BRAZOS US 190 (0049-09-089)

Items: 144

County: BRAZOS
Length: N/A
Highway: US 190
District: BRYAN
Control Number: 0049-09-089
DBE Goal: N/A
Project: STP 2022(860)HES
Guaranty: N/A
Time: 178 WORKING DAYS
Engineer's Estimate: $4,374,160.71
Date: 08/04/2022 (3 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
JAMES KREAMER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$4,374,160.71
Over/Under Est: 35.1% $1,535,486.59
Over/Under Est: 36.66% $1,603,402.41
Amt Left: 1.15% $67,915.82
Over/Under Est: 41.24% $1,804,107.14
Amt Left: 4.55% $268,620.55
Delta: -3.36% -$200,704.73
Over/Under Est: 46.02% $2,012,865.66
Amt Left: 8.08% $477,379.07
Delta: -3.38% -$208,758.52
$6,418,906.47
Over/Under Est: 46.75% $2,044,745.76
Amt Left: 8.62% $509,259.17
Delta: -0.50% -$31,880.10
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 6.05% $747,308.95
CEN TEX HYDROSEED, INC. 0.94% $116,110.81
MILSTEAD HIGHWAY SERVICES, LLC 0.93% $114,875.59
STRIPE LINES, INC. 0.92% $113,640.37
ODUM SERVICES, LLC 0.73% $90,171.16
BROCK CONSTRUCTION, LLC 0.29% $35,821.42
PROFESSIONAL TRAFFIC CONTROL LLC 0.08% $9,881.77
PINNACLE GRINDING AND GROOVING LLC 0.08% $9,881.77
THIRD COAST SERVICES LLC 0.07% $8,646.55
Total: 10.09% $1,246,338.39

Bid Items & Bid Tabulations

144 Total 0 of 144
BRAZOS  |  US 190  |  BRYAN  |  0049-09-089  |  08/04/2022  |  $4,374,160.71  |  STP 2022(860)HES  |  WIDEN ROAD - ADD LANES  |  178 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
BRAZOS PAVING, INC.
PREPARING ROW
AC 0.400 $5,600.000 $11,250.000 $10,000.000 $15,000.000 $30,000.000 $45,773.350
PREPARING ROW
STA 52.020 $5,000.000 $500.000 $1,000.000 $540.000 $1,500.000 $500.000
PREP ROW (TREE) (2" TO 12" DIA)
EA 3.000 $200.000 $2,700.000 $2,800.000 $3,200.000 $1,500.000 $1,800.000
REMOVING CONC (RIPRAP)
SY 105.000 $8.000 $50.000 $25.000 $20.800 $35.000 $64.250
REMOVING CONC (DRIVEWAYS)
SY 1,245.000 $12.000 $30.000 $28.000 $10.600 $35.000 $31.500
REMOVING CONC (CURB)
LF 97.000 $9.500 $50.000 $19.000 $21.500 $20.000 $30.000
REMOVING CONCRETE(MOW STRIP)
LF 1,055.000 $4.500 $18.000 $15.000 $5.160 $17.000 $30.000
REMOVE STAB BASE & ASPH PAV (24")
SY 1,045.000 $3.120 $10.000 $26.000 $21.260 $30.000 $62.000
SUBGRADE WIDENING (ORD COMP)
STA 132.500 $265.000 $1,500.000 $1,200.000 $1,046.500 $2,000.000 $53.300
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 230.000 $10.000 $65.000 $31.000 $24.500 $35.000 $35.310
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,592.000 $8.000 $45.000 $31.000 $27.160 $35.000 $35.310
BACKFILL (TY A)
STA 77.360 $100.000 $850.000 $410.000 $545.000 $400.000 $114.850
BACKFILL (TY A OR B)
STA 69.080 $140.000 $850.000 $410.000 $523.000 $400.000 $115.360
FURNISHING AND PLACING TOPSOIL (4")
SY 68,476.000 $0.900 $1.250 $1.000 $3.000 $1.500 $4.750
BLOCK SODDING
SY 9,861.000 $4.000 $5.000 $5.000 $5.880 $6.000 $6.250
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 58,642.000 $0.160 $0.150 $0.150 $0.180 $0.150 $0.190
BROADCAST SEED (TEMP) (WARM)
SY 10,687.000 $0.140 $0.120 $0.120 $0.140 $0.140 $0.150
BROADCAST SEED (TEMP) (COOL)
SY 10,687.000 $0.140 $0.120 $0.120 $0.140 $0.140 $0.150
