Bid Cobra

BRAZOS BS 6R (0049-09-102)

Items: 152

County: BRAZOS
Length: 4.1120 MILES
Highway: BS 6R
District: BRYAN
Control Number: 0049-09-102
DBE Goal: 4.0%
Project: F 2025(359)
Guaranty: $97,000.00
Time: 277 WORKING DAYS
Engineer's Estimate: $4,885,536.76
Date: 05/01/2025 (1 year ago)
Contract Number: 5253004
Type: INTERSECTION IMPROVEMENT
Project ID: A00206294
Contract Type: Federal
Project Description: UPGRADE SIGNALS, ITS, LANDSCAPING, AND PAVEMENT WORK
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JAMES ROBBINS
JOSEPH GREIVE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$4,885,536.76
$4,454,972.58
Over/Under Est: -8.81% -$430,564.18
$4,800,359.20
Over/Under Est: -1.74% -$85,177.56
Amt Left: 7.75% $345,386.62
$5,287,972.96
Over/Under Est: 8.24% $402,436.20
Amt Left: 18.7% $833,000.38
Delta: -10.16% -$487,613.76
Over/Under Est: 10.36% $506,207.56
Amt Left: 21.03% $936,771.74
Delta: -1.96% -$103,771.36
Subcontractor Percentage Amount
GREEN TEAMS, INC. 6.15% $273,980.81
SPEEDY PAVING 0.98% $43,658.73
CEN-TREE SOLUTIONS LLC 0.58% $25,838.84
CEN TEX HYDROSEED, INC. 0.21% $9,355.44
BUYERS BARRICADES HOUSTON, LLC 0.03% $1,336.49
Total: 7.95% $354,170.31

Bid Items & Bid Tabulations

152 Total 0 of 152
BRAZOS  |  BS 6R  |  BRYAN  |  0049-09-102  |  05/01/2025  |  $4,885,536.76  |  F 2025(359)  |  INTERS IMPRV  |  277 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
BRAZOS PAVING, INC.
TI-ZACK CONCRETE, LLC
KNIFE RIVER CORPORATION - SOUTH
PREPARING ROW
AC 1.030 $25,000.000 $11,000.000 $17,575.000 $11,500.000 $43,400.000
PREP ROW (TREE REMOVE) (0"-12" DIA)
EA 6.000 $975.000 $790.000 $775.000 $977.500 $667.000
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 17.000 $1,300.000 $1,200.000 $1,214.000 $1,437.500 $1,046.000
PREP ROW (TREE REMOVE) (24"-36" DIA)
EA 4.000 $2,400.000 $2,500.000 $2,325.000 $6,037.500 $2,000.000
PREP ROW (TREE REMOVE) (36"-48" DIA)
EA 1.000 $3,500.000 $3,600.000 $4,650.000 $8,625.000 $4,000.000
TREE PROTECTION (INSTALL)
EA 160.000 $590.000 $170.000 $165.000 $17.250 $140.000
REMOV CONC (PAV)
SY 95.000 $45.000 $14.000 $68.500 $21.000 $57.600
REMOV CONC (MEDIANS)
SY 326.000 $56.000 $14.000 $85.000 $24.480 $29.800
REMOV CONC (PAVERS)
SY 185.000 $24.000 $14.000 $45.000 $21.570 $32.400
REMOV CONC (DRIVEWAYS)
SY 529.000 $31.000 $14.000 $68.700 $30.170 $37.740
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 1,015.000 $33.000 $14.000 $49.600 $31.450 $51.800
REMOV CONC (CURB OR CURB & GUTTER)
LF 2,072.000 $15.000 $13.000 $15.210 $11.550 $79.120
REMOV CONC (MISC)
SY 53.000 $45.000 $14.000 $73.150 $30.110 $32.800
RMV (5"-9") TRT/UNTRT BASE & ASPH PAV
SY 40.000 $15.800 $20.000 $105.550 $39.900 $42.000
RMV (12"-16") TRT/UNTRT BASE & ASPH PAV
SY 2,528.000 $16.800 $29.000 $28.500 $18.940 $22.300
FURN & PLACE TOPSOIL (4")
SY 1,424.000 $6.150 $3.500 $10.500 $7.810 $14.000
GENERAL USE COMPOST (2")
SY 2,604.400 $3.000 $5.250 $5.150 $4.800 $10.000
