Show Job Controls
Bid Cobra

BRAZOS BS 6-R (0050-01-086)

Items: 61

County: BRAZOS
Length: N/A
Highway: BS 6-R
District: BRYAN
Control Number: 0050-01-086
DBE Goal: N/A
Project: NH 2019(681)
Guaranty: N/A
Time: 80 WORKING DAYS
Engineer's Estimate: $8,761,102.67
Date: 03/06/2019 (7 years ago)
Contract Number: N/A
Type: CONCRETE PAVEMENT REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$8,761,102.67
$5,989,654.51
Over/Under Est: -31.63% -$2,771,448.16
Over/Under Est: -22.48% -$1,969,716.56
Amt Left: 13.39% $801,731.60
Over/Under Est: -16.74% -$1,466,770.56
Amt Left: 21.78% $1,304,677.60
Delta: -7.41% -$502,946.00

Bid Items & Bid Tabulations

61 Total 0 of 61
BRAZOS  |  BS 6-R  |  BRYAN  |  0050-01-086  |  03/06/2019  |  $8,761,102.67  |  NH 2019(681)  |  CONC PAVMT REPAIR  |  80 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MAIN LANE INDUSTRIES LTD.
R.A. KNAPP CONSTRUCTION, INC.
LARRY YOUNG PAVING, INC.
REMOVING CONC (PAV)
SY 2,555.000 $10.000 $35.000 $35.000 $30.000
REMOVING CONC (SIDEWALKS)
SY 1,218.000 $12.000 $10.000 $10.000 $15.000
REMOVING CONC (CURB AND GUTTER)
LF 2,000.000 $6.230 $15.000 $10.000 $12.000
BLOCK SODDING
SY 1,635.000 $8.000 $4.000 $10.000 $3.850
VEGETATIVE WATERING
MG 25.000 $25.000 $100.000 $10.000 $35.000
D-GR HMA TY B SAC-B PG (64-22)
TON 984.000 $75.000 $150.000 $79.650 $85.000
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
TON 282.000 $95.000 $170.000 $108.000 $105.000
FULL - DEPTH REPAIR CRCP (8")
SY 8,040.000 $380.000 $240.000 $285.000 $285.000
FULL - DEPTH REPAIR CRCP (9")
SY 9,464.000 $300.000 $220.000 $250.000 $248.000
HALF - DEPTH REPAIR CRCP (12")
SY 74.000 $250.000 $325.000 $280.000 $600.000
CEM STABIL BKFL
CY 60.000 $80.000 $50.000 $185.000 $75.000
FLOWABLE BACKFILL
CY 40.000 $175.000 $100.000 $175.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 60.000 $20.000 $10.000 $5.000 $4.000
CL A CONC (COLLAR)
EA 4.000 $1,920.000 $7,500.000 $1,250.000 $4,500.000
CONC STR REPAIR (STANDARD)
SF 8,031.000 $5.000 $5.000 $7.000 $4.350
CLEANING AND SEALING JOINTS (CL 5)
LF 29,996.000 $40.000 $3.000 $3.500 $2.750
ADJUSTING INLETS
EA 2.000 $250.000 $1,500.000 $4,000.000 $3,750.000
REMOV STR (INLET)
EA 2.000 $3,500.000 $1,000.000 $2,000.000 $1,250.000
MOBILIZATION
LS 1.000 $669,000.000 $280,000.000 $790,000.000 $1,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $15,000.000 $100,000.000 $10,000.000 $25,000.000
CONSTRUCTING DETOURS
SY 1,250.000 $100.000 $140.000 $125.000 $90.000
CONC CURB & GUTTER (TY II)
LF 1,200.000 $18.000 $50.000 $35.000 $50.000
CONC SIDEWALKS (6")
SY 1,188.000 $67.000 $80.000 $65.000 $60.000
CURB RAMPS (TY 10)
EA 4.000 $1,633.000 $2,500.000 $2,500.000 $2,200.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 18,214.000 $0.870 $0.700 $0.700 $0.700
WK ZN PAV MRK REMOV (W)18"(YLD TRI)
EA 11.000 $30.000 $25.000 $25.000 $25.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 11,962.000 $0.870 $0.700 $0.700 $0.700
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 202.000 $2.000 $1.500 $1.500 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 10,875.000 $0.500 $0.900 $0.900 $0.900
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 261.000 $3.000 $2.650 $2.650 $2.650
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,227.000 $6.000 $6.500 $6.500 $6.500
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 11,770.000 $0.580 $0.400 $0.400 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 338.000 $0.250 $0.400 $0.400 $0.400
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 4,118.000 $13.000 $12.000 $12.000 $12.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 75.000 $220.000 $185.000 $185.000 $185.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 5.000 $375.000 $400.000 $400.000 $400.000
PREFAB PAV MRK TY C (W) (WORD)
EA 73.000 $280.000 $250.000 $250.000 $250.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 3.000 $750.000 $525.000 $525.000 $525.000
REFL PAV MRKR TY II-C-R
EA 1,361.000 $3.500 $4.000 $4.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 12,108.500 $0.600 $0.250 $0.250 $0.250
ELIM EXT PAV MRK & MRKS (8")
LF 11,047.000 $1.250 $0.450 $0.450 $0.450
ELIM EXT PAV MRK & MRKS (12")
LF 5,899.000 $2.800 $0.900 $0.900 $0.900
ELIM EXT PAV MRK & MRKS (24")
LF 2,021.000 $4.000 $2.000 $2.000 $2.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 74.000 $80.000 $22.000 $22.000 $22.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 3.000 $125.000 $30.000 $30.000 $30.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 71.000 $90.000 $20.000 $20.000 $20.000
ELIM EXT PAV MRK & MRKS (RR XING)
EA 3.000 $200.000 $75.000 $75.000 $75.000
PAV SURF PREP FOR MRK (4")
LF 42,284.000 $0.450 $0.010 $0.010 $0.010
PAV SURF PREP FOR MRK (8")
LF 11,077.000 $0.750 $0.020 $0.020 $0.020
PAV SURF PREP FOR MRK (12")
LF 261.000 $1.000 $0.040 $0.040 $0.040
PAV SURF PREP FOR MRK (24")
LF 5,345.000 $0.900 $0.050 $0.050 $0.050
PAV SURF PREP FOR MRK (ARROW)
EA 75.000 $30.000 $12.000 $12.000 $12.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 5.000 $35.000 $20.000 $20.000 $20.000
PAV SURF PREP FOR MRK (WORD)
EA 73.000 $20.000 $12.000 $12.000 $12.000
PAV SURF PREP FOR MRK (RR XING)
EA 3.000 $45.000 $20.000 $20.000 $20.000
PAV SURF PREP FOR MRK (RPM)
EA 1,351.000 $0.850 $0.020 $0.020 $0.020
TRANSPLANT PLANT MATERIAL
EA 10.000 $1,000.000 $1,000.000 $1,000.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 10.000 $9,100.000 $5,000.000 $17,500.000 $7,500.000
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 760.000 $35.000 $100.000 $100.000 $19.500
TMA (STATIONARY)
EA 6.000 $12,000.000 $20,000.000 $16,500.000 $12,000.000
TMA (MOBILE OPERATION)
DAY 28.000 $300.000 $350.000 $1,250.000 $550.000
Totals: $8,761,102.670 $5,989,654.515 $6,791,386.115 $7,294,332.115