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 37,269.000 $0.200 $0.120 $0.120 $0.140 $0.140 $0.150
VEGETATIVE WATERING
MG 682.000 $13.000 $5.000 $30.000 $41.000 $20.000 $14.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(14")
SY 7,132.000 $28.000 $53.000 $65.000 $41.290 $45.000 $48.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 234.000 $180.000 $300.000 $200.000 $419.000 $325.000 $342.380
LIME TRT (SUBGRADE)(8")
SY 15,986.000 $10.000 $8.250 $9.000 $3.980 $7.000 $16.500
LIME TRT (SUBGRADE)(6")
SY 3,757.000 $2.800 $6.000 $6.000 $4.230 $8.000 $14.000
CEM TRT(PLNT MX)(CL M)(TY A)(GR 4)(8")
SY 10,443.000 $27.100 $37.000 $33.770 $26.900 $38.000 $25.970
ASPH (RC-250)
GAL 4,980.000 $4.000 $13.500 $9.500 $8.260 $7.000 $6.600
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 136.000 $130.000 $200.000 $500.000 $320.000 $250.000 $240.000
PFC (ASPHALT) PG76-22
TON 17.000 $125.000 $187.000 $290.000 $189.000 $250.000 $290.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 247.000 $128.000 $187.000 $290.000 $189.000 $250.000 $290.000
PLANE ASPH CONC PAV (3")
SY 24,408.000 $2.000 $4.300 $3.500 $2.490 $3.500 $4.600
PLANE ASPH CONC PAV (1 1/4")
SY 1,099.000 $1.050 $8.000 $4.000 $6.650 $6.000 $4.000
CEM STABIL BKFL
CY 10.000 $84.000 $200.000 $107.000 $236.000 $300.000 $161.500
TEMPORARY SPL SHORING
SF 800.000 $18.000 $65.000 $38.000 $76.470 $60.000 $45.000
DRILL SHAFT (24 IN)
LF 24.000 $159.000 $135.000 $230.000 $265.000 $200.000 $168.750
RIPRAP (CONC)(4 IN)
CY 13.200 $430.000 $600.000 $700.000 $612.000 $750.000 $176.650
RIPRAP (STONE PROTECTION)(18 IN)
CY 11.000 $150.000 $200.000 $330.000 $235.000 $300.000 $89.250
RIPRAP (MOW STRIP)(4 IN)
CY 21.000 $480.000 $700.000 $700.000 $636.000 $750.000 $177.650
CMP (GAL STL 30 IN)
LF 16.000 $130.000 $200.000 $420.000 $235.000 $150.000 $206.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 5.000 $650.000 $750.000 $1,700.000 $882.000 $950.000 $535.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 6.000 $700.000 $850.000 $1,800.000 $1,000.000 $1,000.000 $775.000
RC PIPE (CL III)(15 IN)
LF 38.000 $70.000 $48.000 $190.000 $56.500 $130.000 $115.600
RC PIPE (CL III)(18 IN)
LF 442.000 $70.000 $56.000 $92.000 $66.000 $140.000 $111.000
RC PIPE (CL III)(24 IN)
LF 138.000 $90.000 $145.000 $112.000 $171.000 $150.000 $143.750
RC PIPE (CL III)(27 IN)
LF 36.000 $90.000 $180.000 $130.000 $212.000 $175.000 $178.600
RC PIPE (CL III)(30 IN)
LF 10.000 $100.000 $225.000 $400.000 $265.000 $400.000 $216.500
RC PIPE (CL III)(42 IN)
LF 12.000 $155.000 $350.000 $425.000 $412.000 $550.000 $360.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $8,000.000 $4,500.000 $5,800.000 $5,294.000 $7,000.000 $6,800.000
HEADWALL (CH - FW - 0) (DIA= 42 IN)
EA 1.000 $6,800.000 $6,500.000 $8,700.000 $7,647.000 $8,000.000 $8,500.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $6,000.000 $5,500.000 $7,000.000 $6,470.000 $11,000.000 $7,200.000
WINGWALL (PW - 2) (HW=6 FT)
EA 1.000 $15,000.000 $26,000.000 $30,000.000 $30,586.000 $20,000.000 $12,500.000
HEADWALL (CH-PW-0)(SPL)