BLOCK SODDING
SY 1,424.000 $10.000 $9.750 $9.700 $11.450 $8.330
FERTILIZER
AC 0.290 $1,635.000 $8,200.000 $8,000.000 $937.080 $2,000.000
VEGETATIVE WATERING
TGL 14.240 $330.000 $77.000 $54.750 $276.540 $70.000
IRRIGATION SYSTEM (TY II)
EA 1.000 $120,000.000 $55,000.000 $199,108.000 $279,975.550 $171,470.000
SOIL AMEND (TY I)
SY 2,604.400 $0.200 $1.000 $0.940 $1.020 $0.900
PLANT BED PREP (TY II)
SY 2,604.400 $0.850 $8.250 $7.900 $33.350 $6.830
LANDSCAPE EDGE (TY I)
LF 2,407.000 $8.900 $13.000 $12.850 $22.680 $11.060
LOOSE AGGR GRND COVER (TY I)
CY 602.200 $215.000 $150.000 $143.000 $231.910 $123.050
PLANT MATERIAL (1 GAL) (SHRUB)
EA 2,938.000 $15.000 $15.000 $13.800 $16.880 $11.880
PLANT MATERIAL (3 GAL) (SHRUB)
EA 3,150.000 $30.000 $50.000 $49.200 $41.580 $42.220
SOIL AMEND (TY II)
SY 2,604.400 $0.200 $0.750 $0.650 $1.020 $0.540
SOIL AMEND (TY III)
SY 2,604.400 $2.000 $1.250 $1.150 $2.910 $1.000
LANDSCAPE ESTABLISH
MO 12.000 $6,500.000 $1,900.000 $1,860.000 $10,279.400 $1,602.000
LANDSCAPE ESTABLISH
CYC 6.000 $12,500.000 $2,100.000 $4,020.000 $17,693.670 $3,462.000
LANDSCAPE TREAT (TY III)
CYC 1.000 $2,597.000 $160.000 $1,885.000 $57,802.770 $1,700.000
CM TRT(PT MX)(CL M)(TY D)(GR 4)(FN POS)
CY 191.000 $300.000 $280.000 $146.600 $517.500 $338.200
PRIME COAT (AE-P)
GAL 239.000 $17.000 $36.000 $6.800 $11.500 $53.000
D-GR HMA TY-D PG64-22
TON 9.000 $213.000 $540.000 $882.000 $402.500 $3,834.000
SP MIXES SP-B PG64-22
TON 502.000 $142.000 $260.000 $155.600 $294.400 $354.000
SP MIXES SP-C SAC-A PG76-22
TON 1,164.000 $162.000 $200.000 $152.300 $294.400 $270.730
PLANE ASPH CONC PAV(2")
SY 2,024.000 $5.650 $5.000 $6.500 $11.500 $14.000
PLANE ASPH CONC PAV(3")
SY 6,248.000 $6.100 $5.750 $7.500 $13.800 $6.740
CUT & RESTORING PAV
SY 4.000 $200.000 $440.000 $967.000 $126.500 $694.000
CEM STABIL BKFL
CY 18.000 $242.000 $140.000 $117.500 $287.500 $220.000
TRENCH EXCAVATION PROTECTION
LF 13.000 $29.000 $3.250 $87.800 $115.000 $171.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 60.000 $273.000 $200.000 $155.100 $138.230 $134.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 22.000 $456.000 $270.000 $220.900 $196.880 $190.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 65.000 $473.000 $280.000 $256.850 $228.760 $221.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 88.000 $692.000 $350.000 $412.200 $367.390 $355.000
CL A CONC (COLLAR)
EA 1.000 $1,800.000 $5,600.000 $1,584.600 $2,593.250 $2,430.000
RIPRAP (CONC)(5 IN)
CY 2.000 $830.000 $1,000.000 $886.100 $784.690 $1,104.000
RC PIPE (CL III)(36 IN)
LF 10.000 $225.000 $610.000 $528.600 $327.750 $800.000
INLET (COMPL)(TY AZ)(HOU)
EA 1.000 $8,455.000 $11,000.000 $12,850.000 $18,400.000 $9,275.000
ADJUSTING INLETS
EA 1.000 $2,800.000 $3,700.000 $4,037.000 $2,300.000 $6,360.000
ADJUSTING INLETS (CAP)
EA 1.000 $3,100.000 $2,300.000 $5,105.000 $1,725.000 $6,100.000
MOBILIZATION
