BRAZOS SH 6 (0049-12-115)

Items: 41

County: BRAZOS
Length: N/A
Highway: SH 6
District: BRYAN
Control Number: 0049-12-115
DBE Goal: N/A
Project: STP 2019(461)TAPS
Guaranty: N/A
Time: 126 WORKING DAYS
Engineer's Estimate: $1,178,918.89
Date: 08/06/2019 (6 years ago)
Contract Number: N/A
Type: PEDESTRIAN, SIDEWALKS AND CURB RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$1,178,918.89
$1,105,702.15
Over/Under Est: -6.21% -$73,216.74
Over/Under Est: -3.77% -$44,442.58
Amt Left: 2.6% $28,774.16
$1,142,323.25
Over/Under Est: -3.1% -$36,595.64
Amt Left: 3.31% $36,621.10
Delta: -0.69% -$7,846.94
Over/Under Est: -2.41% -$28,425.35
Amt Left: 4.05% $44,791.39
Delta: -0.72% -$8,170.29
Over/Under Est: 8.95% $105,567.51
Amt Left: 16.17% $178,784.25
Delta: -11.65% -$133,992.86
Over/Under Est: 24.93% $293,926.27
Amt Left: 33.2% $367,143.01
Delta: -14.66% -$188,358.76
$1,553,463.00
Over/Under Est: 31.77% $374,544.11
Amt Left: 40.5% $447,760.85
Delta: -5.47% -$80,617.84
Over/Under Est: 36.32% $428,164.55
Amt Left: 45.35% $501,381.29
Delta: -3.45% -$53,620.44

