAYS (ACP)
SY 413.000 $80.000 $78.000 $56.000 $50.000 $70.000 $88.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 32,260.000 $0.500 $0.250 $0.120 $0.200 $0.250 $0.340
CABLE BARRIER SYSTEM (TL-4)
LF 1,005.690 $12.000 $55.000 $49.000 $74.000 $55.000 $40.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 3.000 $4,200.000 $5,500.000 $5,000.000 $6,070.000 $5,500.000 $4,500.000
REMOVE CABLE BARRIER
LF 903.500 $6.000 $2.500 $2.000 $5.000 $2.500 $4.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 5.000 $800.000 $550.000 $500.000 $263.000 $550.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $29,000.000 $38,000.000 $29,500.000 $34,600.000 $33,000.000 $30,000.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 2.000 $350.000 $370.000 $285.000 $292.000 $300.000 $285.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 3.000 $5,500.000 $8,000.000 $6,185.000 $7,505.000 $6,500.000 $6,500.000
IN RD IL (TY SA) 40T-8-8 (250W EQ) LED
EA 1.000 $6,300.000 $9,000.000 $7,020.000 $8,520.000 $7,200.000 $7,300.000
CONDT (PVC) (SCH 40) (2")
LF 1,185.000 $15.000 $10.000 $7.800 $9.450 $8.000 $8.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 365.000 $30.000 $15.000 $11.500 $13.900 $12.500 $12.000
ELEC CONDR (NO.8) INSULATED
LF 4,695.000 $2.000 $2.000 $1.500 $1.780 $2.000 $1.500
GROUND BOX TY A (122311)W/APRON
EA 9.000 $1,400.000 $1,400.000 $1,100.000 $1,333.000 $1,500.000 $1,100.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $8,000.000 $14,000.000 $10,650.000 $12,900.000 $1,200.000 $11,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 23.000 $800.000 $590.000 $455.000 $588.000 $500.000 $470.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 13.000 $820.000 $710.000 $550.000 $740.000 $600.000 $560.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $950.000 $700.000 $545.000 $710.000 $600.000 $560.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
EA 1.000 $1,400.000 $1,100.000 $815.000 $950.000 $900.000 $830.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 33.000 $900.000 $820.000 $635.000 $945.000 $700.000 $650.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 7.000 $750.000 $960.000 $745.000 $950.000 $800.000 $760.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,150.000 $1,000.000 $790.000 $1,060.000 $850.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 1.000 $1,700.000 $1,200.000 $945.000 $1,700.000 $1,000.000 $960.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 6.000 $620.000 $500.000 $385.000 $460.000 $400.000 $390.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $700.000 $630.000 $485.000 $580.000 $550.000 $500.000
REMOVE SM RD SN SUP&AM
EA 75.000 $130.000 $170.000 $135.000 $91.000 $150.000 $135.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 171.000 $45.000 $33.000 $25.500 $18.200 $30.000 $26.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)SRF
EA 14.000 $110.000 $240.000 $185.000 $140.000 $200.000 $190.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 2,860.000 $0.500 $0.500 $1.000 $1.000 $0.400 $0.370
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 11,400.000 $0.600 $0.500 $1.000 $0.750 $0.400 $0.370
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 11,400.000 $0.550 $0.500 $1.000 $0.750 $0.400 $0.370
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 858.000 $2.000 $0.750 $1.000 $1.700 $1.500 $2.000
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 275.000 $1.500 $2.000 $2.000 $1.800 $1.650 $1.600
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 516.000 $1.600 $2.250 $2.000 $1.800 $1.900 $1.800
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 13,654.000 $1.600 $1.500 $1.000 $1.500 $1.400 $1.300
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 246.000 $9.000 $10.000 $6.500 $8.650 $8.800 $8.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 126.000 $60.000 $62.000 $37.500 $30.350 $53.000 $50.000
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 2,810.000 $0.800 $1.000 $1.000 $1.500 $0.800 $0.800
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 12,498.000 $0.800 $1.000 $1.000 $1.000 $0.800 $0.800
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 21,662.000 $0.800 $1.000 $1.000 $1.000 $0.800 $0.770
PREFAB PAV MRK TY C (W) (ARROW)
EA 15.000 $240.000 $320.000 $205.000 $303.500 $275.000 $280.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 7.000 $400.000 $550.000 $350.000 $668.000 $475.000 $440.000
PREFAB PAV MRK TY C (W) (WORD)
EA 22.000 $300.000 $390.000 $240.000 $425.000 $330.000 $310.000
REFL PAV MRKR TY I-C
EA 82.000 $6.000 $7.750 $5.000 $6.100 $6.500 $6.200
REFL PAV MRKR TY II-C-R
EA 1,317.000 $6.000 $7.750 $5.000 $5.750 $6.500 $6.200
BACK PLATE (12")(1 SEC)
EA 4.000 $170.000 $560.000 $430.000 $523.000 $450.000 $440.000
REMOVAL OF SPAN CABLE ASSM
LF 207.000 $3.000 $1.750 $1.300 $1.600 $1.500 $1.400
REMOVAL OF SIGNAL HEAD ASSM
EA 7.000 $800.000 $100.000 $78.000 $94.000 $85.000 $80.000
REPLACE OF SIGNAL HEAD ASSM
EA 2.000 $200.000 $450.000 $351.000 $425.750 $385.000 $360.000
REMOVAL OF SIGNAL POLE ASSM
EA 1.000 $3,000.000 $4,500.000 $3,500.000 $4,248.000 $3,800.000 $3,600.000
INSTALL OF LUMINAIRE MAST ARMS
EA 1.000 $950.000 $5,900.000 $4,550.000 $5,510.000 $4,900.000 $4,600.000
SP MIXES SP-C PG64-22
TON 13,289.000 $130.000 $110.000 $118.000 $115.000 $121.000 $127.000
SP MIXES SP-C SAC-A PG64-22
TON 9,615.000 $125.000 $125.000 $129.000 $122.400 $126.000 $133.000
BONDING COURSE
GAL 8,747.000 $6.500 $4.250 $6.000 $6.300 $4.000 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 222.000 $100.000 $23.000 $120.000 $75.000 $100.000 $140.000
TMA (STATIONARY)
DAY 531.000 $250.000 $180.000 $565.000 $200.000 $350.000 $150.000
TMA (MOBILE OPERATION)
HR 45.000 $83.000 $100.000 $95.000 $65.000 $90.000 $120.000
Totals: $8,295,614.080 $6,969,516.700 $7,522,284.840 $7,648,129.800 $7,707,104.050 $7,801,566.980