LS 1.000 $425,000.000 $388,000.000 $285,000.000 $489,987.270 $322,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $11,000.000 $3,900.000 $16,485.000 $3,450.000 $20,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,900.000 $11,000.000 $38,320.000 $1.150 $15,000.000
TMA (STATIONARY)
DAY 83.000 $265.000 $320.000 $225.000 $1.150 $500.000
TMA (MOBILE OPERATION)
DAY 7.000 $225.000 $1,100.000 $495.000 $1.150 $950.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 45.000 $8.000 $5.750 $12.910 $1.150 $11.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 45.000 $2.600 $1.000 $6.460 $1.150 $5.500
LANDSCAPE PAVERS
SY 592.000 $120.000 $180.000 $126.600 $233.450 $120.000
CONC CURB (MONO) (TY II)
LF 512.000 $19.700 $15.000 $19.200 $60.430 $43.000
CONC CURB & GUTTER (TY II)
LF 1,869.000 $64.700 $49.000 $36.200 $60.430 $100.600
INTERSECTIONS (CONC)
SY 134.000 $99.000 $200.000 $116.200 $177.930 $193.000
INTERSECTIONS (ACP)
SY 724.000 $64.000 $56.000 $65.800 $115.000 $332.900
DRIVEWAYS (CONC) (HES)
SY 835.000 $137.000 $140.000 $132.000 $162.390 $207.340
CONC SIDEWALKS (6")
SY 1,488.000 $137.000 $110.000 $98.600 $131.850 $175.000
CURB RAMPS (TY 1)
EA 2.000 $3,000.000 $2,100.000 $1,575.000 $2,606.780 $1,730.000
CURB RAMPS (TY 6)
EA 2.000 $3,035.000 $2,100.000 $3,330.000 $2,606.780 $2,561.000
CURB RAMPS (TY 7)
EA 11.000 $3,200.000 $2,200.000 $2,545.000 $2,606.780 $3,225.000
CURB RAMPS (TY 10)
EA 2.000 $2,740.000 $2,200.000 $2,545.000 $2,606.780 $3,337.000
CURB RAMPS (TY 21)
EA 1.000 $3,450.000 $2,800.000 $1,836.000 $2,606.780 $1,954.000
CONC MEDIAN
SY 21.000 $168.000 $460.000 $185.000 $145.120 $1,280.000
CONCRETE MEDIAN (NOSE)
SY 6.000 $417.000 $520.000 $218.600 $168.500 $735.000
CONDT (PVC) (SCH 80) (2")
LF 790.000 $21.000 $14.000 $26.850 $17.190 $16.600
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,740.000 $33.250 $19.000 $27.350 $24.390 $23.570
CONDT (PVC) (SCH 80) (3")
LF 375.000 $31.000 $13.000 $29.350 $19.420 $18.800
CONDT (PVC) (SCH 80) (3") (BORE)
LF 90.000 $41.000 $21.000 $29.850 $26.620 $25.720
CONDT (PVC) (SCH 80) (4")
LF 265.000 $35.000 $15.000 $25.350 $22.010 $21.270
CONDT (PVC) (SCH 80) (4") (BORE)
LF 800.000 $48.000 $23.000 $36.800 $32.810 $31.700
ITS MULTI-DUCT CND (PVC-80)
LF 5,190.000 $26.500 $39.000 $27.900 $18.160 $17.540
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 21,215.000 $25.000 $22.000 $20.200 $18.010 $17.400
ITS MULTI-DUCT CND (RMC)
LF 200.000 $97.500 $250.000 $137.100 $122.210 $118.000
FIBER OPTIC CABLE ROAD MARKER
LF 46.000 $160.000 $100.000 $176.200 $157.030 $152.000
ELEC CONDR (NO.8) INSULATED
LF 3,100.000 $2.350 $2.250 $3.000 $2.730 $2.630
ELEC CONDR (NO.6) BARE
LF 2,100.000 $2.500 $2.250 $3.200 $2.860 $2.770
ELEC CONDR (NO.4) BARE
LF 70.000 $3.100 $2.750 $4.200 $3.730 $3.600
ELEC CONDR (NO.4) INSULATED
LF 120.000 $3.400 $3.250 $4.650 $4.160 $4.020
ITS GND BOX(PCAST) TY 2 (366036)
EA 11.000 $11,000.000 $6,900.000 $8,950.000 $7,979.070 $7,709.000