EA 4.000 $7,560.000 $32,000.000 $55,000.000 $37,645.000 $75,000.000 $8,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 1.000 $5,430.310 $6,000.000 $7,300.000 $7,058.000 $6,500.000 $4,000.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 6.000 $600.000 $900.000 $1,600.000 $1,059.000 $2,200.000 $2,850.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 29.000 $1,000.000 $1,000.000 $1,800.000 $1,176.000 $2,500.000 $3,800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $1,300.000 $1,500.000 $2,200.000 $1,765.000 $3,500.000 $4,800.000
REMOV & RE - LAY PIPE (15 IN)
LF 51.000 $35.000 $50.000 $115.000 $59.000 $95.000 $130.000
REMOV & RE - LAY PIPE (18 IN)
LF 50.000 $45.000 $60.000 $80.000 $71.000 $100.000 $147.000
REMOV & RE - LAY PIPE (24 IN)
LF 50.000 $75.000 $75.000 $80.000 $88.000 $110.000 $175.000
REMOV STR (SET)
EA 7.000 $350.000 $750.000 $500.000 $882.000 $350.000 $2,000.000
REMOV STR (WINGWALL)
EA 6.000 $2,500.000 $1,200.000 $1,200.000 $1,412.000 $2,500.000 $2,500.000
REMOV STR (HEADWALL)
EA 2.000 $2,500.000 $1,200.000 $1,200.000 $1,412.000 $2,500.000 $2,500.000
REMOV STR (PIPE)
LF 4.000 $19.000 $50.000 $700.000 $59.000 $50.000 $175.000
REMOV STR (PIPE)
EA 212.000 $525.000 $550.000 $30.000 $600.000 $75.000 $25.000
MOBILIZATION
LS 1.000 $390,000.000 $300,000.000 $445,000.000 $628,000.000 $615,000.000 $376,825.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $6,100.000 $8,000.000 $4,000.000 $25,000.000 $12,500.000 $6,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 580.000 $30.000 $30.000 $32.000 $37.640 $40.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 580.000 $8.000 $10.000 $10.000 $11.760 $10.000 $12.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,279.000 $3.000 $3.250 $4.000 $3.820 $4.000 $4.050
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,279.000 $0.800 $1.000 $1.000 $1.000 $1.000 $1.250
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 340.000 $5.000 $4.000 $4.000 $4.710 $5.000 $5.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 375.000 $4.000 $5.000 $5.000 $5.880 $6.000 $6.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 715.000 $1.250 $1.000 $1.000 $1.200 $1.000 $1.250
INTERSECTIONS (ACP)
SY 1,913.000 $42.000 $55.000 $23.000 $21.500 $40.000 $43.750
INTERSECTIONS (SURF TREAT)
SY 28.000 $20.000 $70.000 $58.000 $395.000 $100.000 $135.000
DRIVEWAYS (CONC)
SY 779.000 $90.000 $130.000 $114.000 $130.000 $110.000 $104.400
DRIVEWAYS (ACP)
SY 2,770.000 $45.000 $65.000 $92.000 $87.400 $45.000 $70.000
DRIVEWAYS (SURF TREAT)
SY 307.000 $10.000 $55.000 $58.000 $180.000 $45.000 $40.000
TURNOUTS (SURF TREAT)
SY 37.000 $10.000 $55.000 $58.000 $155.000 $50.000 $40.000
DRIVEWAYS (CONC) (HES)
SY 445.000 $87.000 $150.000 $133.000 $128.000 $125.000 $104.400
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 14,487.000 $1.250 $1.000 $0.800 $0.590 $1.000 $0.200
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 11,422.000 $1.000 $1.000 $0.700 $0.590 $1.000 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $30.000 $28.000 $27.000 $30.590 $35.000 $35.250
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,400.000 $1,445.000 $1,600.000 $1,877.000 $1,500.000 $1,819.000