Bid Items & Bid Tabulations

41 Total 0 of 41
BRAZOS  |  SH 6  |  BRYAN  |  0049-12-115  |  08/06/2019  |  $1,178,918.89  |  STP 2019(461)TAPS  |  PEDESTRIAN, SIDEWALKS AND CURB RAMPS  |  126 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
TEXCON GENERAL CONTRACTORS
TREVWAY, INC.
KNIFE RIVER CORPORATION - SOUTH
PROJECT ALLIED RESOURCES, LLC
ANGEL BROTHERS HOLDINGS CORP.
FNH CONSTRUCTION, LLC
FUQUA CONSTRUCTION CO., INC.
PREPARING ROW
STA 70.250 $2,100.000 $1,100.000 $350.000 $200.000 $253.000 $304.000 $660.000 $1,600.000 $958.800
REMOVING CONC (MEDIANS)
SY 33.000 $75.000 $20.000 $35.000 $50.000 $54.000 $22.500 $47.000 $20.000 $33.600
REMOVING CONC (DRIVEWAYS)
SY 512.000 $20.000 $20.000 $25.000 $20.000 $26.300 $17.300 $20.000 $20.000 $33.600
REMOVING CONC (CURB)
LF 261.000 $29.410 $6.000 $25.000 $5.000 $11.750 $6.900 $10.000 $20.000 $33.600
REMOVING CONC (SIDEWALK OR RAMP)
SY 16.000 $11.000 $100.000 $50.000 $50.000 $42.000 $17.300 $170.000 $20.000 $33.600
REMOVING STAB BASE & ASPH PAV (5" - 6")
SY 50.000 $4.000 $40.000 $14.000 $20.000 $23.000 $13.600 $27.000 $20.000 $24.000
EXCAVATION (ROADWAY)
CY 3,299.000 $12.840 $16.000 $6.340 $9.000 $9.000 $16.000 $15.000 $20.000 $18.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 2,534.000 $9.710 $20.000 $6.500 $18.000 $9.400 $20.200 $16.000 $35.000 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 12,946.000 $1.550 $0.750 $1.200 $1.000 $0.750 $1.960 $2.000 $6.000 $1.068
BLOCK SODDING
SY 1,452.000 $4.490 $4.400 $4.220 $7.000 $4.350 $5.300 $4.500 $6.000 $7.200
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 11,494.000 $0.300 $0.200 $0.200 $0.450 $0.200 $0.670 $0.190 $1.000 $0.336
VEGETATIVE WATERING
MG 12.900 $83.190 $125.000 $250.000 $100.000 $66.000 $169.000 $60.000 $100.000 $60.000
FL BS (CMP IN PLC)(TY A GR 4)(4")
SY 26.000 $50.000 $100.000 $90.000 $100.000 $32.000 $36.500 $42.000 $100.000 $82.800
RIPRAP (CONC)(4 IN)
CY 22.000 $495.390 $567.000 $450.000 $400.000 $403.000 $496.000 $550.000 $550.000 $360.000
RIPRAP (CONC)(5 IN)
CY 6.000 $666.040 $650.000 $450.000 $400.000 $650.000 $501.000 $600.000 $600.000 $360.000
RAIL (HANDRAIL)(TY E)
LF 288.000 $105.000 $145.000 $135.000 $146.000 $97.190 $140.000 $135.000 $150.000 $114.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 14.000 $637.310 $650.000 $763.000 $1,000.000 $815.000 $708.000 $900.000 $1,000.000 $1,440.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 12.000 $445.250 $900.000 $962.000 $1,200.000 $870.000 $883.000 $900.000 $1,000.000 $1,320.000
RC PIPE (CL III)(18 IN)
LF 20.000 $81.930 $200.000 $115.000 $100.000 $109.000 $67.000 $100.000 $85.000 $63.600
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $11,500.000 $8,500.000 $7,270.000 $12,000.000 $6,521.000 $12,800.000 $6,500.000 $12,500.000 $10,800.000
WINGWALL (FW - S) (HW=3 FT)
EA 2.000 $5,956.000 $6,500.000 $4,000.000 $5,500.000 $5,435.000 $8,720.000 $5,500.000 $9,500.000 $8,400.000
CAST-IN-PLACE TRENCH DRAIN
LF 17.000 $1,250.000 $210.000 $270.000 $100.000 $345.500 $396.000 $550.000 $200.000 $339.600
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 2.000 $506.660 $1,250.000 $100.000 $100.000 $800.000 $712.000 $800.000 $750.000 $597.600
REMOV STR (INLET)
EA 1.000 $990.350 $1,250.000 $750.000 $1,000.000 $815.000 $787.000 $800.000 $2,500.000 $1,868.400
MOBILIZATION
LS 1.000 $65,000.000 $105,000.000 $75,000.000 $110,000.000 $91,500.000 $122,000.000 $140,000.000 $150,000.000 $240,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,500.000 $918.000 $5,000.000 $1,200.000 $3,900.000 $1,720.000 $5,000.000 $8,500.000 $8,830.800
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 235.000 $30.000 $35.000 $33.680 $6.320 $35.000 $53.000 $32.000 $30.000 $38.520
ROCK FILTER DAMS (REMOVE)
LF 235.000 $10.500 $12.000 $10.500 $5.000 $10.000 $12.500 $10.000 $15.000 $12.120
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,521.000 $2.250 $2.500 $2.370 $2.750 $2.450 $4.590 $2.500 $4.000 $2.820
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,521.000 $0.500 $0.850 $0.840 $1.000 $0.820 $0.770 $0.800 $2.000 $1.020
CONC CURB (MONO) (TY II)
LF 117.000 $30.000 $20.000 $10.000 $35.000 $13.500 $21.400 $50.000 $20.000 $12.000
CONC CURB (SPECIAL) (TYPE II)
LF 2,195.000 $20.000 $50.000 $70.000 $16.000 $39.000 $35.000 $80.000 $50.000 $48.000
CONCRETE CURB (SPECIAL)
LF 304.000 $41.880 $45.000 $60.000 $43.000 $66.000 $42.300 $65.000 $50.000 $36.000
DRIVEWAYS (CONC) (HES)
SY 647.000 $95.000 $93.000 $120.000 $59.000 $123.000 $93.000 $110.000 $125.000 $93.600
CONC SIDEWALKS (6")
SY 9,219.000 $56.000 $44.800 $51.000 $66.000 $63.100 $65.000 $70.000 $55.000 $72.000
WIRE FENCE (TY A)
LF 40.000 $20.000 $15.000 $28.000 $94.000 $27.000 $19.900 $30.000 $10.000 $14.400
GATE (TY 1)
EA 1.000 $1,080.000 $3,500.000 $2,200.000 $2,100.000 $2,174.000 $1,710.000 $2,000.000 $5,000.000 $1,680.000
REMOVE SM RD SN SUP&AM
EA 19.000 $108.750 $100.000 $450.000 $100.000 $200.000 $102.000 $50.000 $250.000 $96.000
PREFAB PAV MRK TY B (W)(6")(SLD)
LF 521.000 $4.000 $7.000 $6.000 $27.000 $8.150 $9.900 $25.000 $20.000 $4.800
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $7,500.000 $12,000.000 $12,000.000 $3,800.000 $8,670.000 $10,000.000 $12,500.000 $13,200.000
TMA (STATIONARY)
DAY 24.000 $300.000 $275.000 $750.000 $200.000 $273.000 $958.000 $250.000 $550.000 $217.200
Totals: $1,178,918.891 $1,105,702.150 $1,134,476.310 $1,142,323.250 $1,150,493.540 $1,284,486.400 $1,472,845.160 $1,553,463.000 $1,607,083.452