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 4.000 $9,300.000 $6,900.000 $9,355.000 $8,338.630 $8,057.000
GROUND BOX TY D (162922)
EA 18.000 $1,500.000 $1,000.000 $1,105.000 $985.440 $952.000
GROUND BOX TY D (162922)W/APRON
EA 32.000 $1,800.000 $1,100.000 $1,509.000 $1,345.010 $1,300.000
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
EA 3.000 $9,700.000 $8,200.000 $9,553.000 $8,514.600 $8,227.000
ALUMINUM SIGNS (TY A)
SF 299.000 $50.000 $61.000 $45.000 $31.140 $33.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 1.000 $550.000 $730.000 $710.000 $656.880 $635.000
REMOVE SM RD SN SUP&AM
EA 2.000 $157.500 $200.000 $194.000 $86.250 $84.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 5,050.000 $1.400 $2.750 $2.700 $1.270 $1.220
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 5,540.000 $1.500 $2.750 $2.700 $1.270 $1.220
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,220.000 $1.750 $3.250 $3.250 $2.010 $1.940
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,195.000 $10.850 $12.000 $11.750 $10.350 $10.000
PAVEMENT SLER 6"
LF 830.000 $0.650 $1.250 $1.300 $0.210 $1.000
PAVEMENT SLER 8"
LF 1,140.000 $0.750 $1.250 $1.300 $0.280 $0.300
PAVEMENT SLER 24"
LF 370.000 $2.900 $4.000 $3.900 $0.830 $0.900
PAVEMENT SLER (ARROW)
EA 14.000 $60.000 $33.000 $32.250 $5.750 $6.000
PAVEMENT SLER (WORD)
EA 14.000 $65.000 $33.000 $32.250 $5.750 $6.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 390.000 $3.100 $4.000 $3.900 $1.320 $1.300
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 830.000 $2.000 $2.750 $2.600 $1.320 $1.300
PREFAB PM TY C (W)(ARROW)
EA 14.000 $280.000 $460.000 $451.600 $323.580 $313.000
PREFAB PM TY C (W)(WORD)
EA 14.000 $345.000 $540.000 $529.000 $353.030 $340.000
REFL PAV MRKR TY I-C
EA 90.000 $7.100 $12.000 $11.600 $11.500 $11.000
REFL PAV MRKR TY II-A-A
EA 4.000 $10.700 $12.000 $11.600 $11.500 $11.000
ELIM EXT PM & MRKS (6")
LF 4,180.000 $1.100 $2.750 $2.600 $3.700 $3.600
PAV SURF PREP FOR MRK (6")
LF 830.000 $0.450 $1.250 $1.300 $0.020 $1.000
PAV SURF PREP FOR MRK (8")
LF 1,140.000 $1.000 $1.250 $1.300 $0.050 $1.000
PAV SURF PREP FOR MRK (24")
LF 370.000 $2.750 $4.000 $3.900 $0.140 $0.200
PAV SURF PREP FOR MRK (ARROW)
EA 14.000 $50.000 $20.000 $19.370 $5.750 $6.000
PAV SURF PREP FOR MRK (WORD)
EA 14.000 $53.000 $20.000 $19.370 $5.750 $6.000
INSTALL HWY TRF SIG (ISOLATED)
EA 3.000 $38,500.000 $70,000.000 $43,292.000 $38,587.100 $37,283.000
REMOVING TRAFFIC SIGNALS
EA 8.000 $7,700.000 $6,400.000 $5,120.000 $1,803.200 $1,744.000
VEH SIG SEC (12")LED(GRN)
EA 25.000 $357.000 $250.000 $331.000 $294.400 $285.000
VEH SIG SEC (12")LED(GRN ARW)
EA 8.000 $366.000 $250.000 $331.000 $294.400 $285.000
VEH SIG SEC (12")LED(YEL)
EA 25.000 $370.000 $250.000 $331.000 $294.400 $285.000
VEH SIG SEC (12")LED(YEL ARW)
EA 14.000 $360.000 $250.000 $331.000 $294.400 $285.000
VEH SIG SEC (12")LED(RED)
EA 25.000 $433.000 $250.000 $331.000 $294.400 $285.000
VEH SIG SEC (12")LED(RED ARW)
EA 8.000 $363.000 $250.000 $331.000 $294.400 $285.000
PED SIG SEC (LED)(COUNTDOWN)
EA 18.000 $916.000 $590.000 $845.400 $753.250 $728.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 27.000 $223.000 $170.000 $198.650 $175.950 $171.000
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 6.000 $253.000 $220.000 $251.800 $224.250 $217.000
TRF SIG CBL (TY A)(14 AWG)(1 CONDR)
LF 26,405.000 $1.400 $1.250 $2.250 $2.010 $1.940
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 2,625.000 $3.400 $2.250 $3.000 $2.670 $2.580
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 2,335.000 $4.700 $3.000 $3.500 $3.080 $2.980
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
LF 985.000 $3.800 $2.500 $4.110 $3.660 $3.530
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 2,570.000 $3.100 $1.500 $2.400 $2.150 $2.080
INS TRF SIG PL AM(S)1 ARM(24')LUM
EA 1.000 $14,400.000 $14,000.000 $17,008.000 $15,159.300 $14,647.000
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 1.000 $13,345.000 $14,000.000 $17,420.000 $15,525.000 $15,000.000
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $14,550.000 $17,000.000 $20,136.000 $17,948.050 $17,341.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 2.000 $17,275.000 $18,000.000 $21,466.000 $19,133.700 $18,487.000
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 3.000 $35,500.000 $42,000.000 $51,127.000 $45,571.050 $44,030.000
INS TRF SIG PL AM(S)2 ARM(40-28')LUM
EA 1.000 $17,000.000 $20,000.000 $23,700.000 $21,117.450 $20,400.000
INS TRF SIG PL AM(S)2 ARM(50 - 40')LUM
EA 1.000 $69,000.000 $44,000.000 $52,635.000 $46,914.250 $45,300.000
PED POLE ASSEMBLY
EA 10.000 $3,315.000 $1,500.000 $3,535.000 $3,148.700 $3,040.000
PED DETECT PUSH BUTTON (APS)
EA 18.000 $1,160.000 $1,200.000 $1,281.000 $1,142.240 $1,104.000
BONDING COURSE
GAL 883.000 $7.400 $7.750 $7.650 $11.500 $5.000
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 3.000 $9,700.000 $8,600.000 $12,250.000 $10,918.100 $10,550.000
VDS PROSR SYS
EA 3.000 $13,500.000 $14,000.000 $17,460.000 $15,561.800 $15,036.000
VIVDS CAM ASSY VAR LNS
EA 12.000 $3,200.000 $6,100.000 $8,270.000 $7,370.350 $7,122.000
VDS CNTRL SOFTWARE
EA 3.000 $520.000 $540.000 $808.000 $719.900 $696.000
VDS ATSPM
EA 3.000 $4,625.000 $4,200.000 $5,243.000 $4,672.450 $4,515.000
VDS CABLING
LF 1,880.000 $2.600 $1.750 $3.800 $3.370 $3.260
CCTV FIELD EQUIPMENT (DIGITAL)
EA 3.000 $9,605.000 $2,000.000 $3,725.000 $3,318.900 $3,207.000
ITS COM CBL (ETHERNET)
LF 275.000 $5.250 $2.750 $7.900 $7.040 $6.800
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 1,270.000 $6.850 $1.750 $7.950 $7.080 $6.840
FIBER OPTIC CBL (SNGL-MODE)(72 FIBER)
LF 52,810.000 $2.550 $2.500 $3.050 $2.710 $2.620
Totals: $4,885,536.750 $4,454,972.580 $4,800,359.196 $5,287,972.965 $5,391,744.318
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $230,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $240,000.00