REMOVE METAL BEAM GUARD FENCE
LF 613.000 $2.500 $0.550 $2.500 $2.940 $3.000 $0.700
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $170.000 $150.000 $150.000 $177.000 $250.000 $188.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,600.000 $330.000 $3,100.000 $3,535.000 $3,500.000 $4,163.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $230.000 $150.000 $176.000 $250.000 $288.000
MAILBOX INSTALL-S (TWG-POST) TY 4
EA 14.000 $230.000 $240.000 $270.000 $318.000 $250.000 $300.000
MAILBOX INSTALL-D (TWG-POST) TY 4
EA 3.000 $280.000 $345.000 $330.000 $388.000 $350.000 $431.300
MAILBOX INSTALL-M (TWG-POST) TY 4
EA 3.000 $300.000 $650.000 $620.000 $723.000 $700.000 $812.600
ALUMINUM SIGNS (TY G)
SF 306.500 $25.000 $24.000 $38.000 $44.120 $30.000 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 39.000 $600.000 $495.000 $480.000 $559.000 $500.000 $620.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $700.000 $675.000 $670.000 $782.000 $750.000 $645.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $950.000 $800.000 $710.000 $830.000 $850.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $1,000.000 $950.000 $920.000 $1,082.000 $1,000.000 $1,190.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 6.000 $1,200.000 $1,100.000 $1,120.000 $1,312.000 $1,200.000 $1,375.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $420.000 $350.000 $400.000 $459.000 $400.000 $438.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $575.000 $400.000 $510.000 $600.000 $450.000 $500.000
REMOVE SM RD SN SUP&AM
EA 62.000 $100.000 $48.000 $100.000 $118.000 $75.000 $60.000
INSTALL LRSS (STRUCT STEEL)
LB 1,279.300 $6.000 $5.400 $5.200 $6.000 $6.000 $6.750
REMOVE OVERHD SIGN SUP
EA 1.000 $4,500.000 $17,000.000 $8,000.000 $8,000.000 $3,500.000 $340.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 2.000 $3,000.000 $1,500.000 $2,000.000 $1,880.000 $2,500.000 $340.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 5.000 $30.000 $60.000 $26.000 $30.000 $75.000 $75.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 9.000 $90.000 $75.000 $180.000 $206.000 $80.000 $93.750
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 5,477.000 $0.200 $0.350 $0.350 $0.410 $0.300 $2.500
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 4,336.000 $0.250 $0.350 $0.350 $0.410 $0.300 $2.500
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 29,300.000 $0.240 $0.350 $0.350 $0.410 $0.300 $1.900
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 178.000 $1.000 $2.000 $2.000 $1.000 $1.250 $1.100
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,953.000 $1.100 $1.500 $2.000 $1.000 $1.250 $1.100
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,160.000 $1.000 $3.000 $2.000 $1.000 $1.250 $1.100
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 340.000 $1.100 $0.480 $0.500 $0.560 $3.000 $1.250
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,674.000 $1.000 $1.080 $1.100 $1.270 $2.000 $1.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,000.000 $1.000 $1.300 $1.300 $1.530 $2.000 $1.250
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
LF 290.000 $4.000 $3.000 $3.000 $3.530 $5.000 $5.000
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 1,050.000 $4.000 $3.000 $3.000 $3.530 $4.000 $5.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 35.000 $6.500 $7.000 $7.000 $8.230 $9.000 $7.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 83.000 $6.500 $8.000 $8.000 $9.410 $9.000 $7.500
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 9.000 $150.000 $175.000 $180.000 $206.000 $150.000 $175.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 18.000 $150.000 $200.000 $200.000 $235.000 $150.000 $175.000
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
EA 6.000 $200.000 $225.000 $230.000 $265.000 $300.000 $312.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 7.000 $160.000 $185.000 $190.000 $218.000 $200.000 $225.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $150.000 $215.000 $220.000 $253.000 $250.000 $225.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 14.000 $35.000 $50.000 $50.000 $59.000 $80.000 $81.250
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 14,912.000 $0.400 $0.480 $0.500 $0.560 $0.500 $1.250
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 17,272.000 $0.400 $0.540 $0.550 $0.640 $0.500 $1.250
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,746.000 $0.350 $0.540 $0.550 $0.640 $0.600 $1.250
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 11,422.000 $0.400 $0.480 $0.500 $0.560 $0.500 $1.250
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 22,168.000 $0.400 $0.540 $0.550 $0.640 $0.500 $1.250
REFL PAV MRKR TY I-C
EA 50.000 $3.250 $6.000 $6.000 $8.000 $6.000 $6.250
REFL PAV MRKR TY II-A-A
EA 1,185.000 $3.000 $6.000 $6.000 $7.060 $6.000 $4.500
REFL PAV MRKR TY II-C-R
EA 200.000 $3.400 $6.000 $6.000 $7.060 $6.000 $6.250
ELIM EXT PAV MRK & MRKS (4")
LF 3,536.000 $0.250 $0.240 $0.240 $0.280 $1.000 $1.250
SP MIXES SP-B PG64-22
TON 273.000 $94.000 $170.000 $152.000 $144.000 $140.000 $178.000
SP MIXES SP-B SAC-B PG64-22
TON 1,163.000 $93.790 $119.500 $134.000 $121.000 $140.000 $178.000
SP MIXES SP-C PG64-22
TON 1,809.000 $100.000 $110.750 $145.000 $119.000 $135.000 $144.000
SP MIXES SP-C SAC-A PG70-22
TON 9,440.000 $100.000 $133.200 $131.000 $126.000 $137.000 $162.000
SP MIXES SP-C SAC-B PG70-22
TON 438.000 $100.000 $138.500 $153.000 $136.000 $135.000 $144.000
SP MIXES SP-C SAC-A PG76-22
TON 1,449.000 $115.000 $146.000 $170.000 $137.000 $140.000 $168.000
SP MIXES SP-C SAC-B PG76-22
TON 103.000 $100.000 $186.000 $185.000 $226.000 $200.000 $155.000
SP MIXES SP-D SAC-A PG64-22
TON 286.000 $100.000 $139.000 $175.000 $144.000 $150.000 $156.000
BONDING COURSE
GAL 10,594.000 $3.000 $5.500 $3.600 $8.100 $4.500 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 10.000 $10,000.000 $12,000.000 $5,400.000 $4,400.000 $7,200.000 $12,180.000
TMA (STATIONARY)
DAY 178.000 $160.000 $250.000 $210.000 $600.000 $190.000 $240.000
TMA (MOBILE OPERATION)
DAY 10.000 $250.000 $250.000 $210.000 $900.000 $525.000 $475.000
Totals: $4,374,160.710 $5,909,647.300 $5,977,563.120 $6,178,267.850 $6,387,026.370 $6,418